The vast majority of train operating companies use automated announcements at their stations. LNER (who previously used manual announcements only) have rolled out Atos Anne at all their stations (correct as of June 2023), which means that Merseyrail are now the only TOC to not use automated announcements at any of their managed stations.
Within the platform listings, zones are separated with commas and platforms within zones are given as a range with a hyphen. This should be sufficient, unless there are any stations where non-contiguous platforms are within the same zone, in which case a + is used to link those non-contiguous platforms. "Global" indicates that the station is not zoned and that all announcements are played through all speakers.
From 2023, 'TOC' will not always be announced at stations which only have 1 operator serving it, this is already in place on Southeastern and Chiltern Railways.
See also: Trains
Current Voice artist legend[]
Currently in the UK, there are seven different types of CIS systems used (with the acceptation of some manual announcements, which are likely to be controlled by Worldline Atos) which are Blackbox, Worldline Atos, KeTech, Amey, iVENCS, Siemens and Telent.
Please note that MicroPA announcements are produced by the departure board software, not the CIS; a CIS will still be used at the station to provide the data and this may be from any CIS provider.
The current voice actors are listed below:
System | Name | Years | Information |
---|---|---|---|
Worldline Atos | Ruth Mitchell | 1996-present | Former British Rail, Wales and West and Wessex employee. Voice of TfW Atos system (English announcements only). Ruth was first installed at Truro station in 1996. |
Eryl/"Glyn" | 1998-present | Welsh language announcements for Transport for Wales Atos system also TfW employee. His real name is Eryl Jones. | |
Anne | 1999-present | Worldline Atos employee in the CIS sector and default voice of their system. She is the most commonly used announcer in the UK. | |
Mike
(Rob) |
2002-present | Network Rail and Southeastern's male voice for the Worldline Atos system. | |
Matt | 2011-present | Govia Thameslink Railway (GTR) employee, male voice for their Atos system and "Mind the Gap" on-board Class 700s. | |
Rodger | 2011-present | Male voice for GWR and SWR Worldline Atos system. Rodger was a GWR employee. | |
Karen Cunningham | 2011-present | Now at Edinburgh Waverley (as of winter 2013), and also at Glasgow Central (as of spring 2011) and Glasgow Queen Street (as of summer 2014) An Atos Scottish system. | |
KeTech | Celia Drummond | 1996 - 2021 (recordings)
1996-present (overall) |
Celia Drummond, professional voice artist formerly announced for Ditra, is now the female default voice of KeTech. Celia sadly passed away on 11th January 2021. |
Alison McKay | 2004-present | Professional voice over artist and female voice of KeTech used at ScotRail stations. | |
Michael Comyn | 200?-present | Professional voice over artist and male voice of KeTech used at IrishRail stations. | |
Only Woman | 2021-present | Only Woman, is a professional voiceover artist (originally thought to be Emma Topping) called Only Woman, because of the word only at calling points with one two stations left, instead of just one. She was used at Virgin Trains West Coast (now Avanti West Coast) and some Southern and Network Rail stations (such as London Victoria, Blackpool North and more). She was phased out in 2018, although until February 2024 she was heard at Norwood Junction, saying one recording (City Thameslink), along with calling points that Emma has announced on Thameslink services to Bedford.
Only Woman now does newer recordings on Northern's KeTech CIS system, such as "Lumo" TOC message at Morpeth and "for a connecting bus service to" on routes with replacement buses in operation since Celia's passing. | |
MicroPA | Acapela Rachel | 20??-present | Text-to-speech system voice. Mainly programmed into the Passenger information system displays at a selected number of stations in the country including those that don't have the automated announcements. |
Geriant | 2019-present | Text-to-speech system voice. Only used at some smaller TfW stations having replaced Acapela Rachel during 2019 in order to meet Welsh Language Standards. | |
Amey | Emma Hignett | 2010-2024 | Emma Hignett, professional voice artist, voice of London Overground's Amey and formerly Thales (Used on East London Line) Systems.
Emma also announced Thameslink services at Norwood Junction (Only Woman announced City Thameslink). As of 2024, Emma is currently being replaced on the Amey system by Atos Anne. Emma will be kept and used on Siemens on the Elizabeth line core. |
Siemens | 2022-present | Emma Hignett, professional voice artist, voice of London Overground's Amey and formerly Thales (Used on East London Line) Systems also announces Elizabeth line services between Paddington and Abbey Wood. Emma also announces BTP, Luggage, CCTV and yellow line at the west section of the Elizabeth line. | |
iVENCS | Scottish Female | 2008-present | Female voice on iVENCS system for ScotRail stations and is largely used in ScotRail stations. She has also been installed in Low Level stations and other train stations that was previously voiced by Alison McKay. |
DLR Female | 2010-present | Female voice for DLR stations. | |
Tyne Woman | 2001-present | Female voice used for Tyne & Wear Metro services in Newcastle-upon-Tyne from 2001. Also formerly used on the Metro trains until replaced with Mark Bryant - only units 994073 and 994081 kept these announcements. The female voice was also used on the unrefurbished units 994040 and 994083 until they were taken out of service in late 2023. | |
Elinor Hamilton | 200?-present | Victoria and a couple of other tube stations on the Bakerloo and Central lines use Elinor on the iVENCS system, having replaced Pauline Cavilla. | |
Telent | Used on many London Underground tube stations. Professional voice artist who was married to Phil Sayer who was also a male professional voice artist until he died in 2016. | ||
Phil Sayer | 1996-2016 (recordings)
1996-present (overall) |
Phil only does generic announcements at London Underground stations such as "mind the gap please", left luggage and pickpockets as well as Inspector Sands and evacuation and formerly announced at National rail stations on the Amey/Ditra, Funkwerk and KeTech systems. Phil sadly passed away on 15th April 2016. | |
Blackbox | Ivona Amy | 2019 - present | Text-to-speech system voice from Amazon Polly. Replaced Anne at all Greater Anglia managed stations (excluding Berney Arms) around May/June 2020, although in 2019 it was installed at Meridian Water and Ely before replacing Anne at all WMT (LNWR and WMR) managed stations (excluding Bordesley and Polesworth) during 2022-2023. The neural version of the voice is now used. |
Avanti West Coast stations[]
Anne was installed in 2018 at all stations also with announcements having chimes by Virgin Trains, Avanti West Coast then took over on 8th December 2019, Avanti also disabled the announcement chimes in 2020
Station | System | Voice | Platforms | Notes : |
---|---|---|---|---|
Birmingham International | Atos | Anne | Global | Anne replaced Only Woman in March 2018. |
Carlisle | Atos | Anne | Global | The final station to receive the Atos system, having been installed in July 2018, replacing Only Woman. |
Coventry | Atos | Anne | Global | Manual system replaced with the Ditra system in May 2017. Atos System replaced Ditra system in February 2018. |
Crewe | Atos | Anne | Global | Atos Anne replaced Only Woman in March 2018. System global for all announcements. |
Lancaster | Atos | Anne | Global | Anne replaced Only Woman in March 2018. |
Macclesfield | Atos | Anne | Global | Anne replaced Only Woman in 2018. |
Oxenholme Lake District | Atos | Anne | Global | Anne replaced Only Woman in 2018. |
Penrith North Lakes | Atos | Anne | Global | Anne replaced Only Woman in 2018. |
Preston | Atos | Anne | 1-2,
3+4+3C+4C 5-6 |
Anne replaced Only Woman in March 2018. Is now zoned.
Atos chimes disabled in 2020. Subway speakers only play manual announcements. Zones are announced for Avanti West Coast Pendolino services. Zone locations for Super Voyager services are not announced. No CIS screen on P7 as it is not open to the public. |
Rugby | Atos | Anne | Global | Anne replaced Only Woman in 2018. |
Runcorn | Atos | Anne | Global | Anne replaced Only Woman in 2018. |
Stafford | Atos | Anne | Global | Manual system replaced with the Ditra system. Ditra system replaced with the Atos system in March 2018.
Announcements are very loud at the open ends of the stations. |
Stockport | Atos | Anne | Global | Anne replaced Only Woman in March 2018. |
Stoke-on-Trent | Atos | Anne | Global | Manual replaced in Winter 2016. Ditra system replaced In March 2018.
New Infotec screens installed early 2024. |
Warrington Bank Quay | Atos | Anne | Global | Anne replaced Only Woman in March 2018. |
Wigan North Western | Atos | Anne | Global | No chimes. Anne replaced Only Woman in March 2018.
Zones are announced for Avanti West Coast Pendolino services. Zone locations for Super Voyager services are not announced. |
Network Rail Stations[]
Station | System | Voice | Platforms | Extra Information | |
---|---|---|---|---|---|
Birmingham New Street | Atos | Manual + Anne | 1, 2-3, 4-5, 6-7, 8-9, 10-11, 12 | Andrew "Andy The Brummie Guy" Smith left Birmingham New Street In 2016 and was replaced by Anne. Celia and Phil were replaced in 2013 when the station was modernised. In July 2019 Network Rail disabled arrival and departure announcements at the station "due to noise pollution around the station and platforms". Platform alterations, safety, Security and cancellation announcements are still being played.[1] | |
Bristol Temple Meads | Atos | Anne | 1, 3, 4, 9-12 | Celia was replaced in 2012.
There is no platform 14. Note: Unlike other NR managed stations the Atos worldline CIS is managed and controlled by GWR. |
|
Rodger | 5-8, 13-15 | ||||
Clapham Junction | Atos | Anne | 5-6,
9, 11-12, 15-16, (17) |
No chimes at all platforms.
1-2 announcements per train(Depends on platforms or situation). Rodger announces "Please mind the gap between the train and the platform edge." at all platforms. Times are not announced for Victoria or Waterloo-bound trains. Network Rail took over the management of Clapham Junction station from South Western Railway in April 2018. However unlike other NR managed stations the CIS is controlled by SWR. The Atos system had took over the Ditra system in early February 2019. There are no announcements on Platforms 1, 2 and 17. Note: Unlike other NR managed stations the Atos worldline CIS is managed and controlled by SWR. |
|
Rodger | 3-4,
7-8, 10, 13-14 |
||||
Ebbsfleet International | Atos | Anne | 2-3, 5-6 | Anne is only global on SE platforms, SE manual announcements are zoned. This station is managed by Network Rail. SE manages the CIS. | |
KeTech | Celia Drummond | 1, 4 | Celia announces Eurostar. No announcements previously, Eurostar platforms. Eurostar stopped serving Ebbsfleet and Ashford in March 2020. | ||
Edinburgh Waverley | Atos | Karen Cunningham | Global | Karen Cunningham replaced Juliet Donnachie in Winter 2013. | |
Glasgow Central | Atos | Karen Cunningham | 1-15 | Karen replaced Juliet Donnachie in Spring 2011.
Announcements (depending on where the train is) are split into either at the rear or front of the platforms i.e. "The rear of Platform 6 will be the..." or "The front of Platform 14..." Alison replaced by Scottish Female on Low level platforms. |
|
iVENCS | Scottish Female | 16-17 | |||
Guildford | Atos | Anne | 1-2,
5-6 |
Chimes used in all Automated Train announcements.
Subway and Station Concourse train announcements are from all Platforms in random. The Atos system had replaced the Ditra system on Wednesday 24/4/2019. All announcements in Guildford station can only be heard between 0700-2200 daily due to noise restrictions being imposed on the station. Network Rail took over the management of Guildford station from SWR in April 2018. Platforms 6 and 7 share the same track but all doors open on Platform 6. Note: Unlike other NR managed stations the Atos worldline CIS is managed and controlled by SWR. |
|
Rodger | 3-4,
7-8 |
||||
Leeds | Atos | Anne | Global | Likely the first few stations to use the Anne voice (Phil (Funkwerk) was replaced by Anne in 2002). Speakers at the north end of the station are louder than the rest, subsequently causing the announcements to echo. Announcements are still quiet everywhere else.
Uses original take of 'The next train to depart from Platform (X)' like Charing Cross. Platform 0/0A/0B/0C added in 2020. |
|
Liverpool Lime Street | Atos | Anne | 1-10 | Anne now announces 'Transport for Wales' and short platforms at this station but the announcement goes quiet until locations and carriage formation is announced.
One announcement per train only 3 minutes before departure starting with "The next train to depart from Platform X will be the...". No Announcements on the Merseyrail platform (Platform A) unless Merseyrail staff do manual announcements. |
|
London Bridge | Atos | Mike | 1, 4, 6-7, 10-15 | One of the first few station to have the Atos system in 2002 using Anne and the first station to have Mike. Usually 1 to 2 announcements per train.
In 2020 Southeastern took over CIS at London Bridge as they use "This train has X coaches", previously "This train is formed of". Also extra information such as "Sorry, some standard toilets on this train are out of use." and also lifts out of use. Rachel announces smoking at this station. Anne announces BTP 61016. At Platforms 10-15, Mike announces "The train at Platform X." if the train is starting at this station. Platforms 1-3/6-9 - Southeastern. Platforms 4/5 - Thameslink (who also uses their own CIS screens like at stations in the Thameslink core). Platforms 10-15 - Southern. |
|
Anne | 2-3, 5, 8-9 | ||||
London Cannon Street | Atos | Mike | Global | Announcements in the concourse are quiet. | |
London Charing Cross | Atos | Anne | Global | One of the first few stations to have Atos announcements. Anne replaced John Elgar in 2003.
Uses original take of 'The next train to depart from Platform (X)' like Leeds. Announcements are made in SE format hence using 'This train has (X) coaches'. Typically one or two announcements per train 3 to 5 minutes before departure, depending on the situation/time of day. |
|
London Euston | Atos | Anne | Global | Local announcements on platforms. Typically one announcement per train with "Platform X for the...", "The next train to depart from Platform X will be the..." or "The train at Platform X is the..."
Anne also announces "Caledonian Sleeper". Mike was trialled for a couple weeks in 2014 before switching back to Anne due to the trial being a mess with many stations not being announced. New LCD CIS screens replaced the old ones located above the concourse instead of the ticket barriers. The new LCD CIS screens are also installed in The Piazza outside the station. |
|
London King's Cross | Atos | Anne | Global | 1 to 3 announcements per train, depends on the time during the day and the train operator. The final announcement is played 3 minutes before departure. Short platforms are announced first before announcing coach formation. | |
London Liverpool Street | Atos | Anne | Global | One announcements per train by Anne 5 minutes before departure with "The train at Platform X is the...". Announcements are faulty.
Ivona Amy originally replaced Anne on a temporary trial basis for two weeks in early 2023. In June 2023, Anne and Amy began working together. Prior to full Amy take over 7th June 2023. Anne has returned to the station in end of July 2023 but announcements are faulty during announcements calling points or train formation the announcement cuts off. As of December 2023 Anne only announces BTP 61016 and generic messages such as "CCTV recording is in operation at this station" but no train departures, still faulty. Despite the station being managed by Network Rail, Greater Anglia controls the CIS and announcements here. |
|
London Paddington | Atos | Anne | Global | 2 announcements per train where the first announcement starts with "Platform X for the......", which is played once the platform number is shown on the screen.
Second announcement starts with "The train at Platform X is the ......", which is played 3 mins before departure. Anne will only announce Heathrow Express services if they were departing from a different platform to usual. Two-tone chimes are sometimes used like Great Western stations. There are no announcements on Platforms 6 & 7. Platforms numbered 1 to 12 and 14. Platform 13 was decomissioned in December 2016 to permit lengthening of Platform 12 for 10-car trains. |
|
London St Pancras International | Atos | Anne | 1-4 | East Midlands Railway platforms. New Infotec white CIS screens were installed in 2020/21. Unknown TTS Male announces safety & security information across St Pancras Station for EMR and Southeastern Platforms.
Anne introduced to the EMR platforms late January 2024. Two announcements made per service - one as soon as it is advertised on the departure boards and another announcement made 5 minutes prior to its departure time. |
|
KeTech | Celia Drummond | 5, 8-10 | Eurostar. Announcements only play in the departures lounge after security and border checks and in the business premier lounge as of December 2023. Celia announces English first then French. | ||
Atos | Anne | 11-13 | Southeastern High Speed. CIS on Platforms 11-13 is managed by Southeastern.
Anne replaced Mark Stutter in 2012. Announcement times variate but at the moment 3 mins before departure. SE Announcements are now announced along the walkway to LU Ticket Office. New Infotec White Screens installed on Platform 13 in September 2023, Platform 11/12/13 installed in December 2023. |
||
Atos | Matt | A | Low level platforms (Thameslink services only). Platforms lettered, so as to not confuse with the numbered high level platforms.
Announcement volume tends to fluctuate some announcements will go loud and then go quiet. CIS is managed by Thameslink like other stations on the core section. |
||
Anne | B | ||||
London Victoria | Atos | Anne | 1-8 | Anne announces Southeastern services and Matt announces Southern and Gatwick Express services. Only Woman was replaced in early 2018 and before Phil until early 2013. | |
Matt | 9-19 | ||||
London Waterloo | Atos | Anne | Global | Phil replaced by Celia on 5th April 2017. Amey/Ditra's New Celia version had replaced the Old Celia version in July 2017 when Platforms 20-24 opened. Anne replaced New Celia in Mid-Late February 2019. Trains are announced 7 and/or 4 minutes before departure time. Anne originally announced BTP 61016 when Celia was announcing at the station, when Atos took over Anne's new BTP is announced at this station. Anne also announces TfL travel information.
Celia also announced Eurostar services before they were discontinued on 13th November 2007. Note: Unlike other NR managed stations the Atos worldline CIS is managed and controlled by SWR. |
|
Manchester Piccadilly | Atos | Anne | 1-12, 13-14 | Announcements on Platforms 13 & 14 are faulty, some announcements are cut off (i.e Warrington Bank Q''y.) Short platforms are also announced.
Announcements are very clear on Platforms 1-12 via the portrait speakers near the footbridge. Stand clear announcements for P13/14 use the old WMT version "Please stand back from the platform edge! The next train at Platform X does not stop here." Also use GWR generic announcement "mind the gap" and "pickpockets". Platforms A and B are Manchester Metrolink platforms which have their own announcements. |
|
Reading | Atos | Anne | 1-3, 4-6, 7, 8-9, 10-11, 12-13, 14-15 | Phil & Celia were previous announcers for this station since 2000, Phil took over announcements from Celia in 2011 during redevelopment works.
Atos took over Ditra in 2012. Network Rail took over Reading from First Great Western during redevelopment. Anne also announces TfL travel information. Note: Unlike other NR managed stations the Atos worldline CIS is managed and controlled by GWR. |
|
Stratford International | Atos | Anne | 2-3 | Two announcements per train.
P1/4 closed, was mainly used during the 2012 Olympics, were meant for full term use by Eurostar. This station is managed by Network Rail while the CIS is managed by Southeastern. Anne replaced Pauline Cavilla in 2012. |
c2c stations[]
Station | System | Voice | Platforms | Notes |
---|---|---|---|---|
Barking | Atos | Anne | Global | LU trains not announced. Platforms 2, 3 & 6 are served by District and Hammersmith & City lines. Platform 1 is only used when Barking Riverside is closed e.g. due to planned engineering work.
As of April 2023 speakers on Platforms 7 and 8 are now fixed and working. Announcements on Platforms 4 and 5 are still quiet. Platforms 4 and 5 are used for Fenchurch Street services via Upminster. Platforms 7 and 8 are used for services to Liverpool Street (on weekends or when Fenchurch Street is closed), London Overground and also C2C services via Purfleet. |
Basildon | Atos | Anne | Global | |
Benfleet | Atos | Anne | Global | |
Chafford Hundred | Atos | Anne | Global | |
Chalkwell | Atos | Anne | Global | |
Dagenham Dock | Atos | Anne | Global | |
East Tilbury | Atos | Anne | Global | |
Grays | Atos | Anne | Global | Announcements broke May 2021. |
Laindon | Atos | Anne | Global | |
Leigh-on-Sea | Atos | Anne | Global | |
London Fenchurch Street | None | Manual | Global | Only station on the C2C network that does not have Anne announcements. It is managed by c2c, previously managed by Network Rail until 2014. ASL 2-note chime used for all announcements. |
Limehouse | Atos | Anne | 1-2 | C2C platforms. |
iVENCS | DLR Female | 3-4 | DLR platforms. | |
Ockendon | Atos | Anne | Global | |
Pitsea | Atos | Anne | Global | |
Purfleet | Atos | Anne | Global | |
Rainham (Essex/London) | Atos | Anne | Global | |
Shoeburyness | Atos | Anne | Global | |
Southend Central | Atos | Anne | Global | |
Southend East | Atos | Anne | Global | |
Stanford-le-Hope | Atos | Anne | Global | |
Thorpe Bay | Atos | Anne | Global | |
Tilbury Town | Atos | Anne | Global | |
Upminster | Atos | Anne | (1a)+1-2+6 | Platform 1A used during Amended Timetable.
P1/2 are used by c2c. P3-5 - District Line. P6 - London Overground to Emerson Park and Romford. |
Westcliff | Atos | Anne | Global | |
West Ham | Atos | Anne | 7-8 | Platforms 1 - 6 are served by the DLR and London Underground. |
West Horndon | Atos | Anne | Global |
Chiltern Railways stations[]
At stations that are only served by Chiltern (e.g. High Wycombe), Phil/Celia do not announce the TOC name. (e.g. The next train at Platform 2 is the 13:59 service to Oxford). As of April 2021, Phil no longer does the announcements.
Station | System | Voice | Platforms | Notes |
---|---|---|---|---|
Aylesbury | KeTech | Celia | Global | Phil previously announced at this station until April 2021.
TOC name not announced. |
Aylesbury Vale Parkway | KeTech | Celia | Global | Phil previously announced at this station until April 2021.
TOC name not announced. |
Banbury | KeTech | Celia | Global | Phil previously announced at this station until April 2021. |
Beaconsfield | KeTech | Celia | Global | Phil previously announced at this station until April 2021.
TOC name not announced. |
Birmingham Moor Street | KeTech | Celia | Global | This station was the first to be upgraded to just Celia, including new phrases such as "this service is currently at/between:" when a train is delayed.
Phil previously announced at this station until April 2021. This station was previously manual announcements only but had a help point voiced by Ruth. |
Bicester North | KeTech | Celia | Global | Phil previously announced at this station until April 2021.
TOC name not announced. |
Bicester Village | KeTech | Celia | Global | Announcements on the London Marylebone bound platform are also said in Arabic and Mandarin.
TOC name not announced. Phil previously announced at this station until April 2021. |
Denham | KeTech | Celia | Global | Phil previously announced at this station until April 2021.
TOC name not announced. |
Denham Golf Club | KeTech | Celia | Global | Phil previously announced at this station until April 2021.
TOC name not announced. |
Dorridge | KeTech | Celia | Global | Station transferred from Atos (WMT) to KeTech in June 2021. |
Gerrards Cross | KeTech | Celia | Global | Phil previously announced at this station until April 2021.
TOC name not announced. |
Great Missenden | KeTech | Celia | Global | Phil previously announced at this station until April 2021.
TOC name not announced. |
Haddenham & Thame Parkway | KeTech | Celia | Global | A BR chime is played before each announcement. Phil previously announced at this station until April 2021.
TOC name not announced. |
Hatton | KeTech | Celia | Global | Announcements are quiet. Phil previously announced at this station until April 2021.
TOC name not announced. |
High Wycombe | KeTech | Celia | Global | Phil previously announced at this station until April 2021.
TOC name not announced. |
Islip | KeTech | Celia | Global | Previously managed by First Great Western. Phil previously announced at this station until April 2021.
TOC name not announced. |
Kings Sutton | KeTech | Celia | Global | Announcements are quiet. Phil previously announced at this station until April 2021. |
Lapworth | KeTech | Celia | Global | Phil previously announced at this station until April 2021. |
Leamington Spa | KeTech | Celia | Global | Old Davenport projector speakers are still in use. Phil previously announced at this station until April 2021. |
Little Kimble | KeTech | Celia | 1 | Phil previously announced at this station until April 2021.
TOC name not announced. |
London Marylebone | KeTech | Celia | Global | Local announcements announced on platforms only. "Boarding area" announcements in the concourse only.
TOC name not announced. |
Monks Risborugh | KeTech | Celia | 1 | Phil previously announced at this station until April 2021.
TOC name not announced. |
Northolt Park | KeTech | Celia | Global | Phil previously announced at this station until April 2021.
TOC name not announced. |
Oxford Parkway | KeTech | Celia | Global | Phil previously announced at this station until April 2021.
TOC name not announced. |
Princes Risborough | KeTech | Celia | Global | Phil previously announced at this station until April 2021.
TOC name not announced. Phil did not announce platform numbers for stand clear announcements. |
Seer Green & Jordans | KeTech | Celia | Global | Phil previously announced at this station until April 2021.
TOC name not announced. |
Solihull | KeTech | Celia | Global | Celia replaced Anne in spring 2021. The CIS was previously managed by WMT at this station. |
South Ruislip | KeTech | Celia | 3, 4 | Phil previously announced at this station until April 2021.
TOC name not announced. |
Telent | Elinor Hamilton | 1, 2 | Central line. | |
Sudbury & Harrow Road | KeTech | Celia | Global | Phil previously announced at this station until April 2021.
TOC name not announced. |
Sudbury Hill Harrow | KeTech | Celia | Global | Phil previously announced at this station until April 2021.
TOC name not announced. Only a couple of speakers work. Fast train announcements are repeated. |
Warwick | KeTech | Celia | Global | Phil previously announced at this station until April 2021. |
Warwick Parkway | KeTech | Celia | Global | Phil previously announced at this station until April 2021. |
Wembley Stadium | KeTech | Celia | Global | Phil previously announced at this station until April 2021.
TOC name not announced. |
West Ruislip | KeTech | Celia | 3, 4 | Phil previously announced at this station until April 2021.
TOC name not announced. New Infotec Board on Platform 3. Services starting at West Ruislip are not announced. No announcements on Central line Platforms 1 and 2. |
East Midlands Railway stations[]
All EMR mainline and larger stations are voiced by Atos Anne, with announcements set up as global. The smaller stations are voiced by TTS Acapela Rachel, with a mix of global and individually zoned set ups.
Generic and safety announcements have been refreshed, and are now voiced by Tom Cripps.
If a delay reason hasn't been inputted, Anne will announce "The reason for the delay is currently being investigated by our team"
As of Mid-2022 Anne is currently replacing Acapela Rachel at mainline and larger station's.
Station | System | Voice | Platforms | Notes |
---|---|---|---|---|
Aslockton | MicroPA | Acapela Rachel | Global | |
Alfreton | MicroPA | Acapela Rachel | Global | |
Alsager | Atos | Anne | Global | |
Barrow-upon-Soar | MicroPA | Acapela Rachel | Global | |
Belper | MicroPA | Acapela Rachel | Global | |
Beeston | Atos | Anne | Global | Beeston Station is situated next to the ATOS Worldline centre. |
Bingham | MicroPA | Acapela Rachel | Global | |
Blythe Bridge | MicroPA | Acapela Rachel | 1, 2 | |
Boston | MicroPA | Acapela Rachel | Global | |
Bulwell | MicroPA | Acapela Rachel | 1 | Nottingham Express Transit services not announced. |
Burton-on-Trent | Atos | Anne | Global | Served by CrossCountry services only. |
Carlton | MicroPA | Acapela Rachel | Global | TOC is not announced. |
Corby | Atos | Anne | Global | Only one Platform. |
Chesterfield | Atos | Anne | Global | |
Cromford | MicroPA | Acapela Rachel | Global | |
Derby | Atos | Anne | Global | Announcements tend to be quiet on the southern side of the station.
No Passenger services use Platform 7 the old bay platform known as Platform 5 closed/filled in during the Derby upgrade works in 2018. |
Duffield | MicroPA | Acapela Rachel | Global | |
East Midlands Parkway | Atos | Anne | Global | Fast trains are announced twice.
Station is situated next to the Radcliffe Power Station cooling towers. |
Gainsborough Lea Road | MicroPA | Acapela Rachel | Global | |
Habrough | MicroPA | Acapela Rachel | 1, 2 | Management of Habrough transferred from Northern to East Midlands Railway on 16th May 2021.
One announcement per train. |
Healing | MicroPA | Acapela Rachel | 1, 2 | Management of Healing transferred from Northern to East Midlands Railway on 16th May 2021.
One announcement per train. |
Hinckley | Atos | Anne | 1, 2 | Served by CrossCountry services only. |
Hucknall | MicroPA | Acapela Rachel | 1 | Only one platform. |
Ilkeston | MicroPA | Acapela Rachel | Global | Newest station on the EMR network, opened on 2nd April 2017 |
Kettering | Atos | Anne | Global | New White CIS screens installed on extended platforms. |
Kidsgrove | Atos | Anne | Global | Anne replaced Acapela Rachel in May 2022 (Acapela Rachel did not announce a platform number)
P1/2 for services to/from Stockport, P3/4 for services to/from Crewe |
Kirkby-in-Ashfield | MicroPA | Acapela Rachel | 1,2 | |
Langwith-Whaley Thorns | MicroPA | Acapela Rachel | 1,2 | |
Leicester | Atos | Anne | Global | Replacement buses not announced (May 2022) |
Lincoln Central | Atos | Anne | Global | Chimes used. Services are announced across all platforms, the booking hall, and the waiting room. |
Long Eaton | Atos | Anne | Global | |
Longport | Atos | Anne | Global | 2023 - Mainly served by LNWR services during the day |
Longton | Atos | Anne | 1, 2 | |
Loughborough | Atos | Anne | Global | Fast trains are announced twice.
P3 mainly used by stopping services from Lincoln to Leicester |
Mansfield Woodhouse | MicroPA | Acapela Rachel | 1, 2 | |
Market Harborough | Atos | Anne | Global | Station got fitted with new CIS when the station got refurbished in 2019 |
Market Rasen | MicroPA | Acapela Rachel | Global | October 2022 - Announcements non functional. |
Matlock | MicroPA | Acapela Rachel | 1 | Platform 2 is used by Peak Rail |
Matlock Bath | MicroPA | Acapela Rachel | Global | |
Melton Mowbray | MicroPA | Acapela Rachel | Global | |
Metheringham | MicroPA | Acapela Rachel | 1 | Currently announcing platform ONE via the CIS. |
Narborough | Atos | Anne | 1, 2 | Served by CrossCountry services only. |
Netherfield | MicroPA | Acapela Rachel | Global | |
Newark Castle | MicroPA | Acapela Rachel | Global | There are two announcements per train, at 5 and 2 minutes before departure. Arrival times are ignored.
Announcements confirmed as non functional by EMR 4th March 2024. |
Newstead | MicroPA | Acapela Rachel | 1 | Only one platform |
Nottingham | Atos | Anne | Global | A fire temporarily damaged the announcement equipment and part of the station building on 12th January 2018.
Platform changes can be repeated 3 times. Announcement volume fluctuates randomly. |
Oakham | MicroPA | Acapela Rachel | Global | A newer version of Rachel arrived in May 2021. |
Radcliffe | MicroPA | Acapela Rachel | Global | |
Ruskington | MicroPA | Acapela Rachel | 1 | Currently announcing platform ONE via the CIS. |
Saxilby | MicroPA | Acapela Rachel | 1 | Currently announcing platform ONE via the CIS.
TOC is not announced. |
Sheffield | Atos | Anne | Global | Platform changes at this station, are played up to six times. |
Stallingborough | MicroPA | Acapela Rachel | 1, 2 | Management of Stallingborough transferred from Northern to East Midlands Railway on 16th May 2021.
One announcement per train. |
Sileby | MicroPA | Acapela Rachel | Global | |
Skegness | Atos | Anne | Concourse | Anne replaced Acapela Rachel in May 2022. Chimes used. Trains announced 10 & 5 minutes before departure. |
Sleaford | MicroPA | Acapela Rachel | Global | Trains are announced at Sleaford 5 & 2 minutes before departure (Arrival times ignored) EMR has reverted back to a 5 & 2 minute count, apposed to the one minute announcement previously. |
South Wigston | Atos | Anne | Global | Served by CrossCountry services only. |
Spalding | MicroPA | Acapela Rachel | Global | |
Spondon | MicroPA | Acapela Rachel | Global | Trains announced 1 minute before departure (arrival times ignored) |
Stamford | MicroPA | Acapela Rachel | Global | |
Syston | MicroPA | Acapela Rachel | Global | |
Tutbury & Hatton | MicroPA | Acapela Rachel | 1, 2 | |
Uttoxeter | Atos | Anne | Global | |
Wainfleet | MicroPA | Acapela Rachel | Global | |
Wellingborough | Atos | Anne | Global | |
Willington | Atos | Anne | 1, 2 | Served by CrossCountry services only. |
Elizabeth Line stations[]
The Elizabeth line uses Platforms A and B at the core stations, except from Abbey Wood. All core stations use Emma Hignett.
Station | System | Voice | Platforms | Notes |
---|---|---|---|---|
Abbey Wood | Atos | Anne | 1+2 | Owned by Southeastern before the 2017 renovation. Announcements still in Southeastern settings.
Southeastern Platforms. |
Siemens | Emma | 3+4 | Elizabeth Line Platforms which opened on 24th May 2022. Announcements currently broken/disabled. | |
Acton Main Line | Atos | Anne | 2-3, 4 | Platform 1 does not exist. Anne took over Rodger on Platform 4 upon transfer from GWR to TfL Rail / Elizabeth line in 2018. Platform 2 is used by fast trains. |
Bond Street | Telent | Elinor Hamilton | 1, 2, 3, 4 | Central and Jubilee lines. |
Siemens | Emma | A+B | Elizabeth line platforms which opened on 24th October 2022. | |
Brentwood | Atos | Anne | 1, 2-3, 4 | Platforms 1 and 2 are fast lines only fast train announcements play on those platforms. |
Burnham | Atos | Anne | Global | Owned by GWR before 2018. |
Canary Wharf | Siemens | Emma | A+B | New station/platforms for Elizabeth Line which opened on 24th May 2022 new Infotec LED CIS screens installed.
Station also served by London Underground Jubilee line and DLR. |
Telent | Elinor | Global | Jubilee line station/platforms. | |
iVENCS | DLR Female | Global | DLR station/platforms. | |
Chadwell Heath | Atos | Anne | Global | Platforms 1 and 2 are fast lines only fast train announcements play on those platforms. |
Custom House | Siemens | Emma | A+B | New platforms added for Elizabeth Line which opened on 24th May 2022, previously Anne in Silverlink days. |
iVENCS | DLR Female | 3-4 | DLR Platforms. | |
Ealing Broadway | Atos | Anne | 1, 2-3, 4 | Platforms 1 & 2 are fast lines only fast train announcements only play on those platforms. TfL took over from GWR in 2018 and Rodger removed. |
Telent | Elinor Hamilton | 5, 6-7, 8, 9 | 5+6 Central line.
7+8+9 District line. | |
Farringdon | Siemens | Emma | A+B | Platforms opened on 24th May 2022. |
Atos | Anne | 3 | Thameslink platforms. | |
Matt | 4 | |||
Telent | Elinor Hamilton | 1, 2 | Circle, Hammersmith & City and Metropolitan lines. | |
Forest Gate | Atos | Anne | Global | Platform length 7 coaches long. Platforms 3 and 4 are fast lines only fast train announcements play on those platforms. |
Gidea Park | Atos | Anne | 1-2, 3-4 | New Infotec CIS screens have been installed since late 2020 on all platforms at Gidea Park they weren't activated until 2022. Platforms 1 and 2 are fast lines only fast train announcements play on those platforms. |
Goodmayes | Atos | Anne | Global | Platforms 1 and 2 are fast lines only fast train announcements play on those platforms. |
Hanwell | Atos | Anne | 2, 3 | Platform length 6 coaches long. Platform 1 partially doesn't exist. |
Harold Wood | Atos | Anne | Global | Platforms 1 and 2 are fast lines only fast train announcements play on those platforms. |
Hayes & Harlington | Atos | Anne | 1, 2-3, 4-(5) | Rodger removed upon the station's transfer from GWR to TfL Rail / Elizabeth line management. Platforms 1 and 2 are fast lines only fast train announcements play on those platforms. Platform 5 is rarely used. |
Ilford | Atos | Anne | 1, 2-3, 4-(5) | Announcements on the platforms are of very poor quality (Similar to the speaker quality at York station). Platforms 1 and 2 are fast lines only fast train announcements play on those platforms. Platform 5 is disused. |
Iver | Atos | Anne | Global | Rodger removed upon transfer from GWR to TfL Rail / Elizabeth line.
Platform length 8 coaches long. Platforms 1 and 2 are fast lines only fast train announcements play on those platforms. |
Langley | Atos | Anne | Global | Platform length 7 coaches long. Previously Boofay until 2011. TfL took over in 2019. Platforms 1 and 2 are fast lines only fast train announcements play on those platforms. |
Liverpool Street (Low Level) | Siemens | Emma | A+B | Platforms opened 24th May 2022. |
Manor Park | Atos | Anne | Global | Platform length 7 coaches long. Platforms 3 and 4 are fast lines only fast train announcements play on those platforms. |
Maryland | Atos | Anne | Global | Platform length 7 coaches long. Platforms 3 and 4 are fast lines only fast train announcements play on those platforms. |
Paddington (Low Level) | Siemens | Emma | A+B | Platforms opened 24th May 2022. |
Romford | Atos | Anne | 1-2, 3-4, 5 | Previously Boofay until 2009. TfL took over in 2015.
Platform 1 is served only by Overground shuttle to Upminster via Emerson Park. Platforms 2 and 3 are served by occasional Greater Anglia services and mostly play fast train announcements. |
Seven Kings | Atos | Anne | Global | Platform length 7 coaches long. Platforms 1 and 2 are fast lines only fast train announcements play on those platforms. |
Southall | Atos | Anne | 1, 2-3, 4 | Previously Boofay until 2011. Rodger announced on Platforms 2 & 3 until 2018 when station was transferred from GWR to TfL Rail / Elizabeth line. Platforms 1 and 2 are fast lines only fast train announcements play on those platforms. |
Stratford | Atos | Anne | 1, 2 | London Overground platforms. Emma replaced Anne in early 2010s. MTR Corportation took over the CIS from ARL in September 2022 and Anne replaced Emma. |
Atos | Anne | 5, 8, 9-10, 10a, 11, 12 | Anne was installed in 2009, TfL took over from Greater Anglia in 2015. Phil Sayer announces Inspector Sands which can be heard here.
P3+3A+6 are LU Central line (There are no announcements on those platforms). Original bay P4 (Behind P5) was used by DLR and previously announced by Celia. This has now been disused since they relocated to High Level. P4A+4B. P5+8 are served by Elizabeth line and c2c with occasional Greater Anglia services. P9-12 are served by Greater Anglia / P9/10/10A are sometimes used by Elizabeth Line during disruption or engineering works. P10A/11 are occasionally used by London Overground. Platform 12A was behind Platform 12 but disused when the new LO platforms were built. | |
iVENCS | None | 4A, 4B
16, 17 |
4A + 4B - DLR Platforms on the High Level.
16 + 17 - DLR Platforms on the former Overground platforms. No announcements currently play on the DLR platforms. | |
Telent | Ellinor Hamilton | 13, 14, 15 | Jubilee line platforms. | |
Taplow | Atos | Anne | Global | Rodger removed upon transfer from GWR to TfL Rail / Elizabeth line. Platforms 1 and 2 are fast lines only fast train announcements play on those platforms. |
Tottenham Court Road | Siemens | Emma | A+B | Elizabeth line platforms which opened on 24th May 2022. |
Telent | Elinor Hamilton | 1, 2, 3, 4 | Central and Northern lines. | |
West Drayton | Atos | Anne | 1, 2-3, 4-5 | Rodger removed upon transfer from GWR to TfL Rail / Elizabeth line. Platform 5 which was added in 2022 is mostly used for through freight services if a train is on or arriving at P4. Platforms 1 and 2 are fast lines only fast train announcements play on those platforms. |
West Ealing | Atos | Anne | 3, 4-5 | Platform 1 does not exist. Platform 2 has been partially demolished in 1991.
Rodger removed on P4-5 upon transfer from GWR to TfL Rail / Elizabeth line. P5 for Greenford services. |
Whitechapel | Siemens | Emma | A+B | Platforms opened 24th May 2022. |
Atos | Anne | 5, 6 | London Overground. Anne replaced Emma in May 2020. | |
Telent | Elinor Hamilton | 1, 2 | District and Hammersmith & City lines. Platforms 3 and 4 were removed in 2010. | |
Woolwich | Siemens | Emma | A+B | Opened 24th May 2022. |
DLR stations[]
Sttaions | System | Voice | Platforms | Notes |
---|---|---|---|---|
Abbey Road | iVENCS | DLR Female | 1, 2 | |
All Saints | iVENCS | DLR Female | 1, 2 | |
Bank | iVENCS | Manual | 9 | DLR departures. No announcements on Platform 10 which is for DLR arrivals |
Telent | Elinor Hamilton | Global | Central, Circle, District, Northern and Waterloo & City lines.
Elinor does not announce departures from Platforms 7 or 8 (Waterloo & City line platforms). Phil does left luggage. | |
Beckton | iVENCS | DLR Female | 1, 2 | |
Beckton Park | iVENCS | DLR Female | 1, 2 | |
Blackwall | iVENCS | DLR Female | 1, 2 | |
Bow Church | iVENCS | DLR Female | 1, 2 | |
Canary Wharf | iVENCS | DLR Female | Global | DLR station/platforms. |
Telent | Elinor Hamilton | Global | Jubilee line station/platforms. | |
Siemens | Emma | A+B | New station/platforms for Elizabeth Line which opened on 24th May 2022 new Infotec LED CIS screens installed. | |
Crossharbour | iVENCS | DLR Female | 1, 2 | |
Custom House | iVENCS | DLR Female | 3-4 | DLR platforms. |
Siemens | Emma | A+B | New platforms added for Elizabeth Line which opened on 24th May 2022, previously Anne in Silverlink days. | |
Cutty Sark for Maritime Greenwich | iVENCS | DLR Female | 1, 2 | |
Cyprus | iVENCS | DLR Female | 1, 2 | |
Deptford Bridge | iVENCS | DLR Female | 1, 2 | |
Devons Road | iVENCS | DLR Female | 1, 2 | |
East India | iVENCS | DLR Female | 1, 2 | |
Gallions Reach | iVENCS | DLR Female | 1, 2 | |
Greenwich | iVENCS | DLR Female | 3, 4 | DLR platforms. |
Atos | Anne | 2 | Southeastern platforms. | |
Mike | 1 | |||
Heron Quays | iVENCS | DLR Female | 1, 2 | |
Island Gardens | iVENCS | DLR Female | 1-2 | Island platform. |
King George V | iVENCS | DLR Female | 1-2 | Island platform. |
Langdon Park | iVENCS | DLR Female | 1, 2 | |
Lewisham | iVENCS | DLR Female | 5-6 | DLR platforms. |
Atos | Anne | 1, 3 | Southeastern platforms. Mark Stutter replaced Anne in 2004. Anne & Mike replaced Mark Stutter in 2012. Both Anne & Mike announce bus replacements. | |
Mike | 2, 4 | |||
Limehouse | iVENCS | DLR Female | 3-4 | DLR platforms. |
Atos | Anne | 1-2 | C2C platforms. | |
London City Airport | iVENCS | DLR Female | 1-2 | Island platform. |
Mudchute | iVENCS | DLR Female | 1, 2, (3) | Platform 3 is rarely used. |
Pontoon Dock | iVENCS | DLR Female | 1, 2 | |
Poplar | iVENCS | DLR Female | 1, 2, 3, 4 | |
Prince Regent | iVENCS | DLR Female | 1, 2 | |
Pudding Mill Lane | iVENCS | DLR Female | 1, 2 | |
Royal Albert | iVENCS | DLR Female | 1, 2 | |
Royal Victoria | iVENCS | DLR Female | 1, 2 | |
Shadwell | iVENCS | DLR Female | 1-2 | Island platform. |
South Quay | iVENCS | DLR Female | 1, 2 | |
Star Lane | iVENCS | DLR Female | 1, 2 | |
Stratford | iVENCS | None | 4A, 4B, 16, 17 | 4A + 4B - DLR Platforms on the High Level.
16 + 17 - DLR Platforms on the former Overground platforms. No announcements currently play on the DLR platforms. |
Atos | Anne | 1+2, 5, 8, 9+10, 10A+11, 12 | P1+2 - Overground (Anne replaced Emma in September 2022).
P5/8 - Elizabeth Line. P9+10, 10A+11, 12 - Greater Anglia. | |
Telent | Elinor Hamilton | 13, 14, 15 | Jubilee line. | |
Stratford High Street | iVENCS | DLR Female | 1, 2 | |
Stratford International | iVENCS | DLR Female | 1-2 | |
Tower Gateway | iVENCS | DLR Female | 1, 2 | Both platforms share the same track with the doors opening on both platforms. |
West Ham | iVENCS | DLR Female | 3-4 | DLR platforms |
Telent | Elinor Hamilton | 1-2, 5-6 | District, Hammersmith & City and Jubilee lines. | |
Atos | Anne | 7-8 | C2C platforms. | |
West India Quay | iVENCS | DLR Female | 2, 3, 4 | No Platform 1. |
West Silvertown | iVENCS | DLR Female | 1, 2 | |
Westferry | iVENCS | DLR Female | 1, 2 | |
Woolwich Arsenal | iVENCS | DLR Female | 3-4 | DLR platforms. |
Great Northern (GTR) stations[]
Hull Trains Paragon and LNER Azuma are not announced at any station on the GTR network.[2]
Station | System | Voice | Platforms | Notes |
---|---|---|---|---|
Alexandra Palace | Atos | Anne | 1-2, 3-4 | P1/2 for services to London Kings Cross and Moorgate.
P3 for services via Welwyn Garden City. P4 for services via Hertford North. |
Arlesey | Atos | Anne | 1, 2 | |
Ashwell & Morden | Atos | Anne | Global | |
Baldock | Atos | Anne | Global | |
Bayford | Atos | Anne | 1, 2 | |
Biggleswade | Atos | Anne | Global | Platforms 2 & 3 are fast line platforms Anne only announces fast train on those platforms. |
Bowes Park | Atos | Anne | Global | |
Brookmans Park | Atos | Anne | 1-2, 3-4 | Platforms 2 & 3 are fast line platforms Anne only announces fast train on those platforms. |
Crews Hill | Atos | Anne | Global | |
Cuffley | Atos | Anne | Global | |
Downham Market | Atos | Anne | 1, 2 | |
Drayton Park | Atos | Anne | Global | Speakers muffled and make a loud noise whenever announcements are played. |
Enfield Chase | Atos | Anne | Global | |
Essex Road | Atos | Anne | Global | |
Finsbury Park | Atos | Anne | 1-2, 5-(6) | P1/2 for services to Moorgate, London Kings Cross & St Pancras.
P3/6 are not used despite sharing the same tracks at P2/7. P4/5 are Fast Line Platforms and only used when 1/2/7/8 aren't available. P7/8 for GN services to Stevenage and Welwyn and also Thameslink services to Peterborough and Cambridge. Matt does TfL status. |
Matt | (3)-4, 7-8 | |||
Foxton | Atos | Anne | Global | |
Gordon Hill | Atos | Anne | 1 | |
Matt | 2-3 | |||
Grange Park | Atos | Anne | 2 | Announcements for Platform 1 (Moorgate Platform) are announced on Platform 2 (Hertford Platform). The speakers on P1 don't work. |
Hadley Wood | Atos | Anne | Global | Platforms 2 & 3 are fast line platforms Anne only announces fast train on those platforms. |
Harringay | Atos | Anne | Global | |
Hatfield | Atos | Anne | Global | Platform 2 is used by fast trains. |
Hertford North | Atos | Anne | 1 | |
Matt | 2, 3 | |||
Highbury & Islington | Atos | Anne | 1, 2, 7, (8) | London Overground platforms. Anne replaced Emma in March 2024.
No announcements on Platform 8. |
4, 6 | Great Northern platforms. | |||
Telent | Elinor Hamilton | 3, 5 | Victoria line platforms. | |
Hitchin | Atos | Anne | Global | |
Hornsey | Atos | Anne | Global | |
Huntingdon | Atos | Anne | Global | Platform 1 is rarely used. |
Kings Lynn | Atos | Anne | Global | |
Knebworth | Atos | Anne | Global | Platforms 2 & 3 are fast line platforms Anne only announces fast train on those platforms. |
Letchworth Garden City | Atos | Anne | Global | |
Littleport | Atos | Anne | 1, 2 | |
Meldreth | Atos | Anne | 1-2 | Platform length 4 coaches long. |
Moorgate | Atos | Anne | 9-10 | Great Northern platforms. Anne replaced Phil (Funkwerk) in 2010. |
New Barnet | Atos | Anne | 1-2, 3-4 | Platforms 2 & 3 are fast line platforms Anne only announces fast train on those platforms. |
New Southgate | Atos | Anne | 1-2, 3-4 | Platforms 2 & 3 are fast line platforms Anne only announces fast train on those platforms. |
Oakleigh Park | Atod | Anne | 1-2, 3-4 | Platforms 2 & 3 are fast line platforms Anne only announces fast train on those platforms. |
Old Street | Atos | Anne | 3, 4 | Great Northern platforms. |
Telent | Elinor Hamilton | 1, 2 | Northern line platforms. | |
Palmers Green | Atos | Anne | Global | |
Potters Bar | Atos | Anne | Global | Platforms 2 & 3 are fast line platforms Anne only announces fast train on those platforms. |
Royston | Atos | Anne | Global | |
Sandy | Atos | Anne | Global | |
Shepreth | Atos | Anne | Global | |
St Neots | Atos | Anne | Global | Services that are terminating will be announced with the time the service left its origin e.g. Platform 4 for the 08:35 LNER service from Newcastle.
LNER only terminate at St Neots when there is engineering works between St Neots and London Kings Cross. Platforms 2 and 3 are mainly used when there's engineering works. |
Stevenage | Atos | Anne | 1-2, 5 | Platform 5 opened on 3rd August 2020. Announcements are faulty and will not announce a stopping train if there is another train on another platform, excluding Platform 5.
Anne replaced Phil (Amey) in late 2010. Did not announce the operator East Coast. |
Matt | 3-4 | |||
Waterbeach | Atos | Anne | 1, 2 | Staggered Platforms. |
Watlington | Atos | Anne | 1, 2 | Platform length 4 coaches long. |
Watton-at-Stone | Atos | Anne | Global | |
Welham Green | Atos | Anne | Global | |
Welwyn Garden City | Atos | Anne | 1-2 | |
Matt | 3-4 | |||
Welwyn North | Atos | Anne | 1, 2 | |
Winchmore Hill | Atos | Anne | Global |
Great Western Railway stations[]
Station | System | Voice | Platforms | Notes |
---|---|---|---|---|
Aldermaston | MicroPA | Acapela Rachel | 1, 2 | |
Appleford | MicroPA | Acapela Rachel | 1, 2 | |
Ascott-under-Wychwood | Atos | Anne | Global | |
Ashley Down | Atos | TBC | TBC | New station between Stapleton Road and Filton Abbey Wood that is expected to open in 2024. |
Barnstaple | Atos | Anne | 1 | |
Bath Spa | Atos | Rodger | 1, 2 | Rodger replaced Anne on platform 1 in late 2018.
No chimes before announcements. New CIS screens with white LEDs installed in October/November 2019. |
Bedminster | Atos | Anne | 1, 2 | Platform 3 is rarely used. |
Bedwyn | Atos | Anne | Global | |
Bere Alston | Atos | Anne | Help Point | When visited in October 2023 the help point was not connecting. |
Bere Ferrers | Atos | Anne | Help Point | There are no announcements available at this station. Anne voices the "Next train" button. |
Betchworth | Atos | Anne | Global | |
Blackwater | Atos | Anne | Global | Chimes used. |
Bodmin Parkway | Atos | Anne | 1, 2 | Origin and via points not announced. Platform 3 is used by heritage railway services to Padstow in summer. |
Bourne End | Atos | Anne | Help Point | |
MicroPA | Acapela Rachel | 1, 2 | ||
Bradford-on-Avon | Atos | Anne | Global | |
Bramley (Hampshire) | Atos | Anne | Global | |
Bridgwater | Atos | Anne | 1 | |
Rodger | 2 | |||
Bristol Parkway | Atos | Anne | 1-2 | |
Rodger | 3-4 | |||
Bruton | Atos | Anne | 1, 2 | |
Cam & Dursley | Atos | Anne | 1, 2 | |
Carbis Bay | Atos | Anne | Help Point | |
Castle Bar Park | Atos | Anne | Global | Served by Greenford trains only. |
Castle Cary | Atos | Anne | Global | |
Camborne | MircoPA | Acapela Rachel | 1, 2 | Announces through the CIS screen. |
Atos | Anne | Help Points | Anne announces on Help points, 30/05/2023 Help Point not working. | |
Cheltenham Spa |
Atos | Rodger | Global | Anne & Rodger replaced Ruth in 2011/2012. Rodger took over Anne in 2015, although Anne still does BTP 61016 message.
Announcements on the Concourse and on footbridges. Announcements on platforms are quiet. This station has new White text Infotec LED Screens. |
Charlbury | Atos | Anne | Global | |
Chetnole | Atos | Anne | Help Point | |
Chilworth | Atos | Anne | Global | |
Chippenham | Atos | Anne | Global | |
Cholsey | Atos | Anne | 1, 4 | Platforms 1 and 2 are inaccessible and only fast train announcements play on them. |
Rodger | 2-3 | |||
Clifton Down | MicroPA | Acapela Rachel | 1, 2 | Two announcements per train. |
Cookham | MicroPA | Acapela Rachel | 1 | |
Atos | Anne | Help Point | ||
Combe | MicroPA | Acapela Rachel | 1 | |
Coombe Junction Halt | Atos | Anne | Help Point | June 2023 the help point was out of use with a bag over it. |
Crowthorne | Atos | Anne | Global | |
Culham | MicroPA | Acapela Rachel | 1, 2 | |
Dawlish | Atos | Anne | Global | New Infotec and Horn Speakers have been installed since August 2022 when refurbishments were completed. Horn speakers are now in use. As of August 2023 chimes have been removed and announcements have been reduced to 1 announcement per train. |
Dawlish Warren | MicroPA | Acapela Rachel | 1, 2 | |
Atos | Anne | Help Point | ||
Didcot Parkway | Atos | Anne | 1, 4-5 | New CIS screens with white LEDs installed in 2019. |
Rodger | 2-3 | |||
Digby & Sowton | Atos | Anne | Global | |
Dorking Deepdene | Atos | Anne | Global | |
Dorking West | Atos | Anne | Global | |
Drayton Green | Atos | Anne | Global | |
Evesham | Atos | Rodger | 1, 2 | Rodger replaced Anne between 2022-23. New pentagon speakers installed replacing the old horn speakers. Announcements was previously quiet when Anne was here. |
Exeter Central | Atos | Anne | Global | Platform 1 is rarely used and is usually used by terminating SWR services from London Waterloo if there are strikes or engineering works or doesn't call at EXD. |
Exeter St. Davids | Atos | Anne | 1-2, 5-6 | Announcements in the concourse and on the footbridge are by both voices, appropriate to the train being announced. Both voices also announce buses globally.
New CIS screens with white LEDs installed in October/November 2019. Platforms separated into A and B in October 2020. |
Rodger | 3-4 | |||
Exeter St. Thomas | MicroPA | Acapela Rachel | 1, 2 | Announcements are very quiet made through CIS screens. |
Exmouth | Atos | Anne | Global | Only one platform. |
Falmouth Town | Atos | Rodger | Global | Only one platform. |
Farnborough North | Atos | Anne | Global | |
Filton Abbey Wood | Atos | Anne | 1-4 | |
Rodger | 2-3 | |||
Finstock | MicroPA | Acapela Rachel | 1 | |
Freshford | MicroPA | Acapela Rachel | 1, 2 | New CIS screens installed in 2021. |
Frome | Atos | Anne | Global | |
Furze Platt | MicroPA | Acapela Rachel | 1 | |
Atos | Anne | Help Point | ||
Gloucester | Atos | Anne | 1-3 | Announcements was broken in 2020. As of late 2021 announcements have been fixed, new Penton speakers installed replacing old horn speakers, with Rodger announcing on Platform 4. Announcements zoned. |
Rodger | 4 | |||
Gomshall | Atos | Anne | 1, 2 | |
Goring & Streatley | Atos | Anne | 1, 4 | Platforms 1 and 2 and are inaccessible and only play fast train announcements. |
Rodger | 2-3 | |||
Gunnislake | Atos | Anne | Help Point | When visited in October 2023 the help point was not connecting. |
Hanborough | MicroPA | Acapela Rachel | 1 | |
Hayle | Atos | Anne | 1 | Announcements installed in late 2023. |
Rodger | 2 | |||
Heathrow Central for Terminals 2 & 3 | Atos | Anne | 1, 2 | Security and safety announcements are made by the airport's Aviavox announcement system rather than Atos.
T4 only served by the Elizabeth Line and Piccadilly Line.
Heathrow stations are also managed by Heathrow Express but use GWR Anne announcements. Platforms 5 and 6 at T5 are Piccadilly line while Platforms 1 and 2 are the T5 Transit to Terminals 5B and 5C. Anne's BTP 61016 message somehow plays at Terminals 2 & 3. |
Heathrow Airport Terminal 4 | Atos | Anne | Global | |
Heathrow Airport Terminal 5 | Atos | Anne | 3, 4 | |
Henley-on-Thames | Atos | Anne | Global | Only one platform. |
Heyford | MicroPA | Acapela Rachel | 1, 2 | |
Highbridge & Burnham | MicroPA | Acapela Rachel | 1, 2 | |
Honeybourne | Atos | Anne | Global | This station has CIS Screens installed since early September 2020.
Help Point is available with a 'Next Train' yellow button but like other stations recently they dont work. |
Hungerford | MicroPA | Acapela Rachel | 1, 2 | |
Ivybridge | Atos | Anne | 1 | |
Rodger | 2 | |||
Kemble | Atos | Anne | Global | |
Kingham | Atos | Anne | Global | |
Kintbury | MicroPA | Acapela Rachel | 1, 2 | Announcements are very quiet on Platform 1 due to houses nearby. |
Keynsham | MicroPA | Acapela Rachel | 1, 2 | |
Lawrence Hill | Atos | Anne | 1 | Announcement have been installed in 2020, Chimes are used, announcements are fuzzy.
New white writing LED screen are installed. |
Rodger | 2 | |||
Liskeard | Atos | Anne | 1-2 | Anne does not announce the Looe trains on platform 3. Chimes are used but only for Anne and not pre-recorded GWR staff announcements. |
Looe | Atos | Anne | Help Point | When visited in October 2023 the help point was not connecting. |
Lostwithiel | Atos | Anne | Help Point | No announcements at this station, only Help Point which Anne voices "Next train" button. |
Luxulyan | Atos | Anne | Help Pont | |
Lympstone Village | Atos | Anne | 1 | |
Maiden Newton | Atos | Anne | 1 | |
Marlow | Atos | Anne | Help Point | Anne voices the help point, and Rachel announces trains on the platform 5 and 2 minutes before departure. |
MicroPA | Acapela Rachel | 1 | ||
Marsh Barton | Atos | Anne | 1, 2 | Opened on 4th July 2023.
Chimes were used and are now removed, announcements are zoned. When calling points are made for this station, Anne recording was recently done. Rodger was edited using "Marsh" from Dilton Marsh, "Bar" from Barnstaple and "ton" from Taunton. |
Melksham | MicroPA | Acapela Rachel | 1 | |
Menheniot | MicroPA | Acapela Rachel | 1, 2 | |
Midgham | MicroPA | Acapela Rachel | 1, 2 | |
Moreton-in-Marsh | Atos | Anne | Global | |
Mortimer | Atos | Anne | 1 | |
Rodger | 2 | |||
Maidenhead | Atos | Anne | 1, 4-5 | Platforms 1 and 2 are fast lines which only have fast train announcements. Platform 5 for trains to Marlow. |
Rodger | 2-3 | |||
Nailsea & Backwell | Atos | Anne | 1 | New CIS screens with white LEDs have been installed. |
Rodger | 2 | |||
Newbury | Atos |
1 |
Chimes used. | |
Rodger | 2, 3 | |||
Newbury Racecourse | Atos |
Anne |
1, 3 | Announcements for trains on platform 3 are strangely announced as being on platform 1, including the stand clear announcements. |
Rodger | 2 | |||
Newcourt | Atos | Anne | Global | |
Newton Abbot | Atos | Anne | 1-2 | Announcements are faulty, chimes half played and some announcements cut off. |
Rodger | 3 | |||
Newquay | Atos | Anne | Global | |
North Camp | Atos | Anne | Global | Chimes used. |
Okehampton | Atos | Anne | 3 | Station reopened on 20th November 2021.
Platform 3 is used by GWR. Platforms 1 & 2 are managed by Devon County Council for Dartmoor Steam Railway. |
Oldfield Park | Atos | Rodger | 1, 2 | Train origins not announced.
No chimes before announcements. Anne voices the 'Next Train' button on the help points. |
Anne | Help Points | |||
Oxford | Atos | Anne | 1-3 | Phil & Celia replaced Boofay in early 2009 and new Infotec screens installed. Anne & Rodger replaced Phil & Celia in 2012.
New white writing CIS screens installed on Platforms 3 & 4. New orange screens installed on Platforms 1 & 2 in late 2019. Some speakers on Platform 4 are broken. Chimes used. Announcements for Platform 1 now announced on Platforms 2 and 3 too. |
Rodger | 4 | |||
Paignton | Atos | Anne | Global | |
Pangbourne | Atos | Anne | Global | |
Par | Atos | Anne | Global | Anne does not announce Newquay trains that are not through trains |
Parson Street | Atos | Anne | 1 | Announcement system and New white LED CIS screens installed in spring 2021. Anne also announces on the Help Points. Announcements are quiet due to houses nearby. |
Rodger | 2 | |||
Patchway | Atos | Anne | 1, 2 | |
Penmere | Atos | Anne | Help Point | New Help point was installed in Spring 2019. |
Penryn | Atos | Rodger | Global | Announcements quiet. |
Anne | Help Point | Anne announces 'Next Train' on the Help Point. | ||
Penzance | Atos | Anne | Global | |
Perranwell | Atos | Anne | Help Point | Anne Announces 'The Next Train' button on the Help Point. |
Pershore | MicroPA | Acapela Rachel | 1 | |
Pewsey | Atos | Anne | 1 | |
Rodger | 2 | |||
Pilning | Atos | Anne | Help point | Platform 2 (Westbound) has been disused/closed since 2016. |
Plymouth | Atos | Anne | 3-4 | Rodger took over Anne in 2015/16, Rodger announces in the concourse. No chimes used.
New CIS screens with white LEDs installed in September/October 2019. Platforms 1 and 2 are not used by passenger services. In February 2024, Anne returned on Platforms 3 and 4. Anne also announces security/safety and other generic announcements. |
Rodger | 5-6, 7-8 | |||
Polsloe Bridge | Atos | Rodger | Global | Anne does BTP 61016 message. |
Portway Park & Ride | Atos | Anne | 1 | New station that opened on 1st August 2023. |
Quintrell Downs | Atos | Anne | Help Point | Anne Announces 'The Next Train' button on the Help Point. |
Radley | MicroPA | Acapela Rachel | 1, 2 | |
Reading Green Park | Atos | Anne | 1 | New station that opened on 28th May 2023. Chimes used. Origin points not announced, |
Rodger | 2 | |||
Reading West | Atos | Anne | 1 | |
Rodger | 2 | |||
Redland | Atos | Anne | 1 | |
Redruth | Atos | Anne | Global | Platform length 6 coaches long. |
Roche | Atos | Anne | Help Point | Anne Announces 'The Next Train' button on the Help Point. |
Sandhurst | Atos | Anne | Global | |
Sandplace | Atos | Anne | Help Point | May 2023 Help Point not connecting. |
Shalford | Atos | Anne | Global | |
Shiplake | MicroPA | Acapela Rachel | 1 | |
Shipton | MicroPA | Acapela Rachel | 1, 2 | |
Shirehampton | Atos | Anne | Help point | Anne voices 'Next Train' button. |
South Greenford | Atos | Anne | Global | |
Slough | Atos | Anne | 1-2, 5 | Phil & Celia replaced Boofay in early 2009 and new Infotec screens installed.
Anne & Rodger replaced Phil & Celia in late 2011/early 2012. Announcements on Platform 4 are louder than platform 5 as speakers are faced towards the tracks when both announcements play makes it hard to hear what is announced on Platform 5. Platform 6 has been disused since platform extension in preparation for Elizabeth line. Platform 1 towards Windsor & Eton Central. Platforms 2 and 3 are fast lines which mainly have fast train announcements and are only used when needed. |
Rodger | 3-4 | |||
St Austell | Atos | Anne | Global | |
St Columb Road | Atos | Anne | Help Point | Anne Announces 'The Next Train' button on the Help Point. |
St Erth | Atos | Anne | Global | Platform 2 has the only working speaker, however announcements for all trains play out of it. "The next train to arrive at" announcement does not include the origin station. From Summer 2023 all speakers are fixed including the speaker behind P3 leading to the ticket office. Platform length 6 coaches long. |
St Ives | Atos | Anne | Help Point | |
Stapleton Road | Atos | Rodger | 1, 2 | Rodger is on both platforms, but zoned. No chime and the first part of the announcement is cut off. 2 announcements per train. Origins not announced. |
Starcross | MicroPA | Acapela Rachel | 1, 2 | Announcements are quiet. |
Atos | Anne | Help Point | ||
Stonehouse | Atos | Rodger | Global | |
Stroud | Atos | Anne | Global | |
Swindon | Atos | Anne | 4 | Announcements in subway and on concourse are by both voices, appropriate to the train being announced.
New CIS screens with white LEDs installed in October 2019. Anne also announces bus replacements. There are no speakers on platform 2 except in the waiting room. |
Rodger | 1-3 | |||
Tackley | MicroPA | Acapela Rachel | 1, 2 | |
Taunton | Atos | Anne | 2, 5-6 | Platform 1 is not used. |
Rodger | 3-4 | |||
Teignmouth | Atos | Anne | 1 | |
Rodger | 2 | |||
Thatcham | Atos | Anne | 1 | |
Rodger | 2 | |||
Theale | Atos | Anne | 2,3 | |
Rodger | 1,4 | |||
Tilehurst | Atos | Anne | 1, 4 | Anne & Rodger announce fast trains only on Platforms 1 & 2. |
Rodger | 2-3 | |||
Tiverton Parkway | Atos | Anne | 1 | Announcements in the station building and toilets are by both voices, appropriate to the train being announced.
New CIS screens with white LEDs installed in 2019. |
Rodger | 2 | |||
Topsham | Atos | Anne | 1, 2 | |
Torquay | Atos | Rodger | Global | Rodger took over Anne on both platforms in December 2020, although Anne only does BTP 61016 message. Chimes removed.
Old Davenport projector speakers are still in use. |
Torre | Atos | Rodger | Global | Announcements installed in 2018. |
Totnes | Atos | Anne | 1 | Announcements on the footbridge are by both voices, appropriate to the train being announced. |
Rodger | 2 | |||
Trowbridge | Atos | Anne | Global | The speaker on platform 2 is fuzzy. |
Truro | Atos | Anne | Global | The very first station to have had Worldline Atos (Sema at the time) installed at this station in ealry 1996 voiced by Ruth before Wales & West began, was trialled for a few months before rolled out to other stations.
Better quality speakers were installed in July 2019. New CIS screens with white LEDs installed in October 2019. Platform 1 for services to Falmouth Docks. |
Twyford | Atos | Anne | 1, 4-5 | No chimes before announcements. Platforms 1 and 2 are fast lines which only have fast train announcements. Platform 5 for trains to Henley-on-Thames. |
Rodger | 2-3 | |||
Wargrave | MicroPA | Acapela Rachel | 1 | |
Warminster | Atos | Anne | 1 | |
Rodger | 2 | |||
Wargrave | Atos | Anne | 1 | |
Westbury | Atos | Anne | Global | |
Weston Milton | Atos | Anne | Global | Only one platform. |
Weston-super-Mare | Atos | Anne | Global | One next train with calling pattern and approaching announcement only. |
Windsor & Eton Central | Atos | Anne | Global | Only one platform, the rest has become a shopping complex. However, announcements are also heard through the complex. |
Worcestershire Parkway | Atos | Anne | 1, 2, 3 | Station opened Sunday 23rd February 2020. |
Worle | Atos | Rodger | Global | |
Anne | Help Point | |||
Yate | Atos | Rodger | 1, 2 | |
Anne | Help Point | |||
Yatton | Atos | Anne | 1 | |
Rodger | 2 | |||
Yeoford | Atos | Anne | Help point | Anne announces on the "Next train" button. |
Yeovil Pen Mill | Atos | Anne | 1, 3 | Platform 2 (which shares the same track as Platform 1) is disused. |
Greater Anglia stations[]
Most or all Greater Anglia Stations have received TTS Ivona Amy with the installment of new Blackbox CIS screens. Berney Arms is the only Greater Anglia station not to have TTS Ivona Amy installed due to it only having very few train services per day as well as telecommunications issues as a result of it being located in the middle of nowhere.
Station | System | Voice | Platforms | |
---|---|---|---|---|
Acle | Blackbox | Ivona Amy | 1, 2 | |
Alresford | Blackbox | Ivona Amy | 1, 2 | Platform length 7 coaches long. |
Althorne | Blackbox | Ivona Amy | 1 | Only one platform. Platform length 6 coaches long. |
Attleborough | Blackbox | Ivona Amy | Global | |
Audley End | Blackbox | Ivona Amy | Global | Announcements are broken as of 30/08/23. |
Battlesbridge | Blackbox | Ivona Amy | 1 | Only one platform. Platform length 7 coaches long. |
Beccles | Blackbox | Ivona Amy | 1, 2 | |
Braintree | Blackbox | Ivona Amy | 1 | Only one platform. |
Braintree Freeport | Blackbox | Ivona Amy | 1 | Only one platform. Platform length 6 coaches long. |
Brundall | Blackbox | Ivona Amy | 1, 2 | |
Brundall Gardens | Blackbox | Ivona Amy | 1, 2 | |
Bishops Stortford | Blackbox | Ivona Amy | 1, 2-3 | Anne replaced Unknown Female from BR Ditra in 2011. Ivona Amy replaced Anne in 2019/20. |
Billericay | Blackbox | Ivona Amy | Global | |
Bures | Blackbox | Ivona Amy | 1 | Only one platform. |
Burnham-on-Crouch | Blackbox | Ivona Amy | 1 | Only one platform. Platform length 7 coaches long. |
Bury St Edmunds | Blackbox | Ivona Amy | Global | |
Brampton (Suffolk) | Blackbox | Ivona Amy | 1 | Only one platform. |
Brandon | Blackbox | Ivona Amy | Global | |
Brimsdown | Blackbox | Ivona Amy | Global | Platform length 7 coaches long. |
Broxbourne | Blackbox | Ivona Amy | Global | |
Buckenham | Blackbox | Ivona Amy | 1, 2 | |
Cambridge | Blackbox | Ivona Amy | Global | Previously Celia Drummond Pre. 2009.
Anne was replaced after Jan 2020. Old Atlas horn speakers still in situ but no longer in use. |
Cambridge North | Blackbox | Ivona Amy | Global | |
Cantley | Blackbox | Ivona Amy | Global | |
Chappel & Wakes Colne | Blackbox | Ivona Amy | 1 | Platforms 2 and 3 are used by East Anglian Railway Museum. |
Chelmsford | Blackbox | Ivona Amy | Global | |
Cheshunt | Blackbox | Ivona Amy | 1, 2-3 | Platform 3 for Overground services via Seven Sisters. |
Clacton-on-sea | Blackbox | Ivona Amy | Global | |
Colchester | Blackbox | Ivona Amy | Global | Announcements are quiet at this station. |
Colchester Town | Blackbox | Ivona Amy | 1 | Only one platform. |
Cressing | Blackbox | Ivona Amy | 1 | Only one platform. Platform length 6 coaches long. |
Cromer | Blackbox | Ivona Amy | Global | |
Darsham | Blackbox | Ivona Amy | 1, 2 | |
Derby Road | Blackbox | Ivona Amy | 1, 2 | |
Diss | Blackbox | Ivona Amy | Global | Uses "Male C" for generic recordings. |
Dovercourt | Blackbox | Ivona Amy | 1 | Only one platform. |
Dullingham | Blackbox | Ivona Amy | Global | |
Eccles Road | Blackbox | Ivona Amy | 1, 2 | |
Elsenham | Blackbox | Ivona Amy | Global | |
Elmswell | Blackbox | Ivona Amy | Global | |
Ely | Blackbox | Ivona Amy | Global | |
Enfield Lock | Blackbox | Ivona Amy | Global | |
Felixstowe | Blackbox | Ivona Amy | 1 | Only one platform. |
Frinton-on-sea | Blackbox | Ivona Amy | 1 | Only one platform. |
Great Bentley | Blackbox | Ivona Amy | Global | Platform length 7 coaches long. |
Great Chesterford | Blackbox | Ivona Amy | Global | |
Great Yarmouth | Blackbox | Ivona Amy | Concourse | Concourse only.
Old Davenport projector speakers are still in use. |
Gunton | Blackbox | Ivona Amy | 1 | Only one platform. |
Haddiscoe | Blackbox | Ivona Amy | Global | |
Halesworth | Blackbox | Ivona Amy | 1, 2 | |
Harling Road | Blackbox | Ivona Amy | 1, 2 | |
Harlow Mill | Blackbox | Ivona Amy | Global | Announcements are quiet. Fast trains are not announced. Platform length 7 coaches long. |
Harlow Town | Blackbox | Ivona Amy | Global | Amy replaced Anne in late August 2020. Amy could not announce "Stansted Express" at this station prior to August 2023. |
Harwich International | Blackbox | Ivona Amy | (1), 2, (3) | Platforms 1 and 3 are rarely used. |
Harwich Town | Blackbox | Ivona Amy | 1 | Only one platform. |
Hatfield Peverel | Blackbox | Ivona Amy | Global | |
Hertford East | Blackbox | Ivona Amy | Global | |
Hockley | Blackbox | Ivona Amy | Global | |
Hoveton & Wroxham | Blackbox | Ivona Amy | Global | |
Hythe | Blackbox | Ivona Amy | Global | |
Ingatestone | Blackbox | Ivona Amy | Global | |
Ipswich | Blackbox | Ivona Amy | Global | Originally Boofay, then replaced by National Express East Anglia in 2009 by Anne, who was replaced by Ivona Amy in 2020 due to technical issues. |
Kelvedon | Blackbox | Ivona Amy | Global | |
Kennett | Blackbox | Ivona Amy | Global | |
Kirby Cross | Blackbox | Ivona Amy | Global | |
Lakenheath | Blackbox | Ivona Amy | 1, 2 | |
Lea Bridge | Blackbox | Ivona Amy | Global | Station reopened in May 2016. Platform length 7 coaches long. |
Lingwood | Blackbox | Ivona Amy | 1 | Only one platform. |
Lowestoft | Blackbox | Ivona Amy | Concourse | Platforms numbered 2, 3 and 4. There is no Platform 1. |
Manningtree | Blackbox | Ivona Amy | Global | Platform 1 for Harwich trains. |
Manea | Blackbox | Ivona Amy | 1, 2 | |
March | Blackbox | Ivona Amy | 1 | No speakers on platform 2. |
Marks Tey | Blackbox | Ivona Amy | Global | Platform 3 for trains to Sudbury (Suffolk). |
Melton | Blackbox | Ivona Amy | 1 | Only one platform. |
Meridian Water | Blackbox | Ivona Amy | Global | Platform 1 does not exist. Platforms 3 and 4 are rarely used and mostly have fast train announcements. Platforms numbered 2, 3 and 4. |
Mistley | Blackbox | Ivona Amy | 1, 2 | Platform length 3 coaches long. |
Needham Market | Blackbox | Ivona Amy | 1, 2 | |
Newmarket | Blackbox | Ivona Amy | 1 | Only one platform. |
Newport (Essex) | Blackbox | Ivona Amy | 1, 2 | Platform length 7 coaches long. |
Northumberland Park | Blackbox | Ivona Amy | Global | Platform 2 is served for trains that terminate at Meridian Water. Platforms numberd 2, 3 and 4.
No Platform 1. |
North Fambridge | Blackbox | Ivona Amy | 1, 2 | |
North Walsham | Blackbox | Ivona Amy | 1, 2 | |
Norwich | Blackbox | Ivona Amy | Global | |
Oulton Broad North | Blackbox | Ivona Amy | Global | |
Oulton Broad South | Blackbox | Ivona Amy | 1 | Only one platform. |
Ponders End | Blackbox | Ivona Amy | Global | Platform length 7 coaches long. |
Prittlewell | Blackbox | Ivona Amy | Global | |
Rayleigh | Blackbox | Ivona Amy | Global | |
Reedham (Norfolk) | Blackbox | Ivona Amy | Global | |
Rochford | Blackbox | Ivona Amy | Global | |
Roughton Road | Blackbox | Ivona Amy | 1 | Only one platform. |
Roydon | Blackbox | Ivona Amy | 1, 2 | Announcements are quiet. |
Rye House | Blackbox | Ivona Amy | Global | Platform length 6 coaches long. |
Salhouse | Blackbox | Ivona Amy | 1, 2 | |
Sawbridgeworth | Blackbox | Ivona Amy | 1, 2 | |
Saxmundham | Blackbox | Ivona Amy | 1, 2 | |
Shelford | Blackbox | Ivona Amy | Global | |
Shenfield | Blackbox | Ivona Amy | Global | Anne replaced Boofay in 2009. Ivona Amy replaced Anne in 2020.
Clearer quality speakers at Shenfield are on Plat 3 & 4, and on platform 5 (Elizabeth line). |
Sheringham | Blackbox | Ivona Amy | 1 | Only one platform. Station also served by North Norfolk Railway, a Heritage Railway. |
Shippea Hill | Blackbox | Ivona Amy | 1, 2 | |
Soham | Blackbox | Ivona Amy | 1 | Opened 13/12/2021. Only one platform. |
Somerleyton | Blackbox | Ivona Amy | Global | |
Southend Airport | Blackbox | Ivona Amy | Global | |
Southend Victoria | Blackbox | Ivona Amy | Global | |
South Woodham Ferrers | Blackbox | Ivona Amy | 1 | Only one platform. |
Southminster | Blackbox | Ivona Amy | 1 | Only one platform. Platform length 7 coaches long. |
Spooner Row | Blackbox | Ivona Amy | 1, 2 | |
Stansted Airport | Blackbox | Ivona Amy | Global | |
Stansted Mountfitchet | Blackbox | Ivona Amy | Global | |
Stowmarket | Blackbox | Ivona Amy | Global |
"Penalty Fares" & "Yellow Line" announcement by "Male C" - see above. |
St. Margarets (Hertfordshire) | Blackbox | Ivona Amy | Global | |
Sudbury (Suffolk) | Blackbox | Ivona Amy | 1 | Only one platform. |
Thorpe-le-Soken | Blackbox | Ivona Amy | Global | |
Thetford | Blackbox | Ivona Amy | Global | |
Thurston | Blackbox | Ivona Amy | Global | |
Trimley | Blackbox | Ivona Amy | 1 | Platform 2 is disused. |
Tottenham Hale | Blackbox | Ivona Amy | Global | Platform 2 is served for trains that terminate at Meridian Water. Platforms numbered 2, 3 and 4.
No Platform 1. |
Waltham Cross | Blackbox | Ivona Amy | Global | Platform length 7 coaches long. |
Walton-on-the-Naze | Blackbox | Ivona Amy | 1 | |
Ware | Blackbox | Ivona Amy | 1 | |
Weeley | Blackbox | Ivona Amy | Global | Platform length 7 coaches long. |
West Runton | Blackbox | Ivona Amy | 1 | Only one platform. |
Westerfield | Blackbox | Ivona Amy | Global | No Stand Clear Messages are read through for freight trains. |
White Notley | Blackbox | Ivona Amy | 1 | Only one platform. |
Whittlesford Parkway | Blackbox | Ivona Amy | Global | |
Whittlesea | Blackbox | Ivona Amy | Global | |
Wickford | Blackbox | Ivona Amy | 1-2, 3-4 | Platform 1 for services to Southminster.
Platform 4 is rarely used. |
Wickham Market | Blackbox | Ivona Amy | 1 | Only one platform. |
Witham | Blackbox | Ivona Amy | 1, 2-3, 4 | Platform 1 is rarely used.
Platform 4 Braintree branch. |
Wivenhoe | Blackbox | Ivona Amy | Global | |
Woodbridge | Blackbox | Ivona Amy | 1, 2 | |
Worstead | Blackbox | Ivona Amy | 1 | Only one platform. |
Wrabness | Blackbox | Ivona Amy | Global | Platform length 3 coaches long. |
Wymondham | Blackbox | Ivona Amy | Global |
Island Line (SWR) Stations[]
Acapela Rachel was installed across the Island Line network during 2021 as part of the refurbishment of the whole line and stations.
Smallbrook Junction is the only station on the Isle of Wight to not have Acapela Rachel installed. This is because there are no speakers or screens at that station. Also it is not publicly accessible by road and is only open when the heritage railway is open which is mainly during the summer.
Script goes as followed for any station including start points like Shanklin and Ryde Pier Head, typically made 5 minutes before arrival or departure: 'The next train to arrive at Platform 1 is the 15:15 service to, Ryde Pier Head. This service is currently on time. Calling at: Lake, Sandown, Brading, Smallbrook Junction, Ryde St Johns Road, Ryde Esplanade, and, Ryde Pier Head. This service is operated by Island Line.'
Station | System | Voice | Platforms | Notes |
---|---|---|---|---|
Brading | MicroPA | Acapela Rachel | 1, 2 | Platform 2 was reinstated during modernisation in 2021. |
Lake | MicroPA | Acapela Rachel | 1 | Only one platform. |
Ryde Esplanade | MicroPA | Acapela Rachel | 1 | Only one platform. Platform 2 is disused. |
Ryde Pier Head | MicroPA | Acapela Rachel | 1 | Only one platform. Platform 2 is disused. |
Ryde St Johns Road | MicroPA | Acapela Rachel | 1, 2+3 | Platform 3 is rarely used. |
Sandown | MicroPA | Acapela Rachel | 1, 2 | |
Shanklin | MicroPA | Acapela Rachel | 1 | New CIS screens installed in 2021. Acapela Rachel announces through the CIS screen. Only one platform. |
Irish Rail (Iarnród Éireann)[]
Irish Rail use the KeTech system and is announced by Michael Comyn, a 4 tone chime is played with announcements (similar to it being used on Phil Sayer). Announcements vary between 2 to 3 announcements per train. Celia announces generic announcements such as "Mind the Gap" and "Customers are requested to stand behind the yellow line.". Emer O'Flaherty announceas stand clear announcements in both English and Irish (Bilingual) previously it was Michael just English. "Please stand back from the platform edge, train now approaching!". Irish Rail have signed an 8 year contract with KeTech as of 2022.
Station | System | Voice | Platforms | Notes |
---|---|---|---|---|
Ardrahan | KeTech | Michael | 1 | |
Ashtown | KeTech | Michael | 1, 2 | |
Athenry | KeTech | Michael | Global | |
Athlone | KeTech | Michael | Global | |
Attymon Halt | KeTech | Michael | 1 | |
Ballinasloe | KeTech | Michael | Global | |
Blackrock | KeTech | Michael | 1, 2 | |
Broombridge | KeTech | Michael | 1, 2 | |
Booterstown | KeTech | Michael | 1, 2 | |
Bray Daly | KeTech | Michael | Global | DART Line. |
Clara | KeTech | Michael | Global | |
Craughwell | KeTech | Michael | 1 | This station only has 1 platform. |
Cork | KeTech | Michael | Global | |
Dalkey | KeTech | Michael | 1, 2 | DART Line. |
Drogheda | KeTech | Michael | Global | |
Dublin Connolly | KeTech | Michael | Global | Celia announces "Mind the Gap." |
Dublin Heuston | KeTech | Michael | Global | There is no platform 9. Each announcements starts with the ASL-Two tone Chime cutting out the Ditra four tone Chimes. |
Dublin Pearse | KeTech | Michael | Global | |
Dunboyne | KeTech | Michael | Global | |
Ennis | KeTech | Michael | 1, 2 | |
Galway | KeTech | Michael | Global | |
Glenageary | KeTech | Michael | 1, 2 | |
Gort | KeTech | Michael | 1, 2 | |
Grand Canal Dock | KeTech | Michael | Global | |
Greystones | KeTech | Michael | 1, 2 | DART Line. |
Hansfield | KeTech | Michael | Global | |
Hazelhatch & Celbridge | KeTech | Michael | 1, 2-4, 5 | Platforms 1 and 5 are mainly passing services. |
Howth Junction & Donghmede | KeTech | Michael | 1, 2-3, 4 | |
Howth | KeTech | Michael | Global | |
Kildare | KeTech | Michael | Global | |
Killiney | KeTech | Michael | 1, 2 | DART Line. |
Lansdowne Road | KeTech | Michael | 1, 2 | |
Laytown | KeTech | Michael | 1, 2 | |
Lexlip Confey | KeTech | Michael | Global | |
Lexlip Louisa Bridge | KeTech | Michael | Global | |
Limerick | KeTech | Michael | Global | |
Limerick Junction | KeTech | Michael | Global | |
M3 Parkway | KeTech | Michael | Global | |
Malahide | KeTech | Michael | 1, 2 | |
Mallow | KeTech | Michael | 1, 2 | |
Maynooth | KeTech | Michael | 1, 2 | |
Monasterevin | KeTech | Michael | 1, 2 | |
Newbridge | KeTech | Michael | Global | |
Oranmore | KeTech | Michael | Global | |
Pelletstown | KeTech | Michael | 1, 2 | |
Portarlington | KeTech | Michael | Global | |
Portmarnock | KeTech | Michael | 1, 2 | |
Rosslare Europort | KeTech | Michael | Global | |
Shankill | KeTech | Michael | 1, 2 | |
Sutton (Ireland) | KeTech | Michael | 1, 2 | DART Line. |
Thurles | KeTech | Michael | 1, 2 | |
Tralee | KeTech | Michael | Global | |
Tullamore | KeTech | Michael | Global | |
Woodlawn | KeTech | Michael | 1 |
London North Eastern Railway (LNER)[]
LNER have installed new Customer Information Screens at their stations. Several stations now have new Penton P.A speakers, replacing the old horn speakers.
Newcastle and York were upgraded as part of a separate stations upgrade program, on behalf of Network Rail. Hence why they have new Infotec Screens, as well as ATOS Anne already installed there. The remaining upgrades are being done by LNER.
LNER's own upgrades feature different scripting to the default Worldline system:
The Platform change script is now "Your attention please! There has been a platform change for the xx:xx (TOC) service to (destination). It will now leave from Platform (number)"
During April 2024, LNER has adopted the same short platform script as South Western Railway. "Some stations have short platforms. If you are travelling to..."
As of June 2023, ALL LNER Stations are now voiced by ATOS Anne with the option of roaming PA interuptions by station staff.
Station | System | Voice | Platforms | Notes |
---|---|---|---|---|
Berwick-upon-Tweed | Atos | Anne | Global | New Infotec / Kadfire Concourse Screens. Anne was enabled in January 2023. |
Darlington | Atos | Anne | 1-2, 3-4 | Anne was enabled on Friday 25th of November 2022. |
Doncaster | Atos | Anne | Global | New P.A speakers installed.
New customer information screens installed. Anne was enabled in December 2022. |
Durham | Atos | Anne | Global | Anne was enabled in December 2022. |
Grantham | Atos | Anne | Global | New P.A speakers installed.
New customer information screens installed (Jan 2022). Anne was enabled in June 2023. |
Newark Northgate | Atos | Anne | Global | New P.A speakers installed.
New customer information screens installed (Jan 2022). Kadfire Screen installed in booking hall. RailPoint e-Paper screen installed on Platform 1, Zone 3. Anne was enabled in December 2022. Fast trains on Platform 1 are announced twice due to the close proximity of the previous signal. Non-Stop Announcements on Platform 3 are voiced by TTS Male instead of Anne. |
Newcastle | Atos | Anne | Global | Anne was enabled in June 2020 at Newcastle.
Newcastle has new smooth scrolling orange LED Infotec Screens. |
Peterborough | Atos | Anne | 1, 2-3, 4-5, 6-7 | New P.A Speakers Installed (Pre. 2022).
New customer information screens installed (April 2022). Anne enabled at Peterborough on Monday 17th October 2022. Announcements are made appropriate to their relevant platform. Only platform alterations, safety and generic announcements are made globally. Replacement bus announcements are sometimes made. |
Retford | Atos | Anne | Global | New P.A speakers installed.
New customer information screens installed. Anne was enabled in January 2023. Brand new speakers have been installed on Platforms 3 and 4. |
Wakefield Westgate | Atos | Anne | Global | New P.A speakers installed.
New customer information screens installed. Anne was enabled at Wakefield Westgate on Thursday 15th December 2022. |
York | Atos | Anne | Global | Anne was enabled at York on Friday 20th March 2020. Announcements are of poor quality due to the amplifier needing replacing.
York has new smooth scrolling orange LED Infotec Screens. |
London Northwestern Railway (LNR) stations[]
Most stations with announcements are Global Ivona Amy. Specifics will be listed below as and when.
It has been confirmed by station staff at WMR/LNR that Anne will be replaced by Ivona Amy in the future as Abellio holds 70% of the company and will use the same settings as Greater Anglia. CIS screens at LNR will be replaced by new screens from Blackbox.
TTS Ivona Amy has started to be installed at some stations for specific announcements e.g. Timetable Changes and Tactile Pathing Platform Edge. Polesworth is the only station on the LNR network not to have Ivona Amy installed due to it only having 1 train per day from Northampton to Crewe on Mondays to Saturdays and no services at all on Sundays.
*As of October 2023, all LNR stations except Polesworth are expected to have now ported over to Ivona Amy, we will await confirmation before removing this notification*
Station | System | Voice | Platforms | Notes |
---|---|---|---|---|
Acton Bridge | Blackbox | Ivona Amy | Global | Announcements are quiet.
No CIS Screens. |
Apsley | Blackbox | Ivona Amy | Global | P3/4 only used. |
Aspley Guise | Blackbox | Ivona Amy | 1, 2 | Marston Vale Line. |
Atherstone | Blackbox | Ivona Amy | Global | Chimes play before each announcement. |
Bedford St. Johns | Blackbox | Ivona Amy | Global | Marston Vale line. Amy replcaed Anne in late 2022. Only one platform. |
Berkhamsted | Blackbox | Ivona Amy | Global | Only platforms 3 and 4 are mainly used. |
Bricket Wood | Blackbox | Ivona Amy | Global | St Albans Abbey Line. Only one platform. |
Bow Brickhill | Blackbox | Ivona Amy | Global | Marston Vale line. Amy replcaed Anne in late 2022. |
Bletchley | Blackbox | Ivona Amy | Global | Platform 5/6 mainly used by Marston Vale Line services. Platforms 1/2 are fast lines and Amy only announces fast trains on those platforms. |
Cheddington | Blackbox | Ivona Amy | Global | P1/2 are the fast lines that are only used in a emergency.
P3/4 are used for all stopping trains. Amy replaced Anne in late 2022/early 2023. |
Coleshill Parkway | Blackbox | Ivona Amy | Global | Served by CrossCountry services only. |
Fenny Stratford | Blackbox | Ivona Amy | Global | Marston Vale line. Amy replaced Anne in late 2022. Only one platform. |
Garston | Blackbox | Ivona Amy | 1 | St Albans Abbey Line. Only one platform. |
Hartford | Blackbox | Ivona Amy | Global | |
Hemel Hempstead | Blackbox | Ivona Amy | Global | Platforms 1 and 2 are fast lines only fast train announcements play on those platforms. Platforms 3 and 4 are mainly used. |
How Wood | Blackbox | Ivona Amy | 1 | St Albans Abbey Line. Only one platform. |
Kempston Hardwick | Blackbox | Ivona Amy | Global | Marston Vale line. Amy repalced Anne in late 2022. |
Kings Langley | Blackbox | Ivona Amy | Global | P3/4 only used. Anne replaced in August 2023. |
Leighton Buzzard | Blackbox | Ivona Amy | Global | Platforms 1 and 2 are inaccessible. Only platforms 3 and 4 are used. Anne replaced at an unknown date. |
Lidlington | Blackbox | Ivona Amy | 1, 2 | Marston Vale Line. |
Lichfield Trent Valley | Blackbox | Ivona Amy | 1,2,3 | P3 for trains WMR Cross City line services to Bromsgrove via Birmingham.
No WMR signage at this station. |
Long Buckby | Blackbox | Ivona Amy | Global | |
Millbrook (Bedfordshire) | Blackbox | Ivona Amy | 1, 2 | Marston Vale Line. |
Milton Keynes Central | Blackbox | Ivona Amy | 1-2/2A, 3-4, 5-6 | Platform 2A is rarely used. |
Northampton | Blackbox | Ivona Amy | 2-3, 1-4, 5 | Has new CIS screens.
P1 is the same platform island as P4. |
Nuneaton | Blackbox | Ivona Amy | 1, 2-3, 4-5, 6-7 | Platform 1 is for trains to Coventry and Leamington Spa.
Platforms 2 and 5 are for LNWR stopping services. Platforms 3 and 4 are for Avanti West Coast services between London Euston and Manchester Piccadilly and are also the fast lines. Platforms 6 and 7 are for CrossCountry trains only. |
Park Street | Blackbox | Ivona Amy | 1 | St Albans Abbey Line. Only one platform. |
Penkridge | Blackbox | Ivona Amy | Global | |
Ridgmont | Blackbox | Ivona Amy | 1, 2 | Marston Vale Line. |
Rugeley Trent Valley | Blackbox | Ivona Amy | Global | Platform 3 is for trains via Walsall and Birmingham New Street. |
St Albans Abbey | Blackbox | Ivona Amy | 1 | St Albans Abbey Line. Only one platform. |
Stewartby | Blackbox | Ivona Amy | 1, 2 | Marston Vale Line. |
Tamworth | Blackbox | Ivona Amy | 1-2, 3-4 | Announcements on Platforms 3 and 4 are quiet.
Platforms 3 and 4 are for CrossCountry services via Derby and Birmingham. |
Tring | Blackbox | Ivona Amy | Global | Amy replaced Anne in August 2023. |
Water Orton | Blackbox | Ivona Amy | Global | Served by CrossCountry services only. |
Watford Junction | Blackbox | Ivona Amy | 1-4/6, 7/8, 9/10, 11 | P1-4 - London Overground.
P6-7 - fast lines. P8-9 - slow lines. P10 is used by Southern. P11 - St Albans Abbey Line. Amy replaced Anne in August 2023. Platform 5 was removed in 1982 as part of a major rebuild. |
Watford North | Blackbox | Ivona Amy | 1 | St Albans Abbey Line. Only one platform. |
Winsford | Blackbox | Ivona Amy | Global | |
Woburn Sands | Blackbox | Ivona Amy | 1, 2 | Marston Vale Line. |
Wolverton | Blackbox | Ivona Amy | 1, 2, 3, 4 | Platforms 1 and 2 are fast lines only fast train announcements play on those platforms. Amy replaced Anne at an unknown date in 2023. |
London Overground stations[]
Update November 2023: TfL have confirmed Arriva Rail London (London Overground) will replace ALL remaining Ditra installations voiced by Emma Hignett (and Only Woman at Norwood Junction for the "City Thameslink" recording) with Wordline, voiced by Anne. This includes all stations on the Watford DC line. Replacements are underway and is due for completion within the new few months.
The GOBLIN line, Stratford (Platforms 1 and 2) and Gospel Oak stations have had Atos Anne in July-September 2022 and the East London Line (between Dalston Junction and Surrey Quays) replacing Thales in May 2020 and then stations on the North London and Watford DC lines have had Atos Anne installed in December 2023. Wandsworth Road, Clapham High Street and the stations from New Cross Gate to Crystal Palace and West Croydon have had the Amey system replaced by Atos in February 2024, these were the old systems left over from Southern which had the Circus horn played. Highbury & Islington has had the Amey system replaced by Atos in March 2024.
The stations that share platforms with the LU Bakerloo and District lines between Harrow & Wealdstone and Queen's Park and at Kew Gardens and Gunnersbury, respectively still use the Amey system, except for Willesden Junction. This will also be replaced by the Atos system during 2024.
Station | System | Voice | Platforms | Notes |
---|---|---|---|---|
Acton Central | Atos | Anne | Global | Anne replaced Emma in December 2023. |
Anerley | Atos | Anne | 1, 2 | Anne replaced Emma in February 2024. |
Barking Riverside | Atos | Anne | Global | Station opened 18th July 2022. One announcement per train only 3 minutes before departure. |
Bethnal Green | Atos | Anne | Global | |
Blackhorse Road | Atos | Anne | 1, 2 | Anne replaced Emma in July 2022. |
Brockley | Atos | Anne | Global | Anne replaced Emma in February 2024. |
Brondesbury | Atos | Anne | Global | Anne replaced Emma in December 2023. |
Brondesbury Park | Atos | Anne | Global | Anne replaced Emma in December 2023. |
Bruce Grove | Atos | Anne | 1, 2 | |
Bush Hill Park | Atos | Anne | Global | |
Bushey | Atos | Anne | 1, 2 | 1/2 Overground services only.
3/4 Fast Trains only. 5/6 Stopping services (WMT) Anne replaced Emma on Platforms 1/2 in December 2023. Arriva Rail London took over announcements from WMT on P3 to 6 in 2022/23 according to FOI link. |
3-6 | ||||
Carpenders Park | Atos | Anne | Global | Anne replaced Emma in December 2023. |
Canada Water | Atos | Anne | 3, 4 | Anne replaced Emma in May 2020. |
Telent | Elinor Hamilton | 1, 2 | Jubilee line. | |
Canonbury | Atos | Anne | 1, 2, 3, 4 | Anne replaced Emma in December 2023. |
Caledonian Road & Barnsbury | Atos | Anne | 2+3 | Platform 1 is disused. Anne replaced Emma in December 2023. |
Camden Road | Atos | Anne | Global | Anne replaced Emma in December 2023. |
Cambridge Heath | Atos | Anne | Global | |
Clapham High Street | Atos | Anne | 1, 2 | Emma replaced Phil in 2012 then Anne replaced Emma in February 2024.
Stand clear announcements used to play with the circus horn from the old "Ditra/Amey" system, similar to the case at Norwood Junction. |
Clapton | Atos | Anne | 1, 2 | |
Chingford | Atos | Anne | 1, 2-3 | |
Crouch Hill | Atos | Anne | 1, 2 | Anne replaced Emma in July 2022. |
Crystal Palace | Atos | Anne | 1, 2, 3-4, 5-6 | Emma replaced Phil & Celia in late 2012 then Anne replaced Emma in February 2024. Previously used "The next train at Platform X.." similar to Chiltern Railways KeTech system. Southern uses Platforms 1, 2, 4 and 6. Platform 5 is used by London Overground services. Platform 3 is rarely used. For LO services, Emma would announce "Calling at all stations to Highbury & Islington" instead of calling points. Platforms 7 and 8 are disused.
Stand clear announcements used to play with the circus horn from the old "Ditra/Amey" system, similar to the case at Norwood Junction. |
Dalston Junction | Atos | Anne | Global | Anne replaced Emma in May 2020.
One announcement per train 4 minutes before arrival or departure. |
Dalston Kingsland | Atos | Anne | Global | Anne replaced Emma in December 2023. |
Edmonton Green | Atos | Anne | Global | |
Emerson Park | Atos | Anne | Global | Only one platform. |
Enfield Town | Atos | Anne | 2 | Platforms 1+3 are seldom used |
Finchley Road & Frognal | Atos | Anne | Global | Anne replaced Emma in December 2023. |
Forest Hill | Atos | Anne | 1, 2 | Anne replaced Emma in February 2024. |
Gospel Oak | Atos | Anne | 1, 2, 3 | Anne replaced Emma in July 2022. On 10th October, the announcements were fixed and are working again but are quiet, most likely due to houses nearby.
Platforms 1 and 2 - two announcements per train, first one is 3 minutes before arrival, second one is as it approaches Platform 3 - one announcement per train 3 minutes before departure |
Gunnersbury | Ditra | Emma | Global | |
Hackney Central | Atos | Anne | Global | Anne replaced Emma in December 2023. |
Hackney Downs | Atos | Anne | Global | |
Hackney Wick | Atos | Anne | Global | Anne replaced Emma in December 2023. |
Hampstead Heath | Atos | Anne | Global | Anne replaced Emma in December 2023. |
Harlesden | Ditra | Emma | 1, 2 | |
Harringay Green Lanes | Atos | Anne | Global | Anne replace Emma in July 2022. |
Harrow & Wealdstone | Ditra | Emma | 1, 2-3, 4-5, 6 | Platforms 3 and 4 are fast line platforms which only have fast train announcements.
Platform 7 (bay platform next to Platform 6) has been disused since 1964. |
Hatch End | Atos | Anne | 1,, 2 | Anne replaced Emma in December 2023. |
Headstone Lane | Atos | Anne | 1, 2 | Anne replaced Emma in December 2023. |
Highams Park | Atos | Anne | Global | |
Highbury & Islington | Telent | Elinor Hamilton | 3, 5 | Victoria line. |
Atos | Anne | 4, 6 | Great Northern. CIS is managed by Great Northern. | |
1, 2, 7, (8) | London Overground services. Anne replaced Emma in March 2024.
No announcements on Platform 8. | |||
Homerton | Atos | Anne | 1, 2 | Anne replaced Emma in December 2023. |
Honor Oak Park | Atos | Anne | 1, 2 | Anne replaced Emma in February 2024. |
Haggerston | Atos | Anne | 1, 2 | Anne replaced Emma in May 2020. |
Hoxton | Atos | Anne | 1, 2 | Anne replaced Emma in May 2020. |
Imperial Wharf | Atos | Anne | Global | Emma replaced Anne in 2014 then Anne replaced Emma in December 2023. |
Kensington Olympia | Atos | Anne | 2, 3 | Platform 1 used for District line (irregular service/peak times only). No announcements on Platform 1. Anne replaced Emma in December 2023. |
Kentish Town West | Atos | Anne | 1, 2 | Anne replaced Emma in December 2023.
Announcements are very quiet due to houses nearby. |
Kensal Green | Ditra | Emma | 1, 2 | |
Kensal Rise | Atos | Anne | Global | Anne replaced Emma in December 2023. |
Kenton | Ditra | Emma | 1, 2 | Platforms shared with London Underground Bakerloo line. |
Kew Gardens | Ditra | Emma | 1, 2 | |
Kilburn High Road | Atos | Anne | Global | Anne replaced Emma in December 2023. |
Leyton Midland Road | Atos | Anne | 1, 2 | Anne replaced Emma in July 2022. |
Leytonstone High Road | Atos | Anne | 1, 2 | Anne replaced Emma in July 2022. |
London Fields | Atos | Anne | Global | |
New Cross Gate | Atos | Anne | 1-2, 3-4, 5 | Platform 3 and 4 are fast line platforms (trains used to stop at these platforms when managed by Southern) Platform 1 used to be London Underground before becoming a through platform for London Overground. Anne replaced Emma in February 2024. |
North Wembley | Ditra | Emma | Global | |
Norwood Junction | Atos | Anne | 1, (2)-3, 4-5, 6-(7) | Emma replaced Phil and Celia in October 2014 then Anne replaced Emma and "Only Woman" in February 2024, now with one announcement per train. Emma also announced Thameslink services at this station, Only Woman announced "City Thameslink" along the calling points.
Platform 3 and 4 are fast lines and stopping service platforms. Both are used by Thameslink services. Platforms 1 & 2 share the same track but all doors open on Platform 1. Platform 7 is disused. Stand clear announcements used to play with the circus horn from the old Ditra system. |
Penge West | Atos | Anne | 1, 2 | New screens installed at this station. Anne replaced Emma in February 2024. |
Queens Park | Ditra | Emma | 1-4 | Platforms 2 and 3 are Bakerloo line platforms. Platforms 5 and 6 are disused. |
Rectory Road | Atos | Anne | 1, 2 | |
Rotherhithe | Atos | Anne | 1, 2 | Anne replaced Emma in May 2020. |
Shadwell | Atos | Anne | 1, 2 | Anne replaced Emma in May 2020. |
Shepherd's Bush | Atos | Anne | 1, 2 | Emma replaced Anne in 2014 then Anne replaced Emma in December 2023. |
Seven Sisters | Atos | Anne | 1, 2 | Anne replaced Unknown Female from BR Ditra in September 2011. |
Telent | Elinor Hamilton | 3, 5 | Victoria line. Platform 4 is a terminating platform that is rarely used and only has manual announcements. | |
Shoreditch High Street | Atos | Anne | 1, 2 | Anne replaced Emma in May 2020. |
Silver Street | Atos | Anne | 1 ,2 | |
Southbury | Atos | Anne | Global | |
St James Street | Atos | Anne | 1, 2 | |
Stamford Hill | Atos | Anne | 1, 2 | |
Stoke Newington | Atos | Anne | Global | |
South Acton | Atos | Anne | 1, 2 | Announcements are quiet. Anne replaced Emma in December 2023. |
South Hampstead | Atos | Anne | 1, 2 | Anne replaced Emma in December 2023. |
South Kenton | Ditra | Emma | 1-2 | Island platform. |
South Tottenham | Atos | Anne | 1, 2 | Anne replaced Emma in July 2022. |
Southbury | Atos | Anne | 1, 2 | Has new Infotec screens. |
Stonebridge Park | Ditra | Emma | Global | |
Surrey Quays | Atos | Anne | 1, 2 | Anne replaced Emma in May 2020. |
Sydenham | Atos | Anne | Global | Anne replaced Emma in February 2024. |
Theobalds Grove | Atos | Anne | Global | |
Turkey Street | Atos | Anne | Global | |
Upper Holloway | Atos | Anne | 1, 2 | Anne replaced Emma in July 2022. 2 announcements per train. |
Walthamstow Central | Atos | Anne | Global | Liverpool Street-Chingford line |
Walthamstow Queens Road | Atos | Anne | Global | Anne replaced Emma in July 2022. |
Wandsworth Road | Atos | Anne | 1, 2 | Emma replaced Phil in 2012 then Anne replaced Emma in February 2024. Stand clear announcements used to play with the circus horn from the old "Ditra/Amey" system, similar to the case at Norwood Junction. |
Wapping | Atos | Anne | 1, 2 | Anne replaced Emma in May 2020. |
Wanstead Park | Atos | Anne | Global | Anne replaced Emma in July 2022. |
Watford High Street | Atos | Anne | Global | Anne replaced Emma in December 2023. |
Wembley Central | Ditra | Emma | Global | Also announces Bakerloo line.
P1/2 for Bakerloo line and London Overground. P3/4 are not used as they are the fast lines for Avanti/WMT services. P5/6 for stopping Southern services (can only fit 7 coaches). |
West Brompton | Telent | Elinor Hamilton | 1, 2 | District line. |
Atos | Anne | 3, 4 | London Overground Platforms. Anne replaced Emma in December 2023. | |
West Croydon | Atos | Anne | 1, 3-4 | Emma replaced Phil and Celia in October 2014 then Anne replaced Emma in February 2024. No platform 2, formerly a branch line to Wimbledon via Merton Park until 1998. Stand clear announcements used to play along with circus horn from the Ditra system. New Infotec CIS screens have replaced the old Daktronics displays. |
West Hampstead (Overground) | Atos | Anne | Global | Not to be confused with West Hampstead Thameslink and West Hampstead Tube Station.
Anne replaced Emma in December 2023. |
Willesden Junction | Atos | Anne | 1-3, 4-5 | Anne replaced Emma in December 2023.
P1+3 are for Bakerloo line services and London Overground services to Euston and Watford, Platform 2 is a bay platform sometimes used by terminating Overground services from Euston or Stratford. P4+5 - North London line London Overground platforms for services to Stratford, Richmond and Clapham Junction. |
Whitechapel | Atos | Anne | 5, 6 | Anne replaced Emma in May 2020.
The speakers on platform 6 that are closest to the footbridge leading to platform 5 oddly play announcements for trains on platform 5 instead of 6. |
Siemens | Emma | A+B | Elizabeth line. Opened 24th May 2022. | |
Telent | Elinor Hamilton | 1, 2 | District and Hammersmith & City lines. Platforms 3 and 4 were removed in 2010. | |
White Hart Lane | Atos | Anne | Global | Liverpool Street-Enfield/Cheshunt lines |
Woodgrange Park | Atos | Anne | Global | Anne replaced Emma in July 2022. |
Wood Street | Atos | Anne | Global | Liverpool Street-Chingford line |
London Underground Stations[]
Many London Underground stations have Elinor Hamilton on the Telent or iVENCS systems. Some stations have the ASL-3 note chime. Phil Sayer also does "mind the gap please" and some generic safety announcements at most London Underground stations as well as evacuation.
Stations | System | Voice | Platforms | Notes |
---|---|---|---|---|
Acton Town | Telent | Elinor Hamilton | 1, 2, 3, 4 | District and Piccadilly lines. Platform 5 is a disused bay platform for the South Acton shuttle that closed in 1959. |
Aldgate | Telent | Elinor Hamilton | Global | Circle and Metropolitan lines. |
Aldgate East | Telent | Elinor Hamilton | Global | District and Hammersmith & City lines. |
Alperton | Telent | Elinor Hamilton | Global | Piccadilly line. |
Amersham | Telent | Elinor Hamilton | Global | Metropolitan line. Does not announce Chiltern Railways. Announcements currently broken/disabled. |
Angel | Telent | Elinor Hamilton | Global | Northern line. |
Archway | Telent | Elinor Hamilton | Global | Northern line. ASL-3 note chime is used for all announcements, including Tfl staff pre-recorded announcements. |
Arnos Grove | Telent | Elinor Hamilton | Global | Piccadilly line. Platforms 2 and 3 share the same track but on eastbound trains, doors open on Platform 2 while on westbound trains, doors open on Platform 3. |
Arsenal | Telent | Elinor Hamilton | Global | Piccadilly line. |
Balham | Telent | Elinor Hamilton | Global | Northern line. Phil says "Mind the gap please" |
Bank/Monument | Telent | Elinor Hamilton | Global | Central, Circle, District, Northern and Waterloo & City lines.
DLR departures from Platform 9 has manual announcements. There are no announcements on Platform 10 (DLR arrivals). Phil does left luggage. Elinor does not announce Waterloo & City line train departures on Platforms 7 and 8. When there are disruptions on certain lines, Elinor says "Customer service update from the control room at Bank/Monument" |
Barbican | Telent | Elinor Hamilton | 1, 2 | Circle, Hammersmith & City and Metropolitan lines. Platforms 3 and 4 have been disused since 2009. |
Barking | Telent | None | 2, 3, 6 | District and Hammersmith & City lines. No announcements play on these platforms. |
Atos | Anne | 1, 4, 5, 7, 8 | London Overground and C2C. Note that this station is managed by C2C. | |
Barkingside | Telent | Elinor Hamilton | Global | Central line. |
Barons Court | Telent | Elinor Hamilton | Global | District and Piccadilly lines. |
Battersea Power Station Station | Telent | Elinor Hamilton | Global | Northern line station which opened on 20th September 2021. Phil announces left luggage and Mind the Gap. |
Bayswater | Telent | Elinor Hamilton | 1, 2 | Circle and District lines. Announcements are quiet. |
Becontree | Telent | Elinor Hamilton | Global | District line. |
Belsize Park | Telent | Elinor Hamilton | Global | Northern line. |
Bermondsey | Telent | Elinor Hamilton | Global | Jubilee line. |
Bethnal Green | Telent | Elinor Hamilton | Global | Central line. |
Blackfriars | Telent | Elinor Hamilton | Global | Circle and District lines. |
Blackhorse Road | Telent | Elinor Hamilton | Global | Victoria line. |
Bond Street | Telent | Elinor Hamilton | 1, 2, 3, 4 | Central and Jubilee lines. |
Siemens | Emma | A+B | Elizabeth line. Opened 24th October 2022. | |
Borough | Telent | Elinor Hamilton | Global | Northern line. |
Boston Manor | Telent | Elinor Hamilton | Global | Piccadilly line. |
Bounds Green | Telent | Elinor Hamilton | Global | Piccadilly line. |
Bow Road | Telent | Elinor Hamilton | Global | District and Hammersmith & City lines. |
Brent Cross | Telent | Elinor Hamilton | Global | Northern line. |
Brixton | Telent | Elinor Hamilton | Global | Victoria line. |
Bromley-by-Bow | Telent | Elinor Hamilton | Global | District and Hammersmith & City lines. |
Buckhurst Hill | Telent | Elinor Hamilton | Global | Central line. |
Burnt Oak | Telent | Elinor Hamilton | Global | Northern line. |
Caledonian Road | Telent | Elinor Hamilton | Global | Piccadilly line. |
Camden Town | Telent | Elinor Hamilton | Global | Northern line. Phil does pickpockets. |
Canada Water | Telent | Elinor Hamilton | 1, 2 | Jubilee line. |
Atos | Anne | 3, 4 | London Overground. Anne replaced Emma in May 2020. | |
Canary Wharf | Telent | Elinor Hamilton | Global | Jubilee line. |
Siemens | Emma | A+B | New platforms for Elizabeth Line which opened on 24th May 2022 new Infotec LED CIS screens installed. | |
iVENCS | DLR Female | Global | DLR. | |
Canning Town | Telent | Elinor Hamilton | 5, 6 | Jubilee line. |
iVENCS | DLR Female or Manual | 1, 2, 3, 4 | DLR. Platforms 1 and 2 are former Silverlink platforms that had Anne. Unsure if the DLR Platforms have automated announcements or if they have manual announcements. | |
Cannon Street | Telent | Elinor Hamilton | Global | Circle and District lines. |
Canons Park | Telent | Elinor Hamilton | Global | Jubilee line. |
Chalfont & Latimer | Telent | Elinor Hamilton | 1, 2 | Metropolitan line. Does not announce Chiltern Railways. Platform 3 (bay platform towards Chesham) is rarely used. Services using Platform 3 are not announced. |
Chalk Farm | Telent | Elinor Hamilton | Global | Northern line. |
Chancery Lane | iVENCS | Elinor Hamilton | Global | Central line. |
Charing Cross | Telent | Elinor Hamilton | 1, 2, 5, 6 | Bakerloo and Northern lines. Platforms 3 and 4 are disused Jubilee line Platforms that haven't been used since 1999. |
Chesham | Telent | Elinor Hamilton | 2 | Metropolitan line. Only one platform. Platform 1 is disused. |
Chigwell | Telent | Elinor Hamilton | Global | Central line. |
Chiswick Park | Telent | Elinor Hamilton | Global | District line. |
Chorleywood | Telent | Elinor Hamilton | Global | Metropolitan line. Does not announce Chiltern Railways. |
Clapham Common | Telent | Elinor Hamilton | Global | Northern line. |
Clapham North | Telent | Elinor Hamilton | Global | Northern line. |
Clapham South | Telent | Elinor Hamilton | Global | Northern line. |
Cockfosters | Telent | Elinor Hamilton | 1, (2), 3, 4 | Piccadilly Line. Still says 'Heathrow Terminal 1' even though it's closed. Platforms 2 and 3 share the same track but all doors open on Platform 3. |
Colindale | Telent | Elinor Hamilton | Global | Northern line. |
Colliers Wood | Telent | Elinor Hamilton | Global | Northern line. |
Covent Garden | Telent | Elinor Hamilton | Global | Piccadilly line. |
Croxley | Telent | Elinor Hamilton | Global | Metropolitan line. |
Dagenham East | Telent | Elinor Hamilton | 1, 2, (3) | District line. Platform 3 is rarely used. |
Dagenham Heathway | Telent | Elinor Hamilton | Global | District line. |
Debden | Telent | Elinor Hamilton | Global | Central line. |
Dollis Hill | Telent | Elinor Hamilton | Global | Jubilee line. |
Ealing Broadway | Telent | Elinor Hamilton | 5, 6, 7, 8, 9 | Central and District lines. |
Atos | Anne | 1, 2, 3, 4 | Elizabeth line. Platforms 1 and 2 are fast lines where Anne only announces fast trains. Rodger used to announce here before TfL took over from GWR in 2018. | |
Ealing Common | Telent | Elinor Hamilton | Global | District and Piccadilly lines. |
Earls Court | Telent | Elinor Hamilton | Global | District and Piccadilly lines. |
East Acton | Telent | Elinor Hamilton | Global | Central line. |
East Finchley | Telent | Elinor Hamilton | 1, (2), (3), 4 | Northern line. Platforms 2 and 3 are only used during early mornings and late evenings. |
East Ham | Telent | Elinor Hamilton | Global | District and Hammersmith & City lines. |
East Putney | Telent | Elinor Hamilton | 1, 2 | District line. Platforms 3 and 4 are disused. |
Eastcote | Telent | Elinor Hamilton | Global | Metropolitan and Piccadilly lines. |
Edgware | Telent | Elinor Hamilton | Global | Northern line. |
Edgware Road | Telent | Elinor Hamilton | Global | Bakerloo, Circle, District and Hammersmith & City lines. 2 separate stations. |
Elephant & Castle | Telent | Elinor Hamilton | Global | Bakerloo and Northern lines. |
Elm Park | Telent | Elinor Hamilton | Global | District line. |
Embankment | Telent | Elinor Hamilton | Global | Bakerloo, Circle, District and Northern lines. Oswald Laurence still says "Mind the Gap" on Platform 3 (northbound Northern line) which is often interrupted by station staff. |
Epping | Telent | Elinor Hamilton | Global | Central line. |
Euston | Telent | Elinor Hamilton | Global | Northern and Victoria lines. Phil announces pickpockets. |
Euston Square | Telent | Elinor Hamilton | Global | Circle, Hammersmith & City and Metropolitan lines. |
Fairlop | Telent | Elinor Hamilton | Global | Central line. |
Farringdon | Telent | Elinor Hamilton | 1, 2 | London Underground Platforms (Circle, Hammersmith & City and Metropolitan lines). |
Atos | Anne | 3 | Thameslink Platforms. | |
Matt | 4 | |||
Siemens | Emma | A-B | Elizabeth Line platforms. Opened 24th May 2022. | |
Finchley Central | Telent | Elinor Hamilton | Global | Northern line.
Platform 1 for trains to Mill Hill East and occasional terminating trains. Platform 2 for trains to High Barnet and sometimes Mill Hill East as well as occasional terminating trains. Platform 3 for trains to Central London. |
Finchley Road | Telent | Elinor Hamilton | Global | Jubilee and Metropolitan lines. |
Finsbury Park | Telent | Elinor Hamilton | Global | Piccadilly and Victoria lines. |
Fulham Broadway | Telent | Elinor Hamilton | Global | District line. |
Gants Hill | iVENCS | Elinor Hamilton | Global | Central line. |
Gloucester Road | Telent | Elinor Hamilton | Global | Circle, District and Piccadilly lines. |
Golders Green | Telent | Elinor Hamilton | (1), 2, 3, 4, 5 | Northern line. Platforms 1 and 2 share the same track but all doors open on Platform 2. Platforms 3 and 4 share the same track but on northbound trains, the doors open on Platform 3 while on southbound trains, the doors open on Platform 4. Platform 1 is disused. |
Goldhawk Road | Telent | Elinor Hamilton | Global | Circle and Hammersmith & City lines. |
Goodge Street | Telent | Elinor Hamilton | Global | Northern line. |
Grange Hill | Telent | Elinor Hamilton | Global | Central line. |
Great Portland Street | Telent | Elinor Hamilton | Global | Circle, Hammersmith & City and Metropolitan lines. |
Green Park | Telent | Elinor Hamilton | Global | Jubilee, Piccadilly and Victoria lines. |
Greenford | Telent | Ellinor Hamilton | 1+3 | Central Line on P1+P3.
GWR Greenford branch line to West Ealing on P2. Elinor does not announce GWR services. |
Gunnersbury | Ditra | Emma | Global | District line. CIS is managed by London Overground. |
Hainault | Telent | Elinor Hamilton | Global | Central line. |
Hammersmith | Telent | Elinor Hamilton | Global | Circle, District, Hammersmith & City and Piccadilly lines. 2 separate stations. |
Hampstead | Telent | Elinor Hamilton | Global | Northern line. |
Hanger Lane | Telent | Elinor Hamilton | Global | Central line. |
Harlesden | Ditra | Emma | 1, 2 | Bakerloo line. CIS is managed by London Overground. |
Harrow & Wealdstone | Ditra | Emma | 1, 2-3, 4-5, 6 | Bakerloo line uses Platforms 1 and 2.
Platforms 3 & 4 are fast lines which only have fast train announcements. Platforms 5 and 6 are for stopping WMT and Southern services. Platform 7 (bay platform next to Platform 6) has been disused since 1964. |
Harrow-on-the-Hill | Telent | Elinor Hamilton | 1-(2), 3-4, 5-6 | Metropolitan line. Does not announce Chiltern Railways trains.
Platform 1 - Northound Metropolitan line (fast) and Chiltern Railways. Platform 2 - Southbound Chiltern Railways (sometimes used by Metropolitan line). Platforms 3 and 4 - Northbound Metropolitan line (all-stations and semi-fast). Platforms 5 and 6 - Southbound Metropolitan line (all-stations, fast and semi-fast). |
Hatton Cross | Telent | Elinor Hamilton | Global | One stop before Heathrow.
Piccadilly line announcements still say 'Heathrow Terminal 1' even though it's closed. |
Heathrow Terminals 2 & 3 | Telent | Elinor Hamilton | Global | Piccadilly line. |
Heathrow Terminal 4 | Telent | Elinor Hamilton | Global | Piccadilly line. Only one platform. |
Heathrow Terminal 5 | Telent | None | 5, 6 | Piccadilly line. All announcements are done by the airport's Aviavox system rather than Telent. |
Atos | Anne | 3, 4 | Elizabeth line and Heathrow Express. | |
Hendon Central | Telent | Elinor Hamilton | Global | Northern line. |
High Barnet | Telent | Elinor Hamilton | Global | Northern line. |
High Street Kensington | Telent | Elinor Hamilton | 1, 2, (3), (4) | Circle and District lines. Platforms 3 and 4 are only used on Saturdays and Sundays or during planned engineering works. |
Highbury & Islington | Atos | Anne | 1, 2, 7, (8) | Announces London Overground services. Anne replaced Emma in March 2024.
No announcements on Platform 8. |
4, 6 | Annnounces Great Northern services. CIS on Platforms 4 and 6 is controlled by Great Northern. | |||
Telent | Elinor Hamilton | 3, 5 | Announces Victoria line. | |
Highgate | Telent | Elinor Hamilton | Global | Northern line. |
Hillingdon | Telent | Elinor Hamilton | Global | Metropolitan and Piccadilly lines. |
Holborn | Telent | Elinor Hamilton | 1, 2, 3, 4 | Central and Piccadilly lines. Platform 5 (Piccadilly line Aldwych branch) is disused and hasn't been used since 1994. |
Holland Park | Telent | Elinor Hamilton | 1, 2 | Central line. |
Holloway Road | Telent | Elinor Hamilton | Global | Piccadilly line. |
Hornchurch | Telent | Elinor Hamilton | Global | District line. |
Hounslow Central | Telent | Elinor Hamilton | Global | Piccadilly line. |
Hounslow East | Telent | Elinor Hamilton | Global | Piccadilly line. |
Hounslow West | Telent | Elinor Hamilton | Global | Piccadilly line. |
Hyde Park Corner | Telent | Elinor Hamilton | Global | Piccadilly line. |
Ickenham | Telent | Elinor Hamilton | Global | Metropolitan and Piccadilly lines. |
Kennington | Telent | Elinor Hamilton | Global | Northern line. |
Kensal Green | Ditra | Emma | 1, 2 | Bakerloo line. CIS is managed by London Overground. |
Kensington Olympia | Telent | None | 1 | District line. No announcements. |
Atos | Anne | 2, 3 | London Overground and Southern. Anne replaced Emma in December 2023. | |
Kentish Town | Telent | None, previously Elinor Hamilton | Global | Northern line. Station is currently closed from 26th June 2023 until Summer 2024 due to major upgrade works. As a result of the closure, there are no announcements. Thameslink services are not affected. Phil announced left luggage. |
Kenton | Ditra | Emma | 1-2 | Bakerloo line. CIS is managed by London Overground. |
Kew Gardens | Ditra | Emma | Global | District line. CIS is managed by London Overground. |
Kilburn | Telent | Elinor Hamilton | Global | Jubilee line. |
Kilburn Park | Telent | Elinor Hamilton | Global | Bakerloo line. |
Kings Cross St Pancras | Telent | Elinor Hamilton | 3, 4, 5, 6, 7, 8 | Circle, Hammersmith & City, Metropolitan, Northern, Piccadilly and Victoria lines.
Elinor does not do train announcements on Platforms 1 and 2 (Circle, Hammersmith & City and Metropolitan lines). Phil does pickpockets. When there are disruptions on certain lines, Elinor says "Customer service update from the control room at Kings Cross" |
Kingsbury | Telent | Elinor Hamilton | Global | Jubilee line. |
Knightsbridge | Telent | Elinor Hamilton | Global | Piccadilly line. |
Ladbroke Grove | Telent | Elinor Hamilton | Global | Circle and Hammersmith & City lines. |
Lambeth North | Telent | Elinor Hamilton | Global | Bakerloo line. |
Lancaster Gate | Telent | Elinor Hamilton | Global | Central line. |
Latimer Road | Telent | Elinor Hamilton | Global | Circle and Hammersmith & City lines. |
Leicester Square | Telent | Elinor Hamilton | Global | Northern and Piccadilly lines. Phil does pickpockets. Piccadilly line platforms still say "Heathrow Terminal 1" even though its closed. |
Leyton | Telent | Elinor Hamilton | Global | Central line. |
Leytonstone | Telent | Elinor Hamilton | Global | Central line. |
Liverpool Street | Telent | Elinor Hamilton | 1, 2, 4, 5 | Central, Circle, Hammesmith & City and Metropolitin lines. Platform 3 (bay platform next to Platform 2) is disused. |
London Bridge | Telent | Elinor Hamilton | Global | Jubilee and Northern lines. |
Loughton | Telent | Elinor Hamilton | Global | Central line. Platforms 2 and 3 share the same track but on eastbound trains, doors open on Platform 3 while on westbound trains, doors open on Platform 2. |
Maida Vale | Telent | Elinor Hamilton | 1, 2 | Bakerloo line. |
Manor House | Telent | Elinor Hamilton | Global | Piccadilly line. |
Mansion House | Telent | Elinor Hamilton | 1, 3 | Circle and District lines. Platform 2 is disused. |
Marble Arch | Telent | Elinor Hamilton | Global | Central line. |
Marylebone | Telent | Elinor Hamilton | Global | Bakerloo line. |
Mile End | Telent | Elinor Hamilton | Global | Central, District and Hammersmith & City lines. |
Mill Hill East | Telent | Elinor Hamilton | Global | Northern line. Only one platform. Chimes used. Says "will arrive" instead of "will depart from Platform x" when announcing the next train. |
Moor Park | Telent | Elinor Hamilton | (1), (2), 3, 4 | Metropolitan line. Platforms 1 and 2 for fast services during peak hours as well as passing Chiltern Railways services. Platforms 3 and 4 for all-stations and semi-fast services. Chiltern Railways doesn't stop here. |
Moorgate | Telent | Elinor Hamilton | 1-4, 7-8 | 1-4 (Circle, Hammersmith & City and Metropolitan lines) and 7-8 (Northern line) are LU platforms, 5-6 have been disused since 2009. 9-10 are Great Northern platforms. Platforms 3 and 4 are rarely used. |
Atos | Anne | 9-10 | ||
Morden | Telent | Elinor Hamilton | (1), 2, 3, 4, 5 | Northern line. Platforms 1 and 2 share the same track but all doors open on Platform 2. Platforms 3 and 4 share the same track with doors opening on both Platforms. Platform 1 is disused. |
Mornington Crescent | Telent | Elinor Hamilton | Global | Northern line. |
Neasden | Telent | Elinor Hamilton | 2-3 | Jubilee line. Platforms 1 and 4 are disused Metropolitan line platforms which don't have any announcements. |
Newbury Park | Telent | Elinor Hamilton | Global | Central line. |
Nine Elms | Telent | Elinor Hamilton | Global | Northern line station which opened on 20th September 2021. |
North Acton | Telent | Elinor Hamilton | Global | Central line. |
North Ealing | Telent | Elinor Hamilton | Global | Piccadilly line. |
North Greenwich | Telent | Elinor Hamilton | 1, (2), 3 | Jubilee line. Platform 2 is rarely used. |
North Harrow | Telent | Elinor Hamilton | Global | Metropolitan line. |
North Wembley | Ditra | Emma | Global | Bakerloo line. CIS is managed by London Overground. |
Northfields | Telent | Elinor Hamilton | (1), 2, 3, (4) | Piccadilly line. Platforms 1 and 4 are rarely used. |
Northolt | Telent | Elinor Hamilton | Global | Central line. |
Northwick Park | Telent | Elinor Hamilton | Global | Metropolitan line. |
Northwood | Telent | Elinor Hamilton | Global | Metropolitan line. |
Northwood Hills | Telent | Elinor Hamilton | Global | Metropolitan line. |
Notting Hill Gate | Telent | Elinor Hamilton | 1, 2, 3, 4 | Central, Circle and District lines. |
Oakwood | Telent | Elinor Hamilton | Global | Piccadilly line. |
Old Street | Atos | Anne | 3-4 | Great Northern. |
Telent | Elinor Hamilton | 1-2 | Northern line. | |
Osterley | Telent | Elinor Hamilton | Global | Piccadilly line. |
Oval | Telent | Elinor Hamilton | Global | Northern line. |
Oxford Circus | Telent | Elinor Hamilton | Global | Bakerloo, Central and Victoria lines. |
Paddington | Telent | Elinor Hamilton | 1, 2, 3, 4 | Bakerloo, Circle, District and Hammersmith & City lines.
Platforms 1 and 2 - Circle and District lines via High Street Kensington. Platforms 3 and 4 - Bakerloo line. No Announcements on P15/16 for Circle & Hammersmith & City lines. Phil does pickpockets and left luggage. |
Park Royal | Telent | Elinor Hamilton | Global | Piccadilly line. |
Parsons Green | Telent | Elinor Hamilton | Global | District line. |
Perivale | Telent | Elinor Hamilton | Global | Central line. |
Piccadilly Circus | Telent | Elinor Hamilton | Global | Bakerloo and Piccadilly lines. Phil announces "Mind the Gap please" on Bakerloo line platforms. "<line> line" is not announced. |
Pimlico | Telent | Elinor Hamilton | Global | Victoria line. |
Pinner | Telent | Elinor Hamilton | Global | Metropolitan line. |
Plaistow | Telent | Elinor Hamilton | 1, 2, (3) | District and Hammersmith & City lines. Platform 3 is rarely used. |
Preston Road | Telent | Elinor Hamilton | Global | Metropolitan line. |
Putney Bridge | Telent | Elinor Hamilton | 1, 2 | District line. Platform 3 is disused. |
Queens Park | Ditra | Emma | 1-4 | Also announces Bakerloo line. Platforms 5 and 6 are disused. |
Queensbury | Telent | Elinor Hamilton | Global | Jubilee line. |
Queensway | Telent | Elinor Hamilton | Global | Central line. |
Ravenscourt Park | Telent | Elinor Hamilton | 1, 4 | District line. Platforms 2 and 3 are disused and are used by through Piccadilly line trains. No announcements play on Platforms 2 and 3. |
Rayners Lane | Telent | Elinor Hamilton | Global | Metropolitan and Piccadilly lines. |
Redbridge | iVENCS | Elinor Hamilton | Global | Central line. |
Regents Park | iVENCS | Elinor Hamilton | Global | Bakerloo line. |
Richmond | Atos | Anne | 1, 4-5, 6-7 | District line Platforms, Announcements programmed by SWR ATOS system. Station is managed by SWR.
Platforms 1 and 2 are SWR. Platforms 3 to 7 are District line and London Overground. District line mostly uses Platforms 6 and 7 but can use Platforms 4 and 5 and not Platform 3. |
Rodger | 2-3 | |||
Rickmansworth | Telent | Elinor Hamilton | Global | Metropolitan line. Does not announce Chiltern Railways. |
Roding Valley | Telent | Elinor Hamilton | Global | Central line. |
Royal Oak | Telent | Elinor Hamilton | Global | Circle and Hammersmith & City lines. |
Ruislip | Telent | Elinor Hamilton | Global | Metropolitan and Piccadilly lines. |
Ruislip Gardens | Telent | Elinor Hamilton | Global | Central line. |
Ruislip Manor | Telent | Elinor Hamilton | Global | Metropolitan and Piccadilly lines. |
Russell Square | Telent | Elinor Hamilton | Global | Piccadilly line. |
St James's Park | Telent | Elinor Hamilton | Global | Circle and District lines. |
St John's Wood | Telent | Elinor Hamilton | Global | Jubilee line. |
St Paul's | iVENCS | Elinor Hamilton | Global | Central line. |
Seven Sisters | Telent | Elinor Hamilton | 3, 5 | Victoria line. Platform 4 is used for occasional terminating trains. Platform 4 only has manual announcements. |
Atos | Anne | 1, 2 | London Overground Platforms. | |
Shepherd's Bush | Telent | Elinor Hamilton | Global | London Underground Central line Station/Platforms. |
Shepherd's Bush Market | Telent | Elinor Hamilton | Global | Circle and Hammersmith & City lines. |
Sloane Square | Telent | Elinor Hamilton | Global | Circle and District lines. |
Snaresbrook | Telent | Elinor Hamilton | Global | Central line. |
South Ealing | Telent | Elinor Hamilton | (1), 2, 3, (4) | Piccadilly line. Platforms 1 and 4 are rarely used. |
South Harrow | Telent | Elinor Hamilton | Global | Piccadilly line. |
South Kensington | Telent | Elinor Hamilton | Global | Circle, District and Piccadilly lines. |
South Kenton | Ditra | Emma | 1-2 | Bakerloo line. CIS is managed by London Overground. Island platform. |
South Wimbledon | Telent | Elinor Hamilton | Global | Northern line. |
South Woodford | Telent | Elinor Hamilton | Global | Central line. |
Southfields | Telent | Elinor Hamilton | Global | District line. |
Southgate | Telent | Elinor Hamilton | Global | Piccadilly line. |
Southwark | Telent | Elinor Hamilton | Global | Jubilee line. |
Stamford Brook | Telent | Elinor Hamilton | 1, 3 | District line. Platform 2 is disused and is used by through Piccadilly line trains. No announcements on Platform 2. |
Stanmore | Telent | Elinor Hamilton | Global | Jubilee line. |
Stepney Green | Telent | Elinor Hamilton | Global | District and Hammersmith & City lines. |
Stockwell | Telent | Elinor Hamilton | Global | Northern and Victoria lines. |
Stonebridge Park | Ditra | Emma | Global | Bakerloo line. CIS is managed by London Overground. |
Stratford | Atos | Anne | 1+2
5+8 9+10 10A+11 12 |
Elizabeth line, London Overground and Greater Anglia.
Anne replaced Emma on Platforms 1 and 2 (Overground) in September 2022. |
Telent | Elinor Hamilton | 13+14+15 | Jubilee line.
No announcements on Central line Platforms 3A, 3 and 6. Phil does Inspector Sands and evacuation. | |
Sudbury Hill | Telent | Elinor Hamilton | Global | Piccadilly line. |
Sudbury Town | Telent | Elinor Hamilton | Global | Piccadilly line. |
Swiss Cottage | Telent | Elinor Hamilton | Global | Jubilee line. |
Temple | Telent | Elinor Hamilton | Global | Circle and District lines. |
Theydon Bois | Telent | Elinor Hamilton | Global | Central line. |
Tooting Bec | Telent | Elinor Hamilton | Global | Northern line. |
Tooting Broadway | Telent | Elinor Hamilton | Global | Northern line. Phil says "Mind the gap please" |
Tottenham Court Road | Telent | Elinor Hamilton | 1, 2, 3, 4 | Central and Northern lines. |
Siemens | Emma | A+B | Elizabeth line. Opened 24th May 2022. | |
Tottenham Hale | Telent | Elinor Hamilton | Global | Victoria line. |
Totteridge & Whetstone | Telent | Elinor Hamilton | Global | Northern line. |
Tower Hill | Telent | Elinor Hamilton | Global | Circle and District lines. |
Tufnell Park | Telent | Elinor Hamilton | Global | Northern line. Display on Platform 1 (Northbound platform) is still broken 04/10/2023. |
Turnham Green | Telent | Elinor Hamilton | 1, (2), (3), 4 | District and Piccadilly lines.
Platforms 1 and 4 - District line. Platforms 2 and 3 - Piccadilly line which only stops here after 2230 every evening and until 0650 (Mondays to Saturdays) or 0745 (Sundays) the following morning. This includes Night Tube on Fridays and Saturdays. |
Turnpike Lane | Telent | Elinor Hamilton | Global | Piccadilly line. |
Upminster | Telent | Elinor Hamilton | 3, 4, 5 | District line. |
Atos | Anne | (1A), 1, 2, 6 | Platforms 1A, 1 and 2 are C2C. Platform 6 is London Overground. Note that this station is managed by C2C. Platform 1A is rarely used. | |
Upminster Bridge | Telent | Elinor Hamilton | Global | District line. |
Upney | Telent | Elinor Hamilton | Global | District line. |
Upton Park | Telent | Elinor Hamilton | Global | District and Hammersmith & City lines. |
Uxbridge | Telent | Elinor Hamilton | 1, (2), 3, 4 | Metropolitan and Piccadilly lines. Platforms 2 and 3 share the same track but all doors open on Platform 3. |
Vauxhall | Telent | Elinor Hamilton | Global | Victoria line. |
Victoria | iVENCS | Elinor Hamilton | Global | Circle, District and Victoria lines.
Phil Announces 'Mind the Gap please'. |
Walthamstow Central | Telent | Elinor Hamilton | Global | Victoria line. |
Wanstead | iVENCS | Elinor Hamilton | Global | Central line. |
Warren Street | Telent | Elinor Hamilton | Global | Northern and Victoria lines. |
Warwick Avenue | Telent | Elinor Hamilton | Global | Bakerloo line. |
Waterloo | Telent | Elinor Hamilton | Global | Bakerloo, Jubilee, Northern and Waterloo & City lines.
Phil announces "Mind the Gap please" on Bakerloo and Waterloo & City lines Platforms 3, 4, 25 and 26. Elinor incorrectly announces "Please stand back from the platform edge doors" on Bakerloo line platforms 3 and 4, although there aren't any. Also Elinor doesn't announce Waterloo & City line trains on Platforms 25 and 26. |
Watford | Telent | Elinor Hamilton | Global | Metropolitan line. |
Wembley Central | Ditra | Emma | Global | Also announces Bakerloo line.
P1/2 for Bakerloo line and London Overground. P3/4 are not used as they are the fast lines for Avanti/WMT services. P5/6 for stopping Southern services (can only fit 7 coaches). |
Wembley Park | Telent | Elinor Hamilton | (1), 2, 3, 4, 5, (6) | Jubilee and Metropolitan lines.
Platforms 1 and 6 - Metropolitan line fast and semi-fast Platforms 2 and 5 - Metropolitan line all-stations Platforms 3 and 4 - Jubilee line |
West Acton | Telent | Elinor Hamilton | Global | Central line. |
West Brompton | Telent | Elinor Hamilton | 1, 2 | District line. |
Atos | Anne | 3, 4 | London Overground and Southern. Anne replaced Emma in December 2023. | |
West Finchley | Telent | Elinor Hamilton | Global | Northern line. |
West Ham | Telent | Elinor Hamilton | 1-2 | District and Hammersmith & City lines. |
iVENCS | None / Manual | 3-4 | DLR Platforms, formerly Silverlink on the North London Line platforms previously voiced by Anne. | |
Telent | Elinor Hamilton | 5-6 | Jubilee line. | |
Atos | Anne | 7-8 | c2c Platforms. | |
West Hampstead | Telent | Elinor Hamilton | Global | Not to be confused with West Hampstead Thameslink or West Hampstead Overground.
Jubilee line. |
West Harrow | Telent | Elinor Hamilton | Global | Metropolitan line. |
West Kensington | Telent | Elinor Hamilton | Global | District line. |
Westbourne Park | Telent | Elinor Hamilton | Global | Circle and Hammersmith & City lines. |
Westminster | Telent | Elinor Hamilton | Global | Circle, District and Jubilee lines. |
White City | Telent | Elinor Hamilton | Global | Central line. Platforms 2 and 3 share the same track but on westbound trains, the doors open on Platform 2 while on eastbound trains, the doors open on Platform 3. |
Whitechapel | Telent | Elinor Hamilton | 1, 2 | District and Hammersmith & City lines. Platforms 3 and 4 were removed in 2010. |
Siemens | Emma | A+B | Elizabeth line. Opened 24th May 2022. | |
Atos | Anne | 5, 6 | London Overground. Anne replaced Emma in May 2020. | |
Willesden Green | Telent | Elinor Hamilton | 2-3 | Jubilee line. Platforms 1 and 4 are disused Metropolitan line platforms which don't have any announcements. |
Willesden Junction | Atos | Anne | 1-3, 4-5 | Bakerloo line. CIS is managed by London Overground. Anne replaced Emma in December 2023.
P1+3 are for Bakerloo line services and London Overground services to Euston and Watford, Platform 2 is a bay platform sometimes used by terminating Overground services from Euston or Stratford. P4+5 - North London line London Overground platforms for services to Stratford, Richmond and Clapham Junction. |
Wimbledon | Telent | Elinor Hamilton | 1-4 | Announces District line. Note that this station is managed by SWR. |
Atos | Anne | 5-6, 9 | SWR Platforms. Chimes used. Rodger announces “Mind The Gap” on Platforms 5 - 9.
Anne and Rodger do fast train announcements on Platforms 6 and 7 only. Services to Alton & Basingstoke stop at Platforms 6 & 7 on Sundays for Wimbledon tennis championship. Platform 9 is used by Thameslink. Platforms 10a-10b are used by Tramlink services and have no announcements. | |
Rodger | 7-8 | |||
Wimbledon Park | Telent | Elinor Hamilton | Global | District line. |
Wood Green | Telent | Elinor Hamilton | Global | Piccadilly line. |
Wood Lane | Telent | Elinor Hamilton | Global | Circle and Hammersmith & City lines. |
Woodford | Telent | Elinor Hamilton | (1), 2, 3 | Central line. Platform 1 is rarely used. |
Woodside Park | Telent | Elinor Hamilton | Global | Northern line. |
Northern stations[]
Northern have released information regarding which stations were due to be receiving automated announcements in the near as part of a FOI request[3]. Their current contract with KeTech was due to expire in January 2023.
Station | System | Voice | Platforms | Notes |
---|---|---|---|---|
Adwick | KeTech | Celia | Global | |
Allens West | KeTech KeAddress | Celia | Global | |
Alnmouth | KeTech | Celia | Global | Mainly served by CrossCountry, LNER and Transpennine Express.
Only 4 Northern services a day. |
Altrincham | KeTech | Manual | Global | Currently only has manual announcements. Automated announcements are planned to be introduced at this station in 2024. |
Apperley Bridge | KeTech | Celia | 1, 2 | |
Appleby | KeTech | Celia | Global | CIS screens were installed in 2019, only CIS screen and speakers were activated on Platform 2 as Network Rail had to find ways to get wires across to the other side of the track, in October/November 2023 the CIS screen and speakers on Leeds bound platform was activated. The CIS screen was replaced due to the original one not been in use and was filled with water making the screen water damaged and not being safe to use. According to Today's Railways December 2023 Issue. |
Appley Bridge | KeTech | Celia | Global | Announcements are very quiet due to houses nearby. |
Ashburys | KeTech | Celia | Global | |
Ashton-under-Lyne | KeTech | Celia | Global | New Inotec Screens installed in 2023. |
Atherton | KeTech | Celia | Global | Celia replaced Anne. TFT displays installed in December 2022, in a different location than the older ones (the old boards were mounted under a platform sign on the station roof but the new ones are on a new post in the middle of the platforms) |
Bamber Bridge | KeTech | Celia | Global | Announcements can be heard but are very quiet. Has staggered platforms, platform length 2 carriages |
Bamford | KeTech | Celia | Global | |
Bardon Mill | KeTech KeAddress | Celia | Global | |
Bare Lane | KeTech | Celia | 1, 2 | Platform 1 is the main platform
Platform 2 is used for Heysham trains or in peak times |
Barnsley | KeTech | Celia | Global | |
Barrow-In-Furness | KeTech | Celia | Global | Celia replaced Rob in 2017. |
Batley | KeTech | Celia | Global | Announcements are faulty.
Will not announce a stopping service if a service is passing at the same time. Fast train announcements do not mention a platform number. |
Bentley (South Yorkshire) | KeTech | Celia | Global | |
Beverley | KeTech | Celia | Global | |
Billingham | KeTech KeAddress | Celia | Global | |
Bingley | KeTech KeAddress | Celia | Global | |
Birchwood | KeTech | Celia | Global | |
Bishop Auckland | KeTech KeAddress | Celia | 1 | |
Blackburn | KeTech | Manual | Global | A BR-era chime is played before each announcement. |
Blackpool North | KeTech | Celia | Global | Announcements in the concourse are very quiet. Announcements on the platforms are slightly louder although only the speakers at platform 6 play announcements.
ASL 2-note chime interrupts the start of all automated announcements TOC is not announced for Avanti services. Celia replaced Only Woman in 2016. Announcements broke January 2024. |
Blackpool South | KeTech | Celia | 1 | Only one platform |
Blackrod | KeTech | Celia | Global | Platform length 5 carriages long |
Blaydon | KeTech KeAddress | Celia | Global | |
Bolton | KeTech | Celia | Global | Celia replaced manual announcements in January 2023, announcements play in the booking office and the footbridge. The information screens in the bus station also show train departures.
The boards on platforms 1 and 3 were replaced with LCD Infotec screens in early January 2023 but later on platforms 4 and 5. Platform 2 does not have a board due to the platform only being used during engineering works and for stabling The announcement speakers are original from when the station used manual announcements. The chime before each announcement has been removed except for manual announcements. |
Bolton-Upon-Dearne | MicroPA | Acapela Rachel | 1,2 | Train announcements include the time of arrival at each calling point after the calling point is announced (e.g. Goldthorpe 13:46, Thurnscoe 13:48, Moorthorpe 13:54 etc.) |
Bradford Forster Square | KeTech KeAddress | Celia | Global | Announcements either broken or disabled as of 31/8/2020. |
Bradford Interchange | KeTech
KeAddress |
Celia | Global | Announcements are very quiet due to the continued use of old speakers |
Bramley (West Yorkshire) | KeTech | Celia | Global | |
Brampton (Cumbria) | KeTech KeAddress | Celia | Global | |
Bridlington | KeTech | Celia | Global | |
Brinnington | MicroPA | Acapela Rachel | 1,2 | Train announcements include the time of arrival at each calling point after the calling point is announced (e.g. Bredbury 13:35, Romiley 13:38, Marple 13:42 etc.) |
Broad Green | KeTech | Celia | Global | |
Broadbottom | KeTech | Celia | Global | |
Bryn | KeTech | Celia | Global | Celia was installed sometime in 2023. |
Buckshaw Parkway | KeTech | Celia | Global | New White Infotec Screens arrived in September 2023 |
Burley Park | KeTech KeAddress | Celia | Global | |
Burnley Central | KeTech | Celia | 1 | Platform length 2 carriages long |
Burnley Manchester Road | KeTech | Celia | Global | |
Burscough Bridge | MicroPA | Acapela Rachel | 1, 2 | |
Carnforth | KeTech | Celia | Global | Announcements broken/disabled |
Castleford | KeTech | Celia | 1 | Only one platform in use. Has Infotec's New TFT Displays. |
Castleton | KeTech | Celia | Global | |
Chapeltown | KeTech | Celia | Global | |
Cheadle Hulme | KeTech | Celia | Global | |
Chinley | KeTech | Celia | Global | |
Chorley | KeTech | Celia | Global | Silver screens installed |
Church Fenton | KeTech KeAddress | Celia | Global | Announcements are broken |
Clapham (North Yorkshire) | KeTech | Celia | Global | irregular service |
Colne | KeTech | Celia | 1 | |
Cononley | KeTech | Celia | Global | Only a 1 speaker works on each platform |
Conisbrough | KeTech | Celia | Global | Celia installed at this station in 2023. |
Cottingham | KeTech | Celia | Global | Silver screens installed |
Cottingley | KeTech | Celia | Global | |
Corbridge | KeTech KeAddress | Celia | Global | |
Cramlington | MicroPA | Acapela Rachel | 1, 2 | Announcements not working. |
Daisy Hill | KeTech KeAddress | Celia | Global | Silver Infotec CIS screens installed on the platforms and TFT screen installed in the concourse in late October 2022
A new speaker was installed above the board on platform 2 however trains are announced through both speakers and the platform 2 speaker has higher sound quality Services are also announced in the concourse. |
Darnall | KeTech
KeAddress |
Celia | Global | |
Davenport | KeTech | Celia | Global | Platform length 5 carriages |
Deighton | KeTech | Celia | Global | |
Deansgate | KeTech | Celia | Global | Celia replaced Anne |
Denby Dale | KeTech
KeAddress |
Celia | 1 | |
Dinsdale | KeTech KeAddress | Celia | Global | |
Dinting | KeTech | Celia | Global | |
Dore & Totley | KeTech | Celia | 1, 2 | New Platform 1 opened on 25th March 2024. Original P1 became P2.
Rachel was to continue at this station but was upgraded recently to Celia. Celia does not announce operator "Northern" or carriage formation at this station. |
Driffield | KeTech | Celia | Global | |
Dronfield | MicroPA | Acapela Rachel | 1, 2 | |
Dunston | KeTech KeAddress | Celia | Global | |
Earlestown | KeTech | Celia | Global | |
East Didsbury | KeTech | Celia | Global | Platform length 5 carriages |
Eaglescliffe | KeTech KeAddress | Celia | Global | |
Eccles | KeTech | Celia | Global | Celia replaced Anne |
Edale | KeTech | Celia | Global | Celia replaced Anne |
Edge Hill | KeTech | Celia | Global | Celia replaced Anne |
Farnworth | KeTech | Celia | Global | Celia replaced Anne.
Announcements are faulty, only announces fast/passing trains on platform 2. Fast train announcements do not get mentioned on the other platform. |
Featherstone | KeTech KeAddress | Celia | Global | |
Ferriby | KeTech | Celia | Global | |
Filey | KeTech | Celia | Global | |
Fitzwilliam | KeTech | Celia | 2, (1) | Speaker for Both Platforms is only on P2 (Leeds Platform) |
Frizinghall | KeTech | Celia | Global | |
Flimby | KeTech | Celia | Global | Celia installed in 2022. |
Flowery Field | KeTech | Celia | Global | |
Furness Vale | KeTech | Celia | Global | |
Garforth | KeTech KeAddress | Celia | Global | |
Gatley | KeTech KeAddress | Celia | Global | |
Glasshoughton | KeTech | Celia | Global | |
Gilberdyke | KeTech | Celia | Global | |
Giggleswick | KeTech | Celia | Global | |
Glossop | KeTech | Celia | Global | |
Godley | KeTech | Celia | Global | |
Goole | KeTech | Celia | Global | |
Grange-Over-Sands | KeTech | Celia | Global | Celia replaced Rob |
Greenfield | KeTech | Manual | Global | Only served by TPE. |
Grindleford | KeTech | Celia | Global | |
Guiseley | KeTech | Celia | Global | |
Gypsy Lane | KeTech
KeAddress |
Celia | Global | |
Hadfield | KeTech
KeAddress |
Celia | 1 | Only one platform |
Hag Fold | KeTech KeAddress | Celia | Global | |
Hale | KeTech | Celia | Global | |
Halewood | KeTech | Celia | Global | |
Halifax | KeTech KeAddress | Celia | Global | |
Haltwhistle | KeTech KeAddress | Celia | Global | |
Hammerton | KeTech | Celia | Global | Celia installed in 2023. |
Harrogate | KeTech KeAddress | Celia | Global | Old Davenport projector speakers still in situ but no longer in use |
Hartlepool | KeTech KeAddress | Celia | Global | |
Hatfield & Stainforth | KeTech | Celia | Global | All announcements are announced out of the only speaker on Platform 1 (Doncaster Platform) |
Hathersage | KeTech | Celia | Global | |
Hattersley | KeTech | Celia | Global | |
Haydon Bridge | KeTech KeAddress | Celia | Global | |
Hazel Grove | KeTech | Celia | Global | |
Heald Green | KeTech | Celia | Global | |
Heaton Chapel | KeTech | Celia | Global | |
Hebden Bridge | KeTech | Celia | Global | |
Heighington | KeTech KeAddress | Celia | Global | |
Hellifield | KeTech | Celia | Global | |
Hessle | KeTech | Celia | Global | |
Heworth | KeTech KeAddress | Celia | Global | |
Hexham | KeTech KeAddress | Celia | Global | |
Heysham Port | KeTech | Celia | 1 | Only one platform. Station is not publicly accessible by foot. |
Hindley | KeTech | Celia | Global | |
Hope (Derbyshire) | KeTech | Celia | Global | |
Horden (Peterlee) | KeTech
KeAddress |
Celia | Global | New White writing LEDs screens. |
Hornbeam Park | KeTech | Celia | Global | |
Horsforth | KeTech | Celia | Global | |
Hough Green | KeTech | Celia | Global | |
Hunmanby | KeTech | Celia | Global | |
Hutton Cranswick | KeTech | Celia | Global | |
Huyton | KeTech | Celia | Global | Celia replaced Anne in about 2018. Announcements either broken or disabled. Platform length 3 carriages |
Hyde North | KeTech | Celia | Global | |
Ilkley | KeTech KeAddress | Celia | Global | Announcements not working as of 31/8/2020. |
Irlam | KeTech
KeAddress |
Celia | Global | |
James Cook University Hospital | KeTech
KeAddress |
Celia | Global | |
Keighley | KeTech KeAddress | Celia | Global | Platforms 3/4 - Keighley & Worth Valley Railway |
Kendal | KeTech | Celia | Global | |
Kirkby Stephen | KeTech | Celia | Global | |
Kirkham & Wesham | KeTech
KeAddress |
Celia | Global | |
Kirkstall Forge | KeTech | Celia | Global | |
Kiveton Bridge | KeTech | Celia | Global | |
Kiveton Park | KeTech | Celia | Global | |
Knaresborogh | KeTech | Celia | Global | Celia installed in 2023. |
Lea Green | KeTech | Celia | Global | |
Levenshulme | KeTech | Celia | Global | |
Leyland | KeTech | Celia | Global | Anne was installed in 2018 but was replaced by Celia only a few months afterwards. Speaker labelled "LEY/PA/S-P/3/025" disabled due to noise complaints from neighbours. White Infotec screens installed November 2022. |
Long Preston | KeTech | Celia | Global | |
Longbeck | KeTech KeAddress | Celia | Global | |
Low Moor | KeTech KeAddress | Celia | Global | |
Manchester Oxford Road | KeTech | Celia | Global | Celia replaced Anne in December 2019,
TOC not announced for EMR or TfW services. Announcements are sometimes hard to hear. |
Manchester Victoria | KeTech | Celia | Global | Manual announcements replaced by Anne in 2014 then Celia on 6/8/2019. |
Marple | KeTech | Celia | Global | |
Marske | KeTech KeAddress | Celia | Global | |
Marton | KeTech KeAddress | Celia | Global | |
Marsden | KeTech | Celia | Global | Only served by TPE. |
Maryport | KeTech | Celia | Global | |
Meadowhall | KeTech KeAddress | Celia | Global |
Celia replaced Phil (KeTech) in 2016/2017. Was formerly the only non-Chiltern station to have KeTech Phil. |
MetroCentre | KeTech KeAddress | Celia | Global | |
Mexborough | KeTech KeAddress | Celia | Global | |
Millom | KeTech | Celia | Global | |
Mirfield | KeTech | Celia | Global | |
Morley | KeTech | Celia | Global | New station relocated and opened in May 2023, old Infotec screens were reinstalled at the new station, additional new Infotec white writing screens were installed. |
Morpeth | KeTech | Celia | Global | "Only Woman" announces "Lumo" TOC name. |
Mossley | KeTech
KeAddress |
Celia | Global | Only served by TPE. |
Mossley Hill | KeTech
KeAddress |
Celia | Global | |
Northwich | KeTech | Celia | Global | |
North Road | KeTech KeAddress | Celia | Global | |
New Pudsey | KeTech | Celia | Global | |
New Mills Central | KeTech | Celia | Global | Celia replaced Anne. |
New Mills Newtown | KeTech | Celia | Global | |
Newton-le-Willows | KeTech | Celia | Global | Celia replaced Anne. |
Newton Aycliffe | KeTech KeAddress | Celia | Global | |
Newton for Hyde | KeTech | Celia | Global | |
Normanton | KeTech | Celia | Global | |
Nunthorpe | KeTech KeAddress | Celia | Global | |
Outwood | KeTech KeAddress | Celia | Global | |
Padgate | KeTech | Celia | Global | The announcements sound muffled and are very hard to hear. |
Parton | KeTech | Celia | Global | |
Penistone | KeTech
KeAddress |
Celia | Global | |
Poppleton | KeTech | Celia | Global | Celia was installed in 2023 along with new Infotec screens. |
Pontefract Monkhill | KeTech
KeAddress |
Celia | Global | |
Pontefract Tanshelf | KeTech KeAddress | Celia | Global | |
Poulton-le-Fylde | KeTech | Celia | Global | |
Prescot | KeTech | Celia | Global | |
Prudhoe | KeTech KeAddress | Celia | Global | |
Rainhill | KeTech | Celia | Global | |
Redcar Central | KeTech KeAddress | Celia | Global | |
Redcar East | KeTech KeAddress | Celia | Global | |
Riding Mill | KeTech KeAddress | Celia | Global | |
Roby | KeTech | Celia | Global | Platform length 3 carriages long. |
Rochdale | KeTech | Celia | Global | Platform 2 not in use. |
Romiley | KeTech | Celia | Global | |
Rotherham Central | KeTech KeAddress | Celia | Global | Stand Clear Announced for P1/2 when Supertram Passes, P3/4 stand clear announced when National Rail train passes.
2 announcements per train. Platform 1/2 National Rail. Platform 3/4 Supertram. |
Ruswarp | KeTech | Celia | 1 | Only has one platform |
Salford Central | KeTech | Celia | Global | Celia replaced Anne in 2019.
Orange LED boards were initially installed on the platforms during the refurbishment in 2023 (as a new canopy was installed), however they were replaced with white Infotec LED screens just weeks later. The boards in the concourse (both outside the platform ramps and near the gateline) are still original from before the refurbishment. Two double-sided boards per platform. This station has a weird information system. There is a long pause between the station and formation announcements, and the boards say "This train consists of (x) carriages" instead of "A Northern service which has (x) carriages" like other Northern stations with the KeTech system. This may be a different variant of the KeTech system, a different system altogether or could just still be running on the software of the old boards. The old boards say "Please Note: Northern" out of context when displaying the TOC. The new boards say "Operated by: Northern" which usually shows for cancelled services. In the concourse, the boards do not show the terminus station on the list of calling points |
Salford Crescent | KeTech | Celia | Global | Celia replaced Anne in March 2019; announcements speakers echo.
"Service currently at/between" message is skipped on location of delayed service announcements, resulting in station names being announced out of context |
Saltburn | KeTech KeAddress | Celia | Global | |
Sandbach | MicroPA | Acapela Rachel | 1, 2, 3 | |
Sankey for Penketh | KeTech | Celia | Global | Announcements disabled as of 2019 due to the station getting a reduced service because of Warrington West. |
Seaham | KeTech KeAddress | Celia | Global | |
Seaton Carew | KeTech KeAddress | Celia | Global | |
Shildon | KeTech KeAddress | Celia | Global | |
Shipley | KeTech KeAddress | Celia | Global | Phil replaced by Celia in late 2014. |
Skipton | KeTech KeAddress | Celia | Global | Announcements either broken or disabled. |
Slaithwaite | KeTech | Celia | Global | Fast train announcements don't include the platform number. Only served by TPE. |
South Bank (Middlesbrough) | KeTech KeAddress | Celia | Global | |
South Elmsall | KeTech KeAddress | Celia | Global | |
Sowerby Bridge | KeTech | Celia | Global | |
Starbeck | KeTech | Celia | Global | Celia installed in 2023. |
Staveley | KeTech | Celia | Global | Platform length 2 carriages |
Stocksfield | KeTech KeAddress | Celia | Global | |
Stockton | KeTech KeAddress | Celia | Global | |
Sunderland | KeTech KeAddress | Celia | Global | Platforms shared with Tyne and Wear Metro, Celia only announces principal/National Rail stations for Metro.
Celia replaced Phil (KeTech) one of few stations to have had non-Chiltern Railways Phil. Chimes was used until 2019. |
St Helens Central | KeTech | Celia | Global | |
St Helens Junction | KeTech | Celia | Global | |
Swinton (Greater Manchester) | KeTech
KeAddress |
Celia | Global | Infotec TFT information screens were installed on the platforms in December 2022, however due to vandalism they were replaced a second time with older style orange LED displays (like the ones before replacement) in Autumn 2023 |
Swinton (South Yorkshire) | KeTech KeAddress | Celia | Global | |
Thatto Heath | KeTech | Celia | Global | |
Thorne South | KeTech | Celia | Global | |
Todmorden | KeTech | Celia | Global | |
Ulleskelf | KeTech | Celia | Global | |
Ulverston | KeTech | Celia | Global | Celia replaced Rob |
Upholland | KeTech | Celia | Global | White Infotec LED screens installed at some point in 2022 |
Urmston | KeTech | Celia | Global | |
Wakefield Kirkgate | KeTech KeAddress | Celia | Global | There are no CIS screens on Platforms 2 and 3 since works began on that part of the platform since 2019. In 2022/23 the screens were put back up after work completed but the old orange Infotec ones. |
Walkden | KeTech | Celia | Global | New boards and PA system replaced Acapela Rachel in early December 2022. Announcements are faulty and do not play as of August 2023
The old announcements would not announce a service if it was not running to schedule, and would overlap if two trains were due at the same time (because the announcements were played through the individual boards on an island platform) |
Warrington Central | KeTech | Celia | Global | "Service currently at/between" message is skipped from on location of delayed service announcements, resulting in station names being announced out of context. |
Warrington West | KeTech | Celia | Global | |
Wavertree Technology Park | KeTech | Celia | Global | Celia replaced Anne. Platform length 3 carriages, |
Weeton | KeTech | Celia | Global | |
Wetheral | KeTech KeAddress | Celia | Global | |
West Allerton | KeTech
KeAddress |
Celia | Global | New Silver CIS screens installed. |
Westhoughton | KeTech | Celia | Global | Acapela Rachel was replaced in 2022 with a new PA system, along with new white Infotec CIS screens as the older boards would break constantly. |
Whaley Bridge | KeTech | Celia | Global | |
Whiston | KeTech | Celia | Global | |
Whitby | KeTech | Celia | 1 | Manual announcements on platform 2 (North Yorkshire Moors Railway platform) |
Widnes | KeTech | Celia | Global | Celia replaced Anne |
Wigan Wallgate | KeTech | Celia | Global | Silver screens installed |
Wilmslow | KeTech KeAddress | Celia | Global | Celia replaced Anne, announcements are faulty.
Appears to glitch out on certain lines such as "The ...xt train", "C...ing at", "A ...service of drinks", ".... well away from the edge of Platform 4! Th' approaching train is not scheduled to stop at this station!, and "...sorry to announce" also affects certain calling points such as "C..... Str....n" for Church Stretton and "B...n" for Burnage and also compensation ".. this delays in results etc." "..... visit northernrailway.co.uk/delayrepay". TOC is not announced for TfW services. |
Windermere | KeTech | Celia | 1 | Celia replaced Rob |
Woodhouse | KeTech
KeAddress |
Celia | Global | |
Woodsmoor | KeTech | Celia | Global | |
Worksop | KeTech KeAddress | Celia | Global | |
Wylam | KeTech KeAddress | Celia | Global |
Northern Ireland Railways[]
Northern Ireland Railways announcements are provided by Atos Anne. Does not announce coach formation. Instead announces "Please remain behind the yellow line until your train has come to a halt, and allow passengers to leave the train first before boarding." Anne has not recorded any stations in the ROI other than "Dundalk", "Drogheda" and "Dublin Connolly" nor has she recorded "Irish Rail" which means that the once a day early morning all stations stopper from Newry is not announced. Also, Anne announces Enterprise services as "Northern Ireland Railways" despite being a joint service.
Station | System | Voice | Platforms | Notes |
---|---|---|---|---|
Adelaide | Atos | Anne | Global | |
Antrim | Atos | Anne | Global | |
Ballycarry | Atos | Anne | 1 | Station has only one platform. |
Ballymena | Atos | Anne | Global | |
Ballymoney | Atos | Anne | Global | |
Balmoral | Atos | Anne | Global | |
Bangor (Northern Ireland) | Atos | Anne | 1-2, 3 | |
Bangor West | Atos | Anne | 1, 2 | |
Belfast Lanyon Place | Atos | Anne | Global | Announcements on concourse. |
Bellarena | Atos | Anne | Global | |
Botanic | Atos | Anne | Global | |
Carnalea | Atos | Anne | 1, 2 | |
Carrickfergus | Atos | Anne | 1, 2, (3) | Platform 3 is rarely used. |
Castlerock | Atos | Anne | 1 | Platform 2 is disused and has been closed since 2016. |
City Hospital | Atos | Anne | 1, 2 | |
Clipperstown | Atos | Anne | 1, 2 | |
Coleraine | Atos | Anne | Global | |
Cullybackey | Atos | Anne | Global | Station has only one platform. |
Cultra | Atos | Anne | Global | |
Derriaghy | Atos | Anne | Global | |
Derry/Londonderry | Atos | Anne | Global | |
Dhu Varren | Atos | Anne | Global | Station has only one platform. |
Downshire | Atos | Anne | Global | |
Dunmurry | Atos | Anne | 1, 2 | |
Finaghy | Atos | Anne | Global | |
Glynn | Atos | Anne | 1 | Station has only one platform. |
Great Victoria Street | Atos | Anne | Global | |
Greenisland | Atos | Anne | Global | |
Helen's Bay | Atos | Anne | Global | |
Hilden | Atos | Anne | Global | |
Holywood (Northern Ireland) | Atos | Anne | Global | |
Jordanstown | Atos | Anne | Global | |
Lambeg | Atos | Anne | Global | |
Larne Harbour | Atos | Anne | Global | |
Larne Town | Atos | Anne | Global | Station has only one platform. |
Lisburn | Atos | Anne | Global | |
Lurgan | Atos | Anne | Global | |
Magheramorne | Atos | Anne | Global | Station has only one platform. |
Marino | Atos | Anne | 1, 2 | |
Moira | Atos | Anne | Global | |
Mossley West | Atos | Anne | Global | Station has only one platform. |
Newry | Atos | Anne | 1, 2 | |
Portadown | Atos | Anne | Global | |
Portrush | Atos | Anne | Global | |
Poyntzpass | Atos | Anne | Global | |
Scarva | Atos | Anne | Global | |
Seahill | Atos | Anne | 1, 2 | |
Sydenham (Northern Ireland) | Atos | Anne | Global | |
Titanic Quarter | Atos | Anne | Global | |
Trooperslane | Atos | Anne | Global | |
University (Northern Ireland) | Atos | Anne | 1 | Station has only one platform. |
Whiteabbey | Atos | Anne | 1, 2 | |
Whitehed | Atos | Anne | 1, 2 | |
Yorkgate | Atos | Anne | Global |
ScotRail stations[]
There are 78 stations on the ScotRail network that do not have any automated announcements and they are Achanalt, Achnasheen, Achnashellach, Alness, Altnabreac, Ardgay, Ardlui, Arisaig, Arrochar & Tarbet, Attadale, Balmossie, Banavie, Barrhill, Barry Links, Beasdale, Beauly, Bridge of Orchy, Brora, Conan Bridge, Connel Ferry, Corpach, Corrur, Crianlarich, Culrain, Dalmally, Dingwall, Duirinish, Duncraig, Dunrobin Castle, Falls of Cruachan, Fearn, Forsinard, Fort William, Garelochhead, Garve, Georgemas Junction, Girvan, Glenfinnal, Golf Street, Golspie, Helensburgh Upper, Helmsdale, Invergordon, Invergowrie, Invershin, Kildonan, Kinbrace, Kyle of Lochalsh, Lairg, Loch Awe, Loch Eil Outward Bound, Lochailort, Locheilside, Lochluichart, Lockerbie, Mallaig, Maybole, Monifieth, Morar, Muir of Ord, Oban, Plockton, Rannoch, Rogart, Roy Bridge, Scotscalder, Spean Bridge, Springfield, Stranraer, Strathcarron, Stromeferry, Tain, Taynuilt, Thurso, Tulloch, Tyndrum Lower, Upper Tyndrum and Wick. Although Lockerbie is managed by ScotRail, it is only served by Avanti and TPE services.
Station | System | Voice | Platforms | Notes |
---|---|---|---|---|
Aberdeen | KeTech | Alison McKay | Global | Platforms 1 & 2 are not used. Platform 7 is rarely used. |
Aberdour | iVENCS | Scottish Female | Global | |
Addiewell | iVENCS | Scottish Female | Global | |
Arbroath | KeTech | Alison McKay | Global | |
Armadale | iVENCS | Scottish Female | 1, 2 | |
Airbles | iVENCS | Scottish Female | Global | |
Airdrie | iVENCS | Scottish Female | 1, 2 | |
Alexandria | iVENCS | Scottish Female | Global | Only one platform. |
Alexandra Parade | iVENCS | Scottish Female | 1, 2 | |
Alloa | KeTech | Alison McKay | 1, 2 | |
Anderston | iVENCS | Scottish Female | Global | |
Annan | iVENCS | Scottish Female | Global | Scottish Female replaced Alison McKay in February 2024. |
Anniesland | iVENCS | Scottish Female | 1, 2, 3 | |
Ardrossan Harbour | iVENCS | Scottish Female | 1 | Only one platform. Scottish Female replaced Alison McKay in February 2024. |
Ardrossan South Beach | iVENCS | Scottish Female | 1 | Only one platform. Scottish Female replaced Alison McKay in February 2024. |
Ardrossan Town | iVENCS | Scottish Female | 1 | Only one platform. Scottish Female replaced Alison McKay in February 2024. |
Argyle Street | iVENCS | Scottish Female | Global | |
Ashfield | iVENCS | Scottish Female | 1, 2 | |
Auchinleck | iVENCS | Scottish Female | Global | Scottish Female replaced Alison McKay in February 2024. |
Aviemore | KeTech | Alison McKay | 1, 2 | Platform 3 is used by Strathspey Railway, a Heritage Railway. |
Ayr | iVENCS | Scottish Female | Global | Scottish Female replaced Alison McKay in February 2024. |
Baillieston | iVENCS | Scottish Female | Global | |
Balloch | iVENCS | Scottish Female | Global | Only one platform. |
Barassie | iVENCS | Scottish Female | Global | Scottish Female replaced Alison McKay in February 2024. |
Bargeddie | iVENCS | Scottish Female | Global | |
Barnhill | iVENCS | Scottish Female | 1, 2 | |
Barrhead | iVENCS | Scottish Female | Global | |
Bathgate | iVENCS | Scottish Female | 1, 2 | |
Bearsden | iVENCS | Scottish Female | Global | |
Bellgrove | iVENCS | Scottish Female | Global | |
Bellshill | iVENCS | Scottish Female | 1, 2 | |
Bishopbriggs | iVENCS | Scottish Female | 1, 2 | |
Bishopton | iVENCS | Scottish Female | Global | |
Bogston | iVENCS | Scottish Female | Global | |
Blackridge | iVENCS | Scottish Female | 1, 2 | |
Branchton | iVENCS | Scottish Female | 1 | Only one platform. |
Blair Atholl | KeTech | Alison McKay | 1, 2 | |
Blairhill | iVENCS | Scottish Female | 1, 2 | |
Blantyre | iVENCS | Scottish Female | 1, 2 | Replaced Alison McKay. |
Bowling | iVENCS | Scottish Female | Global | |
Breich | iVENCS | Scottish Female | Global | |
Bridge of Allan | iVENCS | Scottish Female | Global | |
Bridgeton | iVENCS | Scottish Female | Global | Scottish Female has replaced Allison McKay as of July 2019. |
Broughty Ferry | KeTech | Alison McKay | Global | |
Brunstane | iVENCS | Scottish Female | 1 | Only one platform. |
Burnside | iVENCS | Scottish Female | Global | |
Burntisland | iVENCS | Scottish Female | Global | |
Busby | iVENCS | Scottish Female | Global | |
Caldercruix | iVENCS | Scottish Female | 1, 2 | |
Cambuslang | iVENCS | Scottish Female | Global | |
Camelon | iVENCS | Scottish Female | Global | |
Cameron Bridge | TBC | TBC | TBC | New station with 2 platforms expected to reopen during 2024 as part of the Levenmouth rail link. |
Cardonald | iVENCS | Scottish Female | Global | |
Cardenden | iVENCS | Scottish Female | Global | |
Cardross | iVENCS | Scottish Female | 1, 2 | |
Carfin | iVENCS | Scottish Female | Global | |
Carluke | iVENCS | Scottish Female | Global | |
Carmyle | iVENCS | Scottish Female | Global | |
Carnoustie | KeTech | Alison McKay | Global | |
Carrbridge | KeTech | Alison McKay | 1, 2 | |
Carstairs | iVENCS | Scottish Female | Global | |
Cartsdyke | iVENCS | Scottish Female | Global | |
Carntyne | iVENCS | Scottish Female | 1, 2 | |
Cathcart | iVENCS | Scottish Female | Global | |
Charing Cross (Glasgow) | iVENCS | Scottish Female | 1, 2 | |
Chatelherault | iVENCS | Scottish Female | 1 | Only one platform. Replaced Alison Mckay. |
Clarkston | iVENCS | Scottish Female | Global | |
Cleland | iVENCS | Scottish Female | Global | |
Clydebank | iVENCS | Scottish Female | Global | Previously Alison McKay |
Coatbridge Central | iVENCS | Scottish Female | Global | |
Coatbridge Sunnyside | iVENCS | Scottish Female | 1, 2 | |
Coatdyke | iVENCS | Scottish Female | 1, 2 | |
Corkerhill | iVENCS | Scottish Female | 1 | Platform 2 is disused. |
Cowdenbeath | iVENCS | Scottish Female | Global | |
Craigendoran | iVENCS | Scottish Female | 1 | |
Croftfoot | iVENCS | Scottish Female | Global | |
Crookston | iVENCS | Scottish Female | 1 | Only one platform. |
Crosshill | iVENCS | Scottish Female | Global | |
Crossmyloof | iVENCS | Scottish Female | Global | |
Croy | iVENCS | Scottish Female | Global | |
Cumbernauld | iVENCS | Scottish Female | Global | |
Curriehill | iVENCS | Scottish Female | Global | |
Cupar | iVENCS | Scottish Female | Global | |
Dalgety Bay | iVENCS | Scottish Female | Global | |
Dalmarnock | iVENCS | Scottish Female | Global | Scottish Female has replaced Alison McKay as of July 2019. |
Dalmuir | iVENCS | Scottish Female | Global | Scottish Female has replaced Alison McKay as of July 2019. |
Dalmeny | iVENCS | Scottish Female | Global | |
Dalreoch | iVENCS | Scottish Female | Global | |
Dalwhinnie | KeTech | Alison McKay | 1, 2 | |
Dalry | iVENCS | Scottish Female | Global | Scottish Female replaced Alison McKay in February 2024. |
Drem | iVENCS | Scottish Female | Global | |
Drumchapel | iVENCS | Scottish Female | Global | Scottish Female has replaced Alison McKay as of July 2019. |
Drumfrochar | iVENCS | Scottish Female | 1 | Only one platform. |
Drumgelloch | iVENCS | Scottish Female | 1, 2 | |
Drumry | iVENCS | Scottish Female | Global | Scottish Female has replaced Alison McKay as of July 2019. |
Duke Street (Glasgow) | iVENCS | Scottish Female | 1, 2 | |
Dumbarton East | iVENCS | Scottish Female | Global | Scottish Female has replaced Alison McKay as of July 2019. |
Dumbarton Central | iVENCS | Scottish Female | Global | |
Dumbreck | iVENCS | Scottish Female | 1, 2 | |
Dumfries | iVENCS | Scottish Female | Global | Scottish Female replaced Alison McKay in February 2024. |
Dunbar | iVENCS | Scottish Female | Global | The CIS system at this station used to be Atos and manual announcements only as this was previously managed by East Cost before ScotRail took over. |
Dunfermline City | iVENCS | Scottish Female | Global | |
Dunfermline Queen Margaret | iVENCS | Scottish Female | Global | |
Dunkeld & Birnam | KeTech | Alison McKay | 1, 2 | |
Dunlop | iVENCS | Scottish Female | Global | Scottish Female replaced Alison McKay in February 2024. |
Dunblane | iVENCS | Scottish Female | 1, 2, 3 | |
Dundee | KeTech | Alison McKay | Global | Announcements are muffled. |
Dyce | iVENCS | Scottish Female | 1, 2 | |
East Kilbride | iVENCS | Scottish Female | 1 | Only one platform. |
East Linton | iVENCS | Scottish Female | Global | Station reopened on 13th December 2023. |
Easterhouse | iVENCS | Scottish Female | 1, 2 | |
Edinburgh Gateway | iVENCS | Scottish Female | Global | Scottish Female replace Alison McKay in late 2010s. |
Edinburgh Park | iVENCS | Scottish Female | 1, 2 | |
Edinburgh Waverley | Atos Worldline | Karen Cunningham | 1-7, 8+9, 10-20 | Karen Cunningham replaced Juliet Donnache who was the previous voice. Note that this station is managed by Network Rail. |
Elgin | KeTech | Alison McKay | Global | |
Eskbank | iVENCS | Scottish Female | 1 | Only one platform. |
Exhibition Centre (Glasgow) | iVENCS | Scottish Female | Global | Alison replaced in 2019. |
Fairlie | iVENCS | Scottish Female | 1 | Only one platform. Scottish Female replaced Alison McKay in February 2024. |
Falkirk Grahamston | iVENCS | Scottish Female | Global | |
Falkirk High | iVENCS | Scottish Female | Global | |
Fauldhouse | iVENCS | Scottish Female | Global | |
Fort Matilda | iVENCS | Scottish Female | Global | |
Forres | KeTech | Alison McKay | Global | |
Galashiels | iVENCS | Scottish Female | 1 | Only one platform. |
Garrowhill | iVENCS | Scottish Female | 1, 2 | |
Garscadden | iVENCS | Scottish Female | Global | Scottish Female replaced Alison McKay in 2019. |
Gartcosh | iVENCS | Scottish Female | Global | |
Giffnock | iVENCS | Scottish Female | Global | |
Gilshochill | iVENCS | Scottish Female | Global | |
Glasgow Central | Atos Worldline | Karen Cunningham | 1-15 | Note that this station is managed by Network Rail.
Alison replaced by Scottish Female on the low level platforms in 2019. |
iVENCS | Scottish Female | 16-17 | ||
Glasgow Queen Street | Atos Worldline | Karen Cunningham | 1-7 | Karen replaced Manual announcements on high level platforms in early Summer 2014. The only station managed by ScotRail to have Atos system.
Alison McKay replaced on the low level platforms in August 2019. |
iVENCS | Scottish Female | 8, 9 | ||
Glengarnock | iVENCS | Scottish Female | Global | Scottish Female replaced Alison McKay in February 2024. |
Gleneagles | iVENCS | Scottish Female | Global | |
Glenrothes with Thornton | iVENCS | Scottish Female | Global | |
Gorebridge | iVENCS | Scottish Female | 1 | Only one Platform. |
Gourock | iVENCS | Scottish Female | Global | |
Greenock Central | iVENCS | Scottish Female | Global | |
Greenock West | iVENCS | Scottish Female | Global | |
Greenfaulds | iVENCS | Scottish Female | Global | |
Gretna Green | iVENCS | Scottish Female | Global | Scottish Female replaced Alison McKay in February 2024. |
Hairmyres | iVENCS | Scottish Female | 1 | Only one platform. |
Hamilton Central | iVENCS | Scottish Female | 1, 2 | Scottish Female replaced Alison McKay in 2019. |
Hamilton West | iVENCS | Scottish Female | 1, 2 | |
Hartwood | iVENCS | Scottish Female | Global | |
Hawkhead | iVENCS | Scottish Female | 1 | Only one platform. |
Haymarket | iVENCS | Scottish Female | 0-1, 2-3, 4 | Platform 0 is rarely used only used during engineering works, disruptions and peak time services. Announcements are made on footbridge, concourse and platforms. |
Helensburgh Central | iVENCS | Scottish Female | Global | |
Huntly | KeTech | Alison McKay | Global | |
High Street (Glasgow) | iVENCS | Scottish Female | Global | |
Hillfoot | iVENCS | Scottish Female | 1, 2 | |
Hillington East | iVENCS | Scottish Female | Global | |
Hillington West | iVENCS | Scottish Female | Global | |
Holytown | iVENCS | Scottish Female | Global | |
Howwood | iVENCS | Scottish Female | Global | Scottish Female replaced Alison McKay in February 2024. |
Hyndland | iVENCS | Scottish Female | Global | Scottish Female replaced Alison McKay in 2019. |
IBM | iVENCS | None, previously Scottish Female | N/A | Only one platform, station closed since 8th December 2018. |
Insch | KeTech | Alison McKay | Global | |
Inverkeithing | iVENCS | Scottish Female | Global | |
Inverkip | iVENCS | Scottish Female | 1 | Only one platform. |
Inverness Airport | KeTech | Alison McKay | Global | New station that opened on 2nd February 2023. |
Inverness | KeTech | Alison McKay | Global | |
Inverurie | KeTech | Alison McKay | Global | |
Irvine | iVENCS | Scottish Female | Global | Scottish Female replaced Alison McKay in February 2024. |
Johnstone | iVENCS | Scottish Female | Global | Scottish Female replaced Alison McKay in February 2024. |
Jordanhill | iVENCS | Scottish Female | Global | Scottish Female replaced Alison McKay in 2019. |
Keith | KeTech | Alison McKay | Global | Only one platform. |
Kelvindale | iVENCS | Scottish Female | 1 | Only one platform. |
Kennishead | iVENCS | Scottish Female | 1, 2 | |
Kilmarnock | iVENCS | Scottish Female | Global | Scottish Female replaced Alison McKay in February 2024. |
Kilmaurs | iVENCS | Scottish Female | Global | Scottish Female replaced Alison McKay in February 2024. |
Kilpartrick | iVENCS | Scottish Female | Global | |
Kinghorn | iVENCS | Scottish Female | Global | |
King's Park | iVENCS | Scottish Female | Global | |
Kingsknowe | iVENCS | Scottish Female | Global | |
Kingussie | KeTech | Alison McKay | 1, 2 | |
Kintore | KeTech | Alison McKay | 1, 2 | New station opened on 15th October 2020. New white LED CIS Screens. |
Kilwinning | iVENCS | Scottish Female | Global | Scottish Female replaced Alison McKay in February 2024. |
Kirkcaldy | iVENCS | Scottish Female | Global | |
Kirkconnel | iVENCS | Scottish Female | Global | Scottish Female replaced Alison McKay in February 2024. |
Kirkhill | iVENCS | Scottish Female | 1, 2 | |
Kirknewton | iVENCS | Scottish Female | Global | |
Kirkwood | iVENCS | Scottish Female | Global | |
Ladybank | iVENCS | Scottish Female | Global | |
Lanark | iVENCS | Scottish Female | Global | |
Langbank | iVENCS | Scottish Female | Global | |
Langside | iVENCS | Scottish Female | Global | |
Larbert | iVENCS | Scottish Female | Global | |
Largs | iVENCS | Scottish Female | 1 | Only one platform. Scottish Female replaced Alison McKay in February 2024. |
Larkhall | iVENCS | Scottish Female | 1, 2 | Replaced Alison McKay in 2019. |
Laurencekirk | KeTech | Alison McKay | Global | |
Lenzie | iVENCS | Scottish Female | Global | |
Leven | TBC | TBC | TBC | New station with 2 platforms expected to reopen during 2024 as part of the Levenmouth rail link. |
Leuchars | iVENCS | Scottish Female | Global | |
Lochgelly | iVENCS | Scottish Female | Global | |
Lochwinnoch | iVENCS | Scottish Female | Global | Scottish Female replaced Alison McKay in February 2024. |
Longniddry | iVENCS | Scottish Female | Global | |
Linlithgow | iVENCS | Scottish Female | Global | |
Livingston North | iVENCS | Scottish Female | 1, 2 | |
Livingston South | iVENCS | Scottish Female | 1, 2 | |
Markinch | iVENCS | Scottish Female | Global | |
Maryhill | iVENCS | Scottish Female | Global | |
Maxwell Park | iVENCS | Scottish Female | Global | |
Merryton | iVENCS | Scottish Female | Global | Repalced Alison McKay in 2019. |
Milliken Park | iVENCS | Scottish Female | Global | Scottish Female replaced Alison McKay in February 2024. |
Milngavie | iVENCS | Scottish Female | Global | |
Mosspark | iVENCS | Scottish Female | 1 | Only one platform. |
Montrose | KeTech | Alison McKay | Global | |
Motherwell | iVENCS | Scottish Female | Global | |
Mount Florida | iVENCS | Scottish Female | Global | |
Mount Vernon | iVENCS | Scottish Female | Global | |
Muirend | iVENCS | Scottish Female | Global | |
Musselburgh | iVENCS | Scottish Female | Global | |
Nairn | KeTech | Alison McKay | Global | |
Neilston | iVENCS | Scottish Female | Global | Platform 1 is for departures while Platform 2 is for arrivals (terminating trains). |
Newcraighall | iVENCS | Scottish Female | 1 | Only one platform. |
Newtongrange | iVENCS | Scottish Female | 1 | Only one platform. |
Newtonmore | KeTech | Alison McKay | 1 | Only one platform. |
Newton | iVENCS | Scottish Female | 1, 2 | |
New Cumnock | iVENCS | Scottish Female | Global | Scottish Female replaced Alison McKay in February 2024. |
Newton-on-Ayr | iVENCS | Scottish Female | Global | Scottish Female replaced Alison McKay in February 2024. |
Nitshill | iVENCS | Scottish Female | 1, 2 | |
North Berwick | iVENCS | Scottish Female | Global | Only one platform. |
North Queensferry | iVENCS | Scottish Female | Global | |
Paisley Canal | iVENCS | Scottish Female | 1 | Only one platform. |
Paisley Gilmour Street | iVENCS | Scottish Female | Global | Scottish Female replaced Alison McKay in February 2024. |
Paisley St James | iVENCS | Scottish Female | Global | |
Partick | iVENCS | Scottish Female | Global | Scottish Female replaced Alison McKay as of July 2019. |
Patterton | iVENCS | Scottish Female | Global | |
Perth | KeTech | Alison McKay | Global | |
Pitlochry | KeTech | Alison McKay | 1, 2 | |
Pollokshaws East | iVENCS | Scottish Female | Global | |
Pollolkshaws West | iVENCS | Scottish Female | Global | |
Pollokshields East | iVENCS | Scottish Female | Global | |
Pollokshields West | iVENCS | Scottish Female | Global | |
Polmont | iVENCS | Scottish Female | Global | |
Port Glasgow | iVENCS | Scottish Female | Global | |
Portlehen | KeTech | Alison McKay | Global | |
Possilpark & Parkhouse | iVENCS | Scottish Female | Global | |
Priesthill & Darnley | iVENCS | Scottish Female | Global | |
Prestonpans | iVENCS | Scottish Female | Global | |
Prestwick International Airport | iVENCS | Scottish Female | Global | Note that this station is managed by Glasgow Prestwick Airport while ScotRail manages the CIS.
Scottish Female replaced Alison McKay in February 2024. |
Prestwick Town | iVENCS | Scottish Female | Global | Scottish Female replaced Alison McKay in February 2024. |
Queen's Park (Glasgow) | iVENCS | Scottish Female | Global | |
Renton | iVENCS | Scottish Female | 1 | Only one platform. |
Reston | iVENCS | Scottish Female | Global | New station that reopened on 23rd May 2022. Although this station is managed by ScotRail, it is only served by LNER and TPE services. |
Robroyston | iVENCS | Scottish Female | Global | Station opened on 15th December 2019. |
Rosyth | iVENCS | Scottish Female | Global | |
Rutherglen | iVENCS | Scottish Female | Global | |
Saltcoats | iVENCS | Scottish Female | Global | Scottish Female replaced Alison McKay in February 2024. |
Sanquhar | iVENCS | Scottish Female | 1, 2 | Scottish Female replaced Alison McKay in February 2024. |
Scotstounhill | iVENCS | Scottish Female | Global | Scottish Female replaced Alison McKay in 2019. |
Shawfair | iVENCS | Scottish Female | 1, 2 | |
Shawlands | iVENCS | Scottish Female | Global | |
Shettleston | iVENCS | Scottish Female | Global | |
Shieldmuir | iVENCS | Scottish Female | Global | |
Shotts | iVENCS | Scottish Female | Global | |
Singer | iVENCS | Scottish Female | Global | Scottish Female has replaced Alison McKay as of July 2019. |
Slateford | iVENCS | Scottish Female | Global | |
Springburn | iVENCS | Scottish Female | 1, 2-3. 4 | |
South Gyle | iVENCS | Scottish Female | 1, 2 | |
Stepps | iVENCS | Scottish Female | Global | |
Stevenston | iVENCS | Scottish Female | Global | Scottish Female replaced Alison McKay in February 2024. |
Stewarton | iVENCS | Scottish Female | Global | Scottish Female replaced Alison McKay in February 2024. |
Stonehaven | KeTech | Alison McKay | Global | |
Stirling | iVENCS | Scottish Female | 2, 3+6-8, 9-10 | There is no Platform 1. Platforms 4-5 are disused. Platforms 7 & 8 are not used much on weekdays. |
Stow | iVENCS | Scottish Female | 1 | Only one platform. |
Summerston | iVENCS | Scottish Female | Global | |
Thornliebank | iVENCS | Scottish Female | Global | |
Thorntonhall | iVENCS | Scottish Female | 1 | Only one platform. |
Troon | iVENCS | Scottish Female | 1, 2 | Scottish Female replaced Alison McKay in February 2024. |
Tweedbank | iVENCS | Scottish Female | 1-2 | |
Uddingston | iVENCS | Scottish Female | 1, 2 | |
Uphall | iVENCS | Scottish Female | Global | |
Wallyford | iVENCS | Scottish Female | Global | |
Wemyss Bay | iVENCS | Scottish Female | Global | |
West Calder | iVENCS | Scottish Female | Global | |
West Kilbride | iVENCS | Scottish Female | 1 | Only one platform. Scottish Female replaced Alison McKay in February 2024. |
Westerhailes | iVENCS | Scottish Female | Global | |
Westerton | iVENCS | Scottish Female | 1, 2 | |
Whifflet | iVENCS | Scottish Female | 1, 2 | |
Whinhill | iVENCS | Scottish Female | 1 | Only one platform. |
Whitecraigs | iVENCS | Scottish Female | 1, 2 | |
Wishaw | iVENCS | Scottish Female | 1, 2 | |
Williamwood | iVENCS | Scottish Female | 1, 2 | |
Woodhall | iVENCS | Scottish Female | Global | |
Yoker | iVENCS | Scottish Female | Global | Scottish Female replaced Alison McKay in 2019. |
South Western Railway stations[]
Station | System | Voice | Platforms | Notes |
---|---|---|---|---|
Addlestone | Atos | Anne | 1 | |
Rodger | 2 | |||
Aldershot | Atos | Anne | 1 | |
Rodger | 2 | |||
Alton | Atos | Anne | Global | The Atos system had replaced the Ditra system in March 2019. |
Andover | Atos | Anne | 1 | New Infotec Silver Screens installed. No chimes and No "Mind the Gap announcement" on all platforms. |
Rodger | 2 | |||
Ascot | Atos | Anne | 1, 3 | |
Rodger | 2 | |||
Ash | Atos | Anne | 1 | |
Rodger | 2 | |||
Ashford (Surrey) | Atos | Anne | 1 | |
Rodger | 2 | |||
Ashurst New Forest | Atos | Anne | 1 | |
Rodger | 2 | |||
Ash Vale | Atos | Anne | 1 | The Atos system had replaced Ditra in early May 2019. |
Rodger | 2 | |||
Axminster | Atos | Anne | 2 | The Atos system had replaced the Ditra system in Mid-Late February 2019. |
Rodger | 1 | |||
Barnes | Atos | Anne | 1,4 | |
Rodger | 2-3 | |||
Barnes Bridge | Atos | Anne | 1 | |
Rodger | 2 | |||
Bagshot | Atos | Anne | 1 | Atos replaced Phil sometime in April 2019. |
Rodger | 2 | |||
Basingstoke | Atos | Anne | 1, 4-5 | Chimes used in all train announcements.
The Atos system had replaced the Ditra system on 27th March 2019. |
Rodger | 2-3 | |||
Beaulieu Road | Atos | Anne | 1 | |
Rodger | 2 | |||
Bedhampton | Atos | Anne | 1 | |
Rodger | 2 | |||
Bentley (Hampshire) | Atos | Anne | 1 | |
Rodger | 2 | |||
Berrylands | Atos | Anne | 1 | The Atos system had replaced the Ditra system in early May 2019. |
Rodger | 2 | |||
Bitterne | Atos | Anne | 1 | |
Rodger | 2 | |||
Bookham | Atos | Anne | 1 | |
Rodger | 2 | |||
Botley | Atos | Anne | 1 | |
Rodger | 2 | |||
Bournemouth | Atos | Anne | Global | Chimes used.
The Atos system had replaced the Ditra system in Jan-Feb 2019. Anne had replaced Rodger as the Global voice at the station in mid 2019. |
Bracknell | Atos | Anne | 1 | The Ditra system had been repalced by Atos in April 2019. |
Rodger | 2 | |||
Branksome | Atos | Anne | 1 | |
Rodger | 2 | |||
Brentford | Atos | Anne | 1 | |
Rodger | 2 | |||
Brockenhurst | Atos | Anne | 1-2 | No chimes.
Bridge link audio depends on which side of the bridge is on. (The side above Platform 1-2 is in Anne's voice and the other side is in Rodger's voice). New Infotec Silver Screens installed. |
Rodger | 3-4 | |||
Brookwood | Atos | Anne | Global | |
Bursledon | Atos | Anne | Global | |
Byfleet & New Haw | Atos | Anne | 1 | |
Rodger | 2 | |||
Camberley | Atos | Anne | 1 | |
Rodger | 2 | |||
Chandler's Ford | Atos | Anne | Global | Only one platform. |
Chertsey | Atos | Anne | 1 | |
Rodger | 2 | |||
Chessington North | Atos | Anne | 1 | |
Rodger | 2 | |||
Chessington South | Atos | Anne | 1 | Platform 2 is disused. |
Chiswick | Atos | Anne | 1 | One of the First 5 SWR stations to use the Atos system. New Infotec Silver Screens installed. |
Rodger | 2 | |||
Christchurch | Atos | Anne | Global | |
Clandon | Atos | Anne | 1 | |
Rodger | 2 | |||
Claygate | Atos | Anne | 1 | |
Rodger | 2 | |||
Cosham | Atos | Anne | 1 | |
Rodger | 2 | |||
Cranbrook | Atos | Anne | Global | Only one platform. |
Crewkerne | Atos | Anne | 2 | |
Rodger | 1 | |||
Datchet | Atos | Anne | 1 | |
Rodger | 2 | |||
Dean | MicroPA | Acapela Rachel | 1, 2 | Anne voices the "Next Train" button at this station. Dean was transferred from GWR to SWR on 1st of April 2020.
New White Infotec Screens. |
Dorchester South | Atos | Anne | 1 | |
Rodger | 2 | |||
Earley | Atos | Anne | 2 | Atos replaced Ditra in April 2019. |
Rodger | 1 | |||
Earlsfield | Atos | Anne | 1-2 | One of the three last stations to be replaced by Atos.
Times are not announced on Waterloo bound trains. Anne only announces Fast Train announcements on Platfom 1 The Atos system had replaced the Ditra system on 21-5-2019. |
Rodger | 3 | |||
Eastleigh | Atos | Anne | 1 | Chimes used.
Bridge link and ticket hall audio is by both voices, appropriate for the service announced. |
Rodger | 2-3 | |||
Effingham Junction | Atos | Anne | 1 | |
Rodger | 2 | |||
Egham | Atos | Anne | 1 | |
Rodger | 2 | |||
Esher | Atos | Anne | 1 | Platforms 2-3 are disused. |
Rodger | 4 | |||
Ewell West | Atos | Anne | 1 | |
Rodger | 2 | |||
Farnham | Atos | Anne | Global | One of the First 5 SWR stations to use the Atos system. No chimes. New Infotec Silver Screens installed. |
Fareham | Atos | Anne | 1 | Atos replaced Ditra in April 2019.
1 new Silver Infotec Screen has been installed. |
Rodger | 3 | |||
Farnborough
(Main) |
Atos | Anne | 1 | No chimes. New Infotec Silver Screens installed.
Atos replaced Ditra in Jan-Feb 2019. |
Rodger | 2 | |||
Feltham | Atos | Anne | 1 | |
Rodger | 2 | |||
Feniton | Atos | Anne | Global | Only one platform. |
Fleet | Atos | Anne | 1 | |
Rodger | 2 | |||
Fratton | Atos | Anne | 1 | |
Rodger | 2-3 | |||
Frimley | Atos | Anne | Global | |
Fulwell | Atos | Anne | 1 | |
Rodger | 2 | |||
Gillingham (Dorset) | Atos | Anne | Global | |
Godalming | Atos | Anne | 1 | Celia had replaced Phil in late March 2019.
The Atos system had replaced in Ditra system in April 2019. |
Rodger | 2 | |||
Grateley | Atos | Anne | 1 | |
Rodger | 2 | |||
Hamble | Atos | Anne | 1 | |
Rodger | 2 | |||
Hampton | Atos | Anne | 1 | The Atos system had replaced the Ditra system on Monday 13th May 2019. |
Rodger | 2 | |||
Hampton Court | Atos | Anne | Global | |
Hampton Wick | Atos | Anne | 1 | |
Rodger | 2 | |||
Hamworthy | Atos | Anne | 1 | |
Rodger | 2 | |||
Havant | Atos | Anne | 1 | Atos had took over Ditra on 18th March 2019. |
Rodger | 2 | |||
Haslemere | Atos | Anne | 1 | New Infotec Silver screens installed. |
Rodger | 2-3 | |||
Hedge End | Atos | Anne | 1 | No chimes. No mind the gap announcement. |
Rodger | 2 | |||
Hersham | Atos | Anne | 1 | |
Rodger | 2 | |||
Hilsea | Atos | Anne | 1 | No chimes. |
Rodger | 2 | |||
Hinchley Wood | Atos | Anne | 1 | The Atos system had replaced the DItra system in May 2019. |
Rodger | 2 | |||
Hinton Admiral | Atos | Anne | 1 | The Atos system had replaced the DItra system in 15-16th May 2019. |
Rodger | 2 | |||
Holton Heath | Atos | Anne | 1 | |
Rodger | 2 | |||
Honiton | Atos | Anne | Global | The Atos system had replaced Ditra in Mid-March 2019. |
Hook | Atos | Anne | 1 | |
Rodger | 2 | |||
Horsley | Atos | Anne | 1 | |
Rodger | 2 | |||
Hounslow | Atos | Anne | 1 | No chimes. |
Rodger | 2 | |||
Isleworth | Atos | Anne | 1 | |
Rodger | 2 | |||
Kempton Park | Atos | Anne | 1 | |
Rodger | 2 | |||
Kew Bridge | Atos | Anne | 1 | |
Rodger | 2 | |||
Kingston | Atos | Anne | 2-3 | One of the first 5 SWR stations to use the Atos system. New Infotec silver screens installed. |
Rodger | 1 | |||
Liphook | Atos | Anne | 1 | Previously Phil Sayer, Global. |
Rodger | 2 | |||
Liss | Atos | Anne | 1 | |
Rodger | 2 | |||
London Road (Guildford) | Atos | Anne | 1 | When this station is called out in calling points, Anne says “London Road” and Rodger says “London Road Guildford”. |
Rodger | 2 | |||
Longcross | Atos | Anne | 1 | |
Rodger | 2 | |||
Lymington Town | Atos | Anne | 1 | Anne replaced Phil. |
Lymington Pier | Atos | Anne | 1 | Anne replaced Phil. |
Malden Manor | Atos | Anne | 1 | |
Rodger | 2 | |||
Martins Heron | Atos | Anne | 1 | |
Rodger | 2 | |||
Micheldever | Atos | Anne | 1 | |
Rodger | 2 | |||
Milford (Surrey) | Atos | Anne | 1, 2 | |
Millbrook (Hampshire) | Atos | Anne | Global | |
Moreton (Dorset) | Atos | Anne | 1 | |
Rodger | 2 | |||
Mortlake | Atos | Anne | 1 | |
Rodger | 2 | |||
Motspur Park | Atos | Anne | Global | |
Mottisfont & Dunbridge | Atos | Anne | Help Point | |
Netley | Atos | Anne | 2 | |
Rodger | 1 | |||
New Malden | Atos | Anne | 1 | Platforms 2-3 are disused |
Rodger | 4 | |||
New Milton | Atos | Anne | Global | The Atos system had replaced the Ditra system on 15th May 2019. |
Norbiton | Atos | Anne | 1 | |
Rodger | 2 | |||
North Sheen | Atos | Anne | 1 | |
Rodger | 2 | |||
Overton | Atos | Anne | 1 | The Atos system replaced the Ditra system in April 2019. No chimes. |
Rodger | 2 | |||
Oxshott | Atos | Anne | 1 | |
Rodger | 2 | |||
Parkstone | Atos | Anne | 2 | |
Rodger | 1 | |||
Petersfield | Atos | Anne | 1 | Atos had replaced Ditra in late March 2019. |
Rodger | 2 | |||
Pinhoe | Atos | Anne | 2 | |
Rodger | 1 | |||
Pokesdown | Atos | Anne | 1 | |
Rodger | 2 | |||
Poole | Atos | Anne | 1 | No Chimes. |
Rodger | 2 | |||
Portchester | Atos | Anne | Global | |
Portsmouth & Southsea | Atos | Anne | 1-2, | Chimes used.
Anne & Rodger replaced Phil in mid-December 2018 2-3 announcements per train depends on situation. |
Rodger | 3-4 | |||
Portsmouth Harbour | Atos | Anne | Global | Chimes used
Anne replaced Phil in Late February 2019 New Infotec Silver Screens installed. Platform 2 does not exist. |
Putney | Atos | Anne | 1,4 | Last SWR's big station with the Ditra system and operational announcements.
The Atos system had replace the Ditra system on 21/5/2019. |
Rodger | 2-3 | |||
Queenstown Road | Atos | Anne | 2-3 | Platform 1 is disused. Anne replaced Phil in Early May 2019. Rodger announces "mind the gap" at this station. Times are not announced on Waterloo bound trains. |
Raynes Park | Atos | Anne | 1-2 | |
Rodger | 3-4 | |||
Redbridge | Atos | Anne | Global | |
Richmond | Atos | Anne | 1, 4-5, 6-7 | Chimes used in all announcements.
Anne and Rodger replaced Phil and Celia in May 2019. P1/2 - South Western Railway. P3/4/5 - London Overground. P6/7 - District line. |
Rodger | 2-3 | |||
Romsey | Atos | Anne | 1 | Chimes Used.
Station transferred from GWR to SWR on 1st April 2020. |
Rodger | 2 | |||
Rowlands Castle | Atos | Anne | 1 | |
Rodger | 2 | |||
Salisbury | Atos | Anne | 2-3 | Chimes used on all train announcements (Platform 1 and 5 are out of public use).
No "Mind the Gap announcement" on all platforms. Phil was replaced by Anne and Rodger in late February 2019. |
Rodger | 4, 6 | |||
Shawford | Atos | Anne | 1 | |
Rodger | 2 | |||
Shepperton | Atos | Anne | Global | New Infotec silver screens installed. |
Sherborne | Atos | Anne | 1 | The Ditra system had been replaced by the Atos system in late April 2019. |
Rodger | 2 | |||
Sholing | Atos | Anne
Rodger |
1
2 |
Replaced Phil. |
Surbiton | Atos | Anne | 1-2 | Chimes used on all train announcements.
The Atos system had replaced the Ditra system on 2/4/2019. |
Rodger | 3-4 | |||
Southampton Central | Atos | Anne | 1,4 | Chimes used.
The Atos system had replaced the Ditra system between Mid-Late March 2019. Changed the Orange Infotec Screens to new Silver Infotec Screens in late 2022. |
Rodger | 2-3 | |||
Southampton Airport Parkway | Atos | Anne | 1 | Last SWR station with New Celia announcements.
The Atos system had completely replaced the Ditra system on 21-5-2019. |
Rodger | 2 | |||
Staines | Atos | Anne | 1 | The Atos system replaced the Ditra system in early-Mid May 2019. |
Rodger | 2 | |||
St Margarets (London) | Atos | Anne | 1-2 | |
Rodger | 3 | |||
St Denys | Atos | Anne | 1,4 | Celia replaced between February and March 2019.
P1/2 for services via Eastleigh. P3/4 for services avoiding Eastleigh. |
Rodger | 2-3 | |||
Stoneleigh | Atos | Anne | Global | Anne replaced the Ditra system on 20/5/2019. |
Strawberry Hill | Atos | Anne | 1 | |
Rodger | 2 | |||
Sunbury | Atos | Anne | 1 | |
Rodger | 2 | |||
Sunningdale | Atos | Anne | 1, 2 | |
Sunnymeads | Atos | Anne | 1 | |
Rodger | 2 | |||
Swanwick | Atos | Anne | 1 | |
Rodger | 2 | |||
Sway | Atos | Anne | 1, 2 | |
Swaythling | Atos | Anne | 1 | |
Rodger | 2 | |||
Syon Lane | Atos | Anne | 1 | |
Rodger | 2 | |||
Teddington | Atos | Anne | 1 | |
Rodger | 2 | |||
Templecombe | Atos | Anne | Global | |
Tisbury | Atos | Anne | 1 | Ditra had been replced in late April 2019. |
Thames Ditton | Atos | Anne | 1 | New Infotec silver screens installed. |
Rodger | 2 | |||
Tolworth | Atos | Anne | 1 | |
Rodger | 2 | |||
Totton | Atos | Anne | Global | Speakers are poor quality and announcements on Platform 2 are really quiet. |
Twickenham | Atos | Anne | 2-3 | No platform 1. Anne & Rodger replaced Phil in 2019. |
Rodger | 4-5 | |||
Upwey | Atos | Anne | 1 | Services to Bristol and London.
Anne also announces Tactile Pathing Announcement. |
Rodger | 2 | Services to Weymouth only. | ||
Upper Halliford | Atos | Anne | 1 | |
Rodger | 2 | |||
Vauxhall | Atos | Anne | 1-2, 5-6 | Chimes used.
Times not announced on Waterloo bound services. The Atos System took over the Ditra system in April 2019. |
Rodger | 3-4, 7-8 | |||
Virginia Water | Atos | Anne | 1,4 | |
Rodger | 2-3 | |||
Walton-on-Thames | Atos | Anne | 1 | The first station to receive new Infotec Silver screens similar to TPE stations. |
Rodger | 2 | |||
Wanborough | Atos | Anne | 1 | |
Rodger | 2 | |||
Wandsworth Town | Atos | Anne | 1,4 | |
Rodger | 2-3 | |||
Wareham | Atos | Anne | 1 | Station is sometimes used for shuttle services by the Swanage Railway to Swanage. |
Rodger | 2 | |||
West Byfleet | Atos | Anne | 1 | The Atos system replaced the Ditra system in Mid-May 2019. |
Rodger | 2-3 | |||
Weybridge | Atos | Anne | 1-2 | No chimes. |
Rodger | 3 | |||
Weymouth | Atos | Anne | 2, 3 | SWR services. |
Rodger | 1 | GWR services. | ||
Whimple | Atos | Anne | Global | Only one platform. |
Whitton | Atos | Anne | 1 | |
Rodger | 2 | |||
Whitchurch (Hampshire) | Atos | Anne | 1 | |
Rodger | 2 | |||
Wimbledon | Telent | Elinor | 1-2, 3-4 | Elinor Hamilton announces District line on Platforms 1-4. |
Atos | Anne | 5-6, 9 | Chimes used. Rodger announces “Mind The Gap” on Platforms 5 - 9.
Only one announcement per train. Anne and Rodger replaced Phil and Celia in March 2019. Platforms 6 and 7 are the fast lines which mostly have fast train announcements, although services to Alton & Basingstoke stop at Platforms 6 & 7 on Sundays for Wimbledon tennis championship. Platform 9 is used by Thameslink services to Sutton and St Albans. Platforms 10a and 10b are used by Tramlink services. No announcements on Platforms 10a and 10b. | |
Rodger | 7-8 | |||
Winchester | Atos | Anne | 1 | Chimes used. New Infotec Silver Screens installed.
The Atos system replaced the Ditra system in Late February 2019. |
Rodger | 2 | |||
Winchfield | Atos | Anne | 1 | Anne and Rodger replaced Celia in January - February 2019. |
Rodger | 2 | |||
Windsor & Eton Riverside | Atos | Rodger | Global | Rodger replaced Phil in November 2018. Anne does BTP 61016 message. |
Winnersh | Atos | Anne | 1 | New Infotec orange writing screens replaced old Ferrograph display on Platform 1 due to the old one being broken. |
Rodger | 2 | |||
Winnersh Triangle | Atos | Anne | 1 | |
Rodger | 2 | |||
Witley | Atos | Anne | 1 | |
Rodger | 2 | |||
Woking | Atos | Anne | 1, 5-6 | The Atos system had replaced the Ditra system on Monday 4th March 2019.
Bridge-link announcements are from all Platforms in random. Chimes used in Atos automated announcements only, |
Rodger | 2-4 | |||
Wool | Atos | Anne | 1 | |
Rodger | 2 | |||
Wokingham | Atos | Anne | 1 | New Infotec Silver Screens installed.
No chimes Anne & Rodger replaced Phil in Nov 2018. |
Rodger | 2 | |||
Woolston | Atos | Anne | 1 | |
Rodger | 2 | |||
Worcester Park | Atos | Anne | 1 | |
Rodger | 2 | |||
Worplesdon | Atos | Anne | 1 | |
Rodger | 2 | |||
Wraysbury | Atos | Anne | 1 | |
Rodger | 2 | |||
Yeovil Junction | Atos | Anne | Global | Phil replaced by Celia in 2017 and then by Anne in 2019. |
Southeastern[]
Some Acapela Rachel announcements at some stations e.g. Cuxton end with 'This service is operated by Southeastern' in a similar fashion to East Midlands Railway or Transport for Wales, and at some stations it doesn't.
The TFL status by Anne is announced every Weekday morning during the morning commute to tell them if the line there using is closed etc, announcements are played every 15 mins from a certain time.
At some SE Stations Mike/Anne will not announce the TOC.
Station | System | Voice | Platforms | Notes |
---|---|---|---|---|
Adisham | MicroPA | Acapela Rachel | 1, 2 | |
Albany Park | Atos | Anne | 1, 2 | |
Ashford International | Atos | Anne | 1-2, 5-6 | 2 announcement per through train. |
KeTech | Celia Drummond | 3-4 | Eurostar platforms, Eurostar stopped serving Ashford and Ebbsfleet in March 2020. | |
Aylesford | MicroPA | Acapela Rachel | 1, 2 | Medway Valley Line. |
Aylesham | MicroPA | Acapela Rachel | 1, 2 | |
Barming | Atos | Anne | 1, 2 | |
Barnehurst | Atos | Anne | 1, 2 | |
Bat & Ball | MicroPA | Acapela Rachel | 1, 2 | Mainly served by Thameslink. |
Battle | Atos | Anne | Global | |
Bearsted | Atos | Anne | 1, 2 | One announcement per train. |
Beckenham Junction | Atos | Anne | 1, 2 | P1 for Southern serivces to London Bridge via Crystal Palace. |
Mike | 3, 4 | P4 used in Peak Hours for services to/from London Blackfriars and engineering Works. | ||
Bekesbourne | MicroPA | Acapela Rachel | 1, 2 | |
Beltring | MicroPA | Acapela Rachel | 1, 2 | |
Belvedere | Atos | Anne | Global | |
Bexley | Atos | Anne | 1, 2 | TOC not announced.
2 announcements per train. |
Bexleyheath | Atos | Anne | 1, 2 | |
Bickley | Atos | Anne | Global | P3/4 are rarely used.
P1/2 are mainly used for Thameslink services and SE services via Petts Wood. |
Birchington-on-sea | Atos | Anne | 1 | |
Mike | 2 | |||
Blackheath | Atos | Anne | 1 | |
Mike | 2 | |||
Borough Green & Wrotham | Atos | Anne | 1, 2 | |
Brixton | Atos | Anne | 1, 2 | Mark Stutter replaced Anne in 2004. Anne replaced Mark Stutter in 2012. |
Broadstairs | Atos | Anne | 1, 2 | |
Bromley North | Atos | Anne | Global | Display Board on P1 side. |
Bromley South | Atos | Anne | 1-2 | Pauline Cavilla replaced Anne in mid 2000s. Anne & Mike replaced Pauline Cavilla in 2012/13. |
Mike | 3-4 | |||
Canterbury East | Atos | Anne | 1 | |
Mike | 2 | |||
Canterbury West | Atos | Anne | 1 | |
Mike | 2 | |||
Catford Bridge | Atos | Anne | Global | |
Charing | Atos | Anne | 1, 2 | |
Charlton | Atos | Anne | Global | |
Chatham | Atos | Anne | 1 | Acapela Rachel replaced Pauline Cavilla in 2012, Anne & Mike replaced Rachel in 2013. |
Mike | 2 | |||
Chelsfield | Atos | Anne | 1, 2 | |
Chestfield & Swalecliffe | Atos | Anne | 1, 2 | |
Chilham | MicroPA | Acapela Rachel | 1, 2 | Platform length 4 coaches long. |
Chislehurst | Atos | Anne | 1, 2-3, 4 | One announcement per train. Platforms 1 and 2 are fast lines that are only used when needed. |
Clock House | Atos | Anne | 1, 2 | |
Crayford | Atos | Anne | 1, 2 | |
Crowhurst | MicroPA | Acapela Rachel | 1, 2 | |
Cuxton | MicroPA | Acapela Rachel | 1, 2 | Medway Valley Line. |
Dartford | Atos | Anne | 1, 2 | |
Mike | 3, 4 | |||
Deal | Atos | Anne | 1, 2 | Announcements are made multiple times for Cancellations and Delayed.
Announcements are made on arrival into the station. Announcements are sometimes not announced for services departing from Platform 1 if services start at Deal departing from Platform 1 towards Ramsgate. Announcements are made 3 min before departure if services start at Deal. Replacement bus announcements made. Anne replaced Pauline Cavilla. |
Deptford | Atos | Anne | Global | Anne replaced Mark Stutter (Thales) in 2012. |
Dover Priory | Atos | Anne | 1 | 1 Announcement per train, 4 minutes before departure for services starting at Dover.
Calling trains are made on arrival into the station for through services. Untill 2018 - Anne P1. Mike P2/3. 2018-2023 - Mike P1, Anne P2/3. October 2023 - Anne is back on P1, Mike back on P2/3. |
Mike | 2-3 | |||
Dumpton Park | MicroPA | Acapela Rachel | 1, 2 | Island Platform. |
Dunton Green | Atos | Anne | 1, 2 | |
East Farleigh | MicroPA | Acapela Rachel | 1, 2 | Medway Valley Line. |
East Malling | Atos | Anne | 1, 2 | |
Ebbsfleet International | Atos | Anne | 2-3, 5-6 | Anne is only global on SE platforms, SE manual announcements are zoned. Station is managed by Network Rail, CIS is managed by Southeastern. |
KeTech | Celia Drummond | 1, 4 | Eurostar platforms. Eurostar stopped serving Ashford and Ebbsfleet in March 2020. | |
Elmers End | Atos | Anne | 2, 3 | Platform 1 is used by Tramlink and is not announced. Platform 4 is disused. |
Elmstead Woods | Atos | Anne | 1, 2, 3, 4 | Platforms 1 and 2 are the fast lines which are only used when needed. |
Eltham | Atos | Anne | 1, 2 | |
Erith | Atos | Anne | Global | |
Etchingham | Atos | Anne | 1, 2 | |
Eynsford | Atos | Anne | 1, 2 | Mainly served by Thameslink. |
Falconwood | Atos | Anne | 1, 2 | |
Farningham Road | Atos | Anne | Global | |
Faversham | Atos | Anne | 1-2 | TOC is not announced. |
Mike | 3-4 | |||
Folkestone Central | Atos | Anne | Global | Island Platform. |
Folkestone West | MicroPA | Acapela Rachel | 1, 2 | Announcements are only made through the CIS Screens. |
Frant | MicroPA | Acapela Rachael | 1, 2 | |
Gillingham (Kent) | Atos | Anne | 1,2 | Platform 1 used for terminating services. |
Mike | 3 | |||
Gravesend | Atos | Anne | 0, 2 | Anne & Mike replaced Mark Stutter and Pauline Cavilla in 2012. New Platform 1 added in 2015/16.
Anne announces 'via Woolwich Arsenal & Lewisham' where as Mike doesn't have that so he doesn't announce it. |
Mike | 1 | |||
Greenhithe (for Bluewater) | Atos | Anne | 1, 2 | |
Greenwich | Atos | Anne | 2 | |
Mike | 1 | |||
Grove Park | Atos | Anne | 4-5 | Previously Acapela Rachel who replaced Pauline Cavilla in 2012. Anne & Mike replaced Rachel in 2013/14.
Platform 1 is used for Bromley North trains which are only voiced by Mike, Platforms 4-5 are slow line services voiced by Anne. No announcements on Platforms 2 and 3 as they are the fast lines. |
Mike | 1 | |||
Halling | MicroPA | Acapela Rachel | 1, 2 | Medway Valley Line. |
Harrietsham | Atos | Anne | 1, 2 | |
Hastings | Atos | Anne | 1-2 | One announcement per train. Not all trains which at start at the station are announced.
Mike and Anne swapped platforms in Summer 2023. |
[1]Mike | 3-4 | |||
Hayes (Kent) | Atos | Anne | Global | Island Platform. |
Headcorn | Atos | Anne | 1, 2 | |
Herne Hill | Atos | Anne | 1-2 | Mark Stutter and Pauline Cavilla (Thales) replaced Anne in mid 2000s.
Anne & Mike replaced Mark Stutter and Pauline Cavilla in 2012. One announcement per train. |
Mike | 3-4 | |||
High Brooms | Atos | Anne | 1, 2 | |
Higham | Atos | Anne | 1, 2 | Mainly served by Thameslink.
SE only serve during Peak times, engineering works or during service disruption. |
Hildenborough | Atos | Anne | 1, 2 | |
Hither Green | Atos | Anne | 1, 4, 6 | Anne & Mike replaced Pauline Cavilla & Mark Stutter (Thales) in late 2012.
P1+2 - Fast Lines. P3+4 - services via Grove Park & Orpington. P5+6 - services via Sidcup. |
Mike | 2-3, 5 | |||
Hollingbourne | Atos | Anne | 1, 2 | |
Kearsney | MicroPA | Acapela Rachel | 1, 2 | |
Kemsing | Atos | Anne | 1, 2 | |
Kemsley | MicroPA | Acapela Rachel | 1, 2 | Sheerness on Sea line. |
Kent House | Atos | Anne | 1+2, 3+4 | Platforms 1 and 4 are rarely used. |
Kidbrooke | Atos | Anne | 1, 2 | Previously Mark Stutter until replaced by Acapela Rachel in 2012. |
Knockholt | Atos | Anne | 1, 2 | |
Ladywell | Atos | Anne | Global | Previously Acapela Rachel and before Pauline Cavilla. |
Lee | Atos | Anne | 1, 2 | Previously Acapela Rachel and before Mark Stutter. |
Lenham | Atos | Anne | 1, 2 | |
Lewisham | Atos | Anne | 1, 3 | Mark Stutter replaced Anne in 2004. Anne & Mike replaced Mark Stutter in 2012. Both Anne & Mike announce bus replacements. Anne and Mike do not announce DLR trains on Platforms 5 and 6. |
Mike | 2, 4 | |||
iVENCS | DLR Female | 5-6 | DLR platforms. | |
London Waterloo East | Atos | Mike | A, B-C, D |
Rarely 2 announcements per train. Anne replaced Phil (Funkwerk) in late 2009. Mike replaced Anne in September 2016 and sometimes Mike does not announce a service but when he does they are very vey quiet. This station has lettered platforms, so as not to be confused with the numbered London Waterloo. Only stations to still have old Connex Ditra screens still in use. Platforms B/D are for services to London Charing Cross only. |
Longfield | Atos | Anne | 1 | |
Mike | 2 | |||
Lower Sydenham | Atos | Anne | 1, 2 | Anne replaced Pauline Cavilla in 2012. |
Maidstone Barracks | MicroPA | Acapela Rachel | 1, 2 | Connection via a bridge to Maidstone East.
Medway Valley Line. |
Maidstone East | Atos | Anne | 1,3 | Connection via a bridge to Maidstone Barracks.
P3 - Bay Platform. Previously Pauline Cavilla until 2012. |
Mike | 2 | |||
Maidstone West | Atos | Anne | Global | Previosuly Mark Stutter until 2012.
Medway Valley Line. |
Marden | Atos | Anne | Global | |
Margate | Atos | Anne | 1, 4 | P4 - Bay Platform. |
Mike | 2-3 | |||
Martin Mill | MicroPA | Acapela Rachel | 1,2 | New Infotec boards were installed during 2020. |
Maze Hill | Atos | Anne | 1, 2 | |
Meopham | Atos | Anne | 1 | |
Mike | 2 | |||
Minster | MicroPA | Acapela Rachel | 1, 2 | P2 board sometimes glitches and may show the wrong service when services start at Minster during Engineering Works. |
Mottingham | Atos | Anne | 1, 2 | |
New Beckenham | Atos | Anne | 1, 2 | |
New Cross | Atos | Anne | A-B, C-D | Platforms are lettered, so as not to be confused with New Cross Gate which uses numbered platforms. Anne replaced Pauline Cavilla in 2012.
Platform B rarely used. Platform D is served by London Overground. |
New Eltham | Atos | Anne | 1, 2 | |
New Hythe | MicroPA | Acapela Rachel | 1, 2 | Medway Valley Line. |
Newington | Atos | Mike | 1, 2 | Only SE station outside of London to be Mike only. |
Northfleet | Atos | Anne | 1, 2 | |
Orpington | Atos | Anne | 1-2, 5-6 | Previously Pauline Cavilla & Mark Stutter, Pauline Cavilla announced all platforms, Mark Stutter announced Security, left luggage and other general announcements. Thales was replaced in mid-2012 by the Atos system.
P1, 6-8 - Bay Platforms. |
Mike | 3-4, 7-8 | |||
Otford | Atos | Anne | 1, 2 | |
Paddock Wood | Atos | Anne | 1, 2-3 | Platform 3 is used for services to Strood via Maidstone West. |
Penge East | Atos | Anne | 1-2 | |
Petts Wood | Atos | Anne | 1-2 | Fast lines, only used when needed. |
Mike | 3-4 | Slow lines, mainly used. Pauline Cavilla was replaced in 2012. | ||
Plumstead | Atos | Anne | Global | |
Queenborough | MicroPA | Acapela Rachel | 1, 2 | Sheerness on Sea Line. |
Rainham (Kent) | Atos | Anne | 0-1 | Acapela Rachel replaced Mark Stutter in Summer 2012, Anne & Mike replaced Rachel in 2013, when Platform 0 arrived.
P0 is mainly used by Thameslink services unless during engineering works. |
Mike | 2 | |||
Ramsgate | Atos | Anne | 1-2 | One announcement per train.
In the past it was Mark Stutter until 2010 then Pauline Cavilla replaced Mark Stutter. Anne & Mike replaced Pauline Cavilla in 2012/2013. If Anne/Mike have started announcing for trains that depart at the same time then the other announcer announcement will be cut. TOC not announced. |
Mike | 3-4 | |||
Robertsbridge | Atos | Anne | 1, 2 | |
Rochester | Atos | Anne | 1 |
Acapela Rachel replaced Mark Stutter in 2012 Anne & Mike replaced Acapela Rachel in 2013. New station opened in December 2015. One announcement per train. P3 used for Peak Hour Trains. |
Mike | 2-3 | |||
Sandling | MicroPA | Acapela Rachael | 1, 2 | Announcements/CIS boards are regularly not working because of the situation of the station. |
Sandwich | MicroPA | Acapela Rachael | 1,2 | Acapela - 4 + 2 mins to Departure.
As well as Anne being there Acapela Rachael still continues to make announcements at Sandwich through the CIS's. |
Atos | Anne | Anne - 2/1 mins to Departure.
Anne arrived to Sandwich when the station had platform extensions for the The Open Golf in 2021. | ||
Selling | Atos | Anne | 1, 2 | |
Sevenoaks | Atos | Anne | 1-2 | Anne replaced Pauline Cavilla. One announcement per train. |
Mike | 3-4 | |||
Sidcup | Atos | Anne | 1, 2 | Announcements are quiet. |
Shoreham (Kent) | Atos | Anne | 1, 2 | Mainly served by Thameslink. |
Shortlands | Atos | Anne | 1-2 | P1+2 used for stopping services via Catford or Beckenham Junction.
3+4 used for services not stopping. |
Shepherds Well | MicroPA | Acapela Rachel | 1, 2 | New Screens added- July 2020.
Announcements arrived - 20/08/2020. Announces trains 4 mins prior to arrival and when the train is approaching the station. Announces trains 3 mins prior to departure when a train starts at Shepherds Well. |
Sheerness-on-sea | Atos | Anne | Global | Sheerness Line. |
Sittingbourne | Atos | Anne | 1 | Platform 3 mainly used for trains to Sheerness unless for Engineering Works. |
Mike | 2-3 | |||
Slade Green | Atos | Anne | Global | |
Snodland | MicroPA | Acapela Rachel | 1, 2 | |
Sole Street | Atos | Anne | Global | |
St Johns | Atos | Anne | Global | Island Platform. |
St Mary Cray | Atos | Anne | 3-4 | P3/4 mainly used for services via Chatham.
P1/2 mainly used for Thameslink and SE services via Otford. |
Mike | 1-2 | |||
Staplehurst | Atos | Anne | Global | |
Stone Crossing | Atos | Anne | 1, 2 | |
Stonegate | MicroPA | Acapela Rachael | 1, 2 | |
Stratford International | Atos | Anne | 2-3 | Two announcements per train.
P1/4 closed, was mainly used during the 2012 Olympics, were meant for full term use by Eurostar. This station is managed by Network Rail while the CIS is managed by Southeastern. P2 - St Pancras Bound. P3 - Kent Bound. |
Strood | Atos | Anne | 1 | Pauline Cavilla and Mark Stutter was replaced by Acapela Rachel (temporarily) in 2012. Anne & Mike replaced Acapela Rachel in 2013.
Platform 3 mainly used for Medway Valley Line services to Tonbridge or Paddock Wood via Maidstone West. Anne and Mike swapped platforms in July 2023. |
Mike | 2-3 | |||
St Leonard's Warrior Square | Atos | Anne | 1, 2 | |
Sundridge Park | Atos | Anne | 1, 2 | Only stop between Grove Park and Bromley North. |
Swale | MicroPA | Acapela Rachel | 1 | Sheerness on Sea Line. |
Swanley | Atos | Anne | Global | P1/2 mainly used for services via Otford and Thameslink.
P3/4 mainly used for services via Chatham. Anne replaced Pauline Cavilla in 2012. |
Swanscombe | Atos | Anne | 1, 2 | |
Sydenham Hill | Atos | Anne | 1 | Pauline Cavilla replaced Anne in mid 2000s. Anne & Mike replaced Pauline Cavilla in 2012. |
Mike | 2 | |||
Teynham | Atos | Anne | 1, 2 | |
Thanet Parkway | Atos | Anne | 1 | Station opened on 31st July 2023, only served by High Speed services via Canterbury West and services to Charing Cross/Cannon Street via Canterbury.
Services via Deal only call during emergency timetable or engineering works. White InfoTec screens on P1/2. |
Mike | 2 | |||
Tonbridge | Atos | Anne | 1-2 | Plus Rail Replacement Bus Announcements.
Pauline Cavilla was replaced in 2012. |
Mike | 3-4 | P4 - Bay platform, rarely used by passenger services. | ||
Tunbridge Wells | Atos | Anne | 1 | One announcement per train. |
Mike | 2 | |||
Wadhurst | Atos | Anne | 1, 2 | |
Walmer | MicroPA | Acapela Rachel | 1, 2 | Board on Platform 2 occasionally broke, due to it being dropped whilst being installed. |
Wateringbury | MicroPA | Acapela Rachel | 1, 2 | |
Welling | Atos | Anne | 1, 2 | |
West Dulwich | Atos | Anne | 1, 2 | |
Westenhanger | MicroPA | Acapela Rachel | 1, 2 | Platform 1 is 5 coaches long. |
Westgate-on-Sea | Atos | Anne | 1, 2 | |
West Malling | Atos | Anne | 1, 2 | |
West St Leonards | Atos | Anne | 1 , 2 | |
West Wickham | Atos | Anne | 1, 2 | |
Westcombe Park | Atos | Anne | Global | |
Whitstable | Atos | Anne | 1 | |
Mike | 2 | |||
Woolwich Arsenal | Atos | Anne | 1, 2 | Anne replaced Pauline Cavilla and Mark Stutter in 2012. |
Woolwich Dockyard | Atos | Anne | Global | |
Yalding | MicroPA | Acapela Rachel | 1, 2 |
Southern (GTR) stations[]
There are 4 stations on the Southern network that do not have ATOS Anne or Matt and they are Doleham, Southease, Three Oaks and Winchelsea, most likely due to them either having limited service or being located in the middle of nowhere. In 2023-24 according to RailAdvent Southern have installed CIS screens on 7 rural stations; Bishopstone, Doleham, Newhaven Harbour, Normans Bay, Pevensey Bay, Southease and Winchelsea. Info can be found here.
Station | System | Voice | Platforms | Notes |
---|---|---|---|---|
Aldrington | Atos | Anne | 1 | |
Matt | 2 | |||
Amberley | Atos | Anne | 1 | |
Matt | 2 | |||
Angmering | Atos | Anne | 1 | Anne and Matt replaced Celia in 2019. |
Matt | 2 | |||
Appledore | Atos | Anne | 1 | Anne also makes 61016 announcements 6 mins before train. |
Atos | Matt | 2 | Announcements are quiet. Matt announces trains when trains have arrived. | |
Arundel | Atos | Anne | 1 | |
Matt | 2 | |||
Ashtead | Atos | Anne | 1 | |
Matt | 2 | |||
Ashurst | Atos | Anne | 1 | |
Balcombe | Atos | Anne | 1 | |
Matt | 2 | |||
Balham | Atos | Anne | 1-2 | Anne and Matt replaced Phil & Celia in 2018. Platforms 3 & 4 are rarely used. |
Matt | 3-4 | |||
Banstead | Atos | Anne | 1 | |
Barnham | Atos | Matt | 1-2 | The Atos system had replaced the Ditra system in the Christmas period of 2018. |
Anne | 3 | |||
Battersea Park | Atos | Matt | 2-3 | Platform 1 is disused. Platform 2 is served by London Overground limited services. Platform 5 is used by fast trains. Atos replaced Ditra in March 2019.
Old Ditra screens but in Atos version wordings and announcements. Since Atos replaced Ditra announcement volume has been quiet. |
Anne | 4-5 | |||
Belmont | Atos | Anne | 1 | |
Berwick (Sussex) | Atos | Anne | 1 | |
Matt | 2 | |||
Bexhill | Atos | Anne | 1 | |
Matt | 2 | |||
Bishopstone | Atos | Anne | 1 | |
Bognor Regis | Atos | Anne | 1-2 | Anne & Matt replaced Phil in 2018/2019. |
Matt | 3-4 | |||
Bosham | Atos | Anne | 1 | |
Matt | 2 | |||
Boxhill & Westhumble | Atos | Anne | 1 | |
Matt | 2 | |||
Billingshurst | Atos | Anne | 1 | |
Matt | 2 | |||
Birkbeck | Atos | Anne | 1 | Phil was replaced in early 2019 by Anne.
Station also served by Tramlink. Tramlink services not announced. |
Brighton | Atos | Matt | 1-2, 7-8 | Phil took over all announcements from Celia when she shared the platforms with Phil. Phil was replaced by Only Woman early in 2015 and Only Woman was replaced by Anne & Matt in February 2018.
Matt announces train services along the Southern Coastway services and Anne announces London-bound trains. Please note when trains are subjected to delays and cancellations, Matt is responsible for announcing all such announcements, not Anne. Speakers at Brighton are not easy to hear due to old amplifiers possibly from BR. |
Anne | 3-4, 5-6 | |||
Burgess Hill | Atos | Anne | 1 | |
Matt | 2 | |||
Buxted | Atos | Anne | 1 | |
Carshalton | Atos | Anne | 1 | |
Matt | 2 | |||
Carshalton Beeches | Atos | Anne | 1 | |
Matt | 2 | |||
Caterham | Atos | Anne | 1-2 | |
Cheam | Atos | Anne | 1 | |
Matt | 2 | |||
Chichester | Atos | Anne | 1 | Anne & Matt replaced Phil and Celia in 2018. |
Matt | 2 | |||
Chipstead | Atos | Anne | 1 | |
Matt | 2 | |||
Collington | Atos | Anne | 1 | Old Ditra screens but in Atos wordings and announcements. |
Matt | 2 | |||
Cooden Beach | Atos | Anne | 1 | |
Matt | 2 | |||
Cooksbridge | Atos | Anne | 1 | On the line between Haywards Heath and Lewes. |
Matt | 2 | |||
Coulsdon South | Atos | Anne | 1 | Phil/Celia replaced February 2018. |
Matt | 2 | |||
Coulsdon Town | Atos | Anne | 1 | Renamed from Smitham to Coulsdon Town in May 2011. |
Matt | 2 | |||
Cowden | Atos | Anne | 1 | |
Crawley | Atos | Anne | 1 | |
Matt | 2 | |||
Crowborough | Atos | Anne | 1 | |
Matt | 2 | |||
Doleham | Atos | TBC | Global | Announcements installed early 2024. Only one platform. |
Dorking | Atos | Anne | 1 | Anne & Matt replaced Phil and Celia. |
Matt | 2-3 | |||
Dormans | Atos | Anne | 1, 2 | |
Durrington-on-Sea | Atos | Anne | 1 | |
Matt | 2 | |||
Earlswood (Surrey) | Atos | Anne | 1 | |
Matt | 2 | |||
Eastbourne | Atos | Anne | 1-2 | |
Matt | 3 | |||
East Croydon | Atos | Anne | 1-2, 5-6 | Robert Lister and Julie Berry was replaced by Phil & Celia in 2000, Phil announced on Platforms 1-2 and 5-6 and Celia on Platforms 3-4. Phil took over Celia on Platforms 3 & 4 in 2011/12.
Phil was replaced by Only Woman in early 2014. Only Woman was then replaced by Anne and Matt in January 2018. |
Matt | 3-4 | |||
East Dulwich | Atos | Anne | 1 | |
Matt | 2 | |||
East Grinstead | Atos | Anne | Global | |
Edenbridge | Atos | Anne | 1 | Old Ditra screens but in Atos wordings and announcements. |
Matt | 2 | |||
Edenbridge Town | Atos | Anne | 1 | |
Matt | 2 | |||
Epsom | Atos | Anne | 3-4 | Phil & Celia replaced in 2018. |
Matt | 1-2 | |||
Epsom Downs | Atos | Matt | 1 | Matt replaced Phil. |
Emsworth | Atos | Anne | 1 | Atos replaced Ditra on 23/1/2019. |
Matt | 2 | |||
Eridge | Atos | Anne | 1 | Platform 1 - Southern services.
Platforms 2 and 3 - Spa Valley Railway (No Rail connection from Uckfield line). Anne replaced Acapela Rachel. |
Ewell East | Atos | Anne | 1 | |
Matt | 2 | |||
Falmer | Atos | Anne | 1 | 'The next train to arrive at platform x' is used here. |
Matt | 2 | |||
Ford | Atos | Anne | Global | Anouncements are quiet.
Old Ditra screens but in Atos version wordings and announcements. |
Gatwick Airport | Atos | Anne | 1-2,5-6 | Robert Lister and Julie Berry (Infomat) replaced in early 2000s by Phil (Funkwerk). In 2002/2003 Anne & Mike replaced Phil (possibly first few stations to receive Atos in early 2000s) in Network Rail stations.
Anne/Mike replaced by "Only Woman" in mid-2013. "Only Woman" replaced by Anne and Matt April 2018. Gatwick Airport is also managed by Gatwick Express. This station was previously managed by Network Rail until January 2012 and transferred management to Southern. |
Matt | 3-4, 7 | |||
Gipsy Hill | Atos | Anne | 1 | |
Matt | 2 | |||
Glynde | Atos | Anne | 1 | |
Matt | 2 | |||
Godstone | Atos | Anne | 1 | |
Matt | 2 | |||
Goring-by-Sea | Atos | Anne | 1 | |
Matt | 2 | |||
Hackbridge | Atos | Anne | 1 | |
Matt | 2 | |||
Ham Street | Atos | Anne | 1 | Anne/Matt replaced Phil.
Until announcer change Phil was also announcer in the yellow 'Next Train' boxes. |
Matt | 2 | |||
Hampden Park | Atos | Anne | 1 | Old Ditra screens but in Atos wordings and announcements. |
Matt | 2 | |||
Hassocks | Atos | Anne | 1 | |
Matt | 2 | |||
Haywards Heath | Atos | Matt | 1-2 | |
Anne | 3-4 | |||
Hever | Atos | Anne | 1 | |
Matt | 2 | |||
Holmwood | Atos | Anne | Global | |
Horley | Atos | Anne | 1, 4 | Chimes are used. Platforms 3 and 4 are fast lines. |
Matt | 2-3 | |||
Horsham | Atos | Anne | 1-2 | Replaced Phil & Celia. |
Matt | 3-4 | |||
Hove | Atos | Anne | 1-2 | Replaced Phil & Celia. |
Matt | 3 | |||
Hurst Green | Atos | Anne | 1 | |
Matt | 2 | |||
Ifield | Atos | Anne | 1 | |
Matt | 2 | |||
Kenley | Atos | Anne | 1 | |
Matt | 2 | |||
Kingswood | Atos | Anne | 1 | |
Matt | 2 | |||
Lancing | Atos | Anne | 1 | |
Matt | 2 | |||
Leatherhead | Atos | Anne | 1 | Phil/Celia replaced in April 2018. |
Matt | 2 | |||
Leigh (Kent) | Atos | Anne | 1 | |
Matt | 2 | |||
Lewes | Atos | Anne | 2,3 | Phil/Celia replaced in January 2019. |
Matt | 1,4-5 | |||
Lingfield | Atos | Anne | 1 | |
Matt | 2 | |||
Littlehampton | Atos | Anne | 1-2 | |
Matt | 3-4 | |||
Littlehaven | Atos | Anne | 1 | |
Matt | 2 | |||
London Road (Brighton) | Atos | Anne | 1 | |
Matt | 2 | |||
Merstham | Atos | Anne | 1 | Phil/Celia replaced in April 2018. |
Matt | 2 | |||
Mitcham Eastfields | Atos | Anne | 1 | |
Matt | 2 | |||
Mitcham Junction | Atos | Anne | 1 | Platform length 7 coaches. |
Matt | 2 | |||
Moulsecoomb | Atos | Anne | 1 | Phil/Celia replaced in January 2019 |
Matt | 2 | |||
Newhaven Harbour | Atos | Anne | 1 | Station now rarely served during off peak. |
Matt | 2 | |||
Newhaven Town | Atos | Anne | 1 | |
Matt | 2 | |||
Norbury | Atos | Matt | 1 | No announcements on Platform 4. |
Anne | 2-3 | |||
Normans Bay | Atos | Anne | 1 | No CIS Screens. |
Matt | 2 | |||
North Dulwich | Atos | Anne | 1 | |
Matt | 2 | |||
Nutfield | Atos | Anne | 1 | |
Matt | 2 | |||
Ockley | Atos | Anne | Global | |
Ore | Atos | Anne | 1 | |
Matt | 2 | |||
Oxted | Atos | Anne | 1 | |
Matt | 2-3 | |||
Peckham Rye | Atos | Anne | 3,4 | |
Matt | 1,2 | |||
Penshurst | Atos | Anne | 1 | |
Matt | 2 | |||
Pevensey & Westham | Atos | Anne | 1 | |
Matt | 2 | |||
Pevensey Bay | Atos | Anne | 1 | Only has a limited services during peak times. |
Matt | 2 | |||
Polegate | Atos | Anne | 1 | |
Matt | 2 | |||
Plumpton | Atos | Anne | 1 | |
Matt | 2 | |||
Preston Park | Atos | Anne | 1-2 | Old Ditra screens in Atos wordings and announcements. |
Matt | 3 | |||
Purley | Atos | Anne | 1, 4-5 | Phil/Celia replaced in March 2018.
Anne and Matt announce fast train on Platforms 1 & 2 - Platforms not in use Platform 3&4 for services via Redhill Platform 5 & 6 for services to/from Tattenham Corner & Caterham. |
Matt | 2-3, 6 | |||
Purley Oaks | Atos | Anne | 2-3 | Platform 1 is disused. |
Matt | 4 | |||
Queens Road Peckham | Atos | Anne | 1-2 | Anne replaced Phil. |
Redhill | Atos | Matt | 0, 3 | Celia took over announcements from Phil on Platforms 1 & 2 in 2016.
Celia replaced in late October 2017. Platform 0 added in early 2018. |
Anne | 1, 2 | |||
Reedham (Surrey) | Atos | Anne | 1 | |
Matt | 2 | |||
Reigate | Atos | Anne | 2 | Atos had replaced Ditra between February and March 2018. |
Matt | 1 | |||
Riddlesdown | Atos | Anne | 1 | |
Matt | 2 | |||
Rye | Atos | Anne | Global | Marsh Link Line - Ashford to Hastings |
Salfords | Atos | Anne | 1 | |
Matt | 2 | |||
Sanderstead | Atos | Anne | 1 | |
Matt | 2 | |||
Seaford | Atos | Anne | 2 | There is no Platform 1. |
Selhurst | Atos | Anne | 2-3 | Old Ditra screens but in Atos version wordings and announcements. Platforms 3 and 4 are rarely used. |
Matt | 1, 4 | |||
Shoreham-by-Sea | Atos | Anne | 1 | Old Ditra screens but in Atos version wordings and announcements. |
Matt | 2 | |||
South Bermondsey | Atos | Anne | Global | Anne replaced Phil. |
South Croydon | Atos | Matt | 1, 4-5 | Platform 3 & 5 mainly used.
Phil replaced Celia in 2004. Anne & Matt replaced Phil in 2019. |
Anne | 2-3 | |||
Southease | Atos | Anne | TBC | Announcements installed in early 2024. |
Matt | TBC | |||
Southwick | Atos | Anne | 1 | |
Matt | 2 | |||
Sutton | Atos | Anne | 1, 3 | Platforms 3 and 4 swapped announcements in 2019 |
Matt | 2, 4 | |||
Streatham Common | Atos | Matt | 1, 4 | Anne and Matt replaced Phil & Celia in 2019,
Platforms 3 and 4 - Fast Line Platforms Old Ditra screens in Atos wordings and announcements. |
Anne | 2-3 | |||
Streatham Hill | Atos | Anne | 1 | |
Matt | 2 | |||
Streatham | Atos | Matt | 1 | Old Ditra screens in Atos wordings and announcements.
Phil was replaced in Nov/Dec 2018. |
Anne | 2 | |||
Tadworth | Atos | Anne | Global | |
Tattenham Corner | Atos | Anne | Global | |
Thornton Heath | Atos | Matt | 1, 4 | Old Ditra screens but in Atos version wordings and announcements.
Platforms 3 and 4 - Fast Line Platforms. |
Anne | 2-3 | |||
Three Bridges | Atos | Matt | 1-2, 5 | Anne & Matt Replaced Phil & Celia in 2018. |
Anne | 3, 4 | |||
Three Oaks | Atos | TBC | Global | New announcements installed early 2024. Only one platform. |
Tulse Hill | Atos | Anne | 1, 4 | |
Matt | 2-3 | |||
Uckfield | Atos | Anne | 1 | |
Upper Warlingham | Atos | Anne | 1 | Phil and Celia replaced in summer 2018. |
Matt | 2 | |||
Waddon | Atos | Anne | 1 | Anne and Matt replaced Phil and Celia 2018/19. |
Matt | 2 | |||
Wallington | Atos | Anne | 1 | Anne and Matt replaced Phil & Celia in 2018/19. |
Matt | 2 | |||
Wandsworth Common | Atos | Matt | 1, 4 | Anne and Matt replaced Phil & Celia in 2018/19. Platforms 3 and 4 are fast lines which only have fast train announcements. |
Anne | 2-3 | |||
Warnham | Atos | Anne | 1 | Departure Boards are on help points which can be found on both Platforms.
No Announcer on Platform 2. |
West Norwood | Atos | Anne | 1 | Platform length 7 coaches. |
Matt | 2 | |||
Winchelsea | Atos | TBC | Global | Announcements installed in early 2024. Only one platform. |
Whyteleafe | Atos | Anne | 1 | |
Matt | 2 | |||
Whyteleafe South | Atos | Anne | 1 | |
Matt | 2 | |||
Wivelsfield | Atos | Anne | 1 | |
Matt | 2 | |||
Woldingham | Atos | Anne | 1 | |
Matt | 2 | |||
Woodmansterne | Atos | Anne | 1 | |
Matt | 2 | |||
West Worthing | Atos | Anne | 1 | |
Matt | 2 | |||
Worthing | Atos | Anne | 1-2 | Platform 3 is rarely used. |
Matt | 3 |
Thameslink (GTR) stations[]
Stations on the line between Denmark Hill and Ravensbourne were owned by Southeastern until 2018 when Thameslink took over when they took over the services from Blackfriars to Sevenoaks.
Station | System | Voice | Platforms | Notes |
---|---|---|---|---|
Beckenham Hill | Atos | Anne | Global | Owned by Southeastern untill 2018. |
Bedford | Atos | Anne | 1-1a, 4 | P1A used for Marston Vale line trains only. |
Matt | 2-3 | |||
Bellingham | Atos | Anne | Global | Owned by Southeastern untill 2018. |
Brent Cross West | Atos | Matt | 1-2 | Opened on 10th December 2023.
P1/2 - Matt - Slow line platforms. P3/4 - Anne - Fast line platforms that are only used in an emergency or when the slow lines are shut. Anne also does global 61016 message. Infotec white screens on all 4 platforms. |
Anne | 3-4 | |||
Catford | Atos | Anne | 1 | Owned by Southeastern before 2018. |
Matt | 2 | |||
City Thameslink | Atos | Anne | 2 | |
Matt | 1 | |||
Cricklewood | Atos | Anne | 1, 4 | Platforms 3 and 4 are fast lines which are only used in an emergency or when the slow lines are shut. |
Matt | 2, 3 | |||
Crofton Park | Atos | Anne | Global | |
Denmark Hill | Atos | Anne | 1, 4 | Two announcements per train. Formerly a Southeastern station. |
Matt | 2-3 | |||
Elephant & Castle | Atos | Anne | 1+4 | |
Matt | 2-3 | |||
Elstree & Borehamwood | Atos | Anne | Global | P3/4 Fast Line platforms and only used in a emergency or when the slow lines are shut. |
Farringdon | Atos | Anne | 3 | P1+2 - London Underground.
PA+B - Elizabeth line. |
Matt | 4 | |||
Flitwick | Atos | Anne | Global | P3/4 Fast Line platforms and only used in a emergency or when the slow lines are shut. |
Harlington | Atos | Anne | Global | P3/4 Fast Line platforms and only used in a emergency or when the slow lines are shut. |
Harpenden | Atos | Anne | 1+4 | P3/4 Fast Line platforms and only used in a emergency or when the slow lines are shut. |
Matt | 2-3 | |||
Haydons Road | Atos | Anne | Global | |
Hendon | Atos | Matt | 2-3 | P3/4 Fast Line platforms and only used in a emergency or the slow lines are shut. |
Anne | 1, 4 | |||
Kentish Town | Atos | Anne | 1 | Platform 3 is only used during peak hours.
Platform 4 does have a CIS screen but no announcements due to it not being used by passenger services. |
Matt | 2-3 | |||
Leagrave | Atos | Anne | Global | P3/4 Fast Line platforms and only used in a emergency or the slow lines are shut. |
Loughborough Junction | Atos | Anne | Global | |
London Blackfriars | Atos | Anne | 1, 2-3, 4 | Mark Stutter does Inspector Sands and evacuation.
Platforms 3 and 4 are bay platforms. Anne took over Matt on P1 in 2023. |
Luton | Atos | Matt | 3-4 | |
Anne | 1-2, 5 | |||
Luton Airport Parkway | Atos | Anne | 1, 4 | The first ever station to have Atos Anne installed in 1999. Anne was replaced by Phil (Amey/Ditra) in 2003 then Phil (Funkwerk) in 2007. Anne and Matt have since replaced Phil in 2011. |
Matt | 2, 3 | |||
Mill Hill Broadway | Atos | Anne | Global | Station is right next to the M1.
Noise from the M1 and passing fast trains sometimes make the announcements seem quiet. P3/4 Fast Line platforms and only used in a emergency or when the slow lines are shut. |
Morden South | Atos | Anne | Global | |
Nunhead | Atos | Anne | Global | |
Radlett | Atos | Anne | 1 | P3/4 Fast Line platforms and only used in a emergency or when the slow lines are shut. |
Matt | 2 | |||
Ravensbourne | Atos | Anne | Global | Owned by Southeastern before 2018. |
South Merton | Atos | Anne | Global | |
St Albans City | Atos | Anne | 1+4 | Platforms 3 and 4 are fast line platforms. |
Matt | 2-3 | |||
St Helier | Atos | Anne | Global | |
St Pancras International | Atos | Matt | A | Anne announces Northbound and Matt announces Southbound. Announcement volume tends to fluctuate some announcements will go loud and then go quiet. |
Anne | B | |||
Sutton Common | Atos | Anne | Global | |
Tooting | Atos | Anne | Global | |
West Hampstead Thameslink | Atos | Anne | 1+4 | Platforms 3 and 4 are also used by passing EMR trains. |
Matt | 2-3 | |||
West Sutton | Atos | Anne | 1 | |
Matt | 2 | |||
Wimbledon Chase | Atos | Anne | Global |
TransPennine Express stations[]
From 28th May 2023, TransPennine Express has been operated by the Government and is now called "TransPennine Trains", although Anne, Celia and Karen still say "TransPennine Express".
Station | System | Voice | Platforms | Notes |
---|---|---|---|---|
Barnetby | Atos | Anne | Global | 1 Announcement Per Train (When train approaching platform).
If a message is playing as a train arrives into a platform, the train will go unannounced. P1/4 mainly used for stopping freight trains and rearly used by normal passenger trains. |
Brough | Atos | Anne | Global | |
Cleethorpes | Atos | Anne | Global | |
Dewsbury | Atos | Anne | Global | |
Grimsby Town | Atos | Anne | Global |
Trains announced 3 minutes before arrival/departure. Terminating services are unannounced. P3 mainly used by EMR terminating services via Lincoln. |
Huddersfield | Atos | Anne | Global | |
Hull | Atos | Anne | Global | |
Malton | Atos | Anne | 1 | Only one platform. |
Manchester Airport | Atos | Anne | Global | Anne arrived in August 2018, Formerly manual. |
Middlesbrough | Atos | Anne | Global | |
Northallerton | Atos | Anne | 1,2 | |
Scarborough | Atos | Anne | Global | Terminating services are not announced.
Announcements go off 2 mins before departure. |
Scunthorpe | Atos | Anne | Global | Terminating services are announced.
Trains announced 3 minutes before arrival/departure. |
Seamer | Atos | Anne | Global | |
Selby | Atos | Anne | Global | |
Stalybridge | Atos | Anne | Global |
|
Thirsk | Atos | Anne | Global | |
Thornaby | Atos | Anne | Global | |
Yarm | Atos | Anne | Global |
Transport for Greater Manchester[]
TfGM currently only own one National Rail station, Horwich Parkway but they do envisage on managing more stations in the future.
Station | System | Voice | Platforms | Notes |
---|---|---|---|---|
Horwich Parkway | KeTech | Celia | Global | Celia was installed in 2022, along with new speakers.
Despite the station being managed by TfGM, the KeTech CIS is still managed by Northern. |
Transport for Wales (Trafnidiaeth Cymru) stations[]
All stations that have bilingual announcements have Welsh announced first, unless otherwise stated. Stations in England do not have bilingual announcements.
Most stations without Ruth & Eryl use Geraint, with announcements being played through the destination boards in both English and Welsh. Some smaller stations have no announcments at all.
Geraint is the new Welsh voice, for the Transport for Wales Text to Speech system, having replaced Acapela Rachel in Circa 2019 in order to meet Welsh Language Standards. Just like Acapela Rachel, Geriant also announces through the CIS screen(s).
According to the a FOI request, TfW plan to replace Ruth with Elin at their stations to match their new 197s, 231s, 398s, 756s and Mk4 sets but no timescale has been given on this yet.[4]
Station | System | Voice | Platforms | Notes |
---|---|---|---|---|
Aber | MicroPA | Geriant | 1, 2 | |
Abercynon | MicroPA | Geriant | 1 | Acapela Peter seems to be announcer at Abercynon station. |
Aberdare / Aberdar | MicroPA | Geriant | 1 | |
Aberdovey / Aberdyfi | MicroPA | Geriant | 1 | |
Aberech | MicroPA | Geriant | 1 | |
Abergele & Pensarn / Abergele a Phensarn | MicroPA | Geriant | 1, 2 | |
Abergavenny / Y Fenni | Atos | Ruth & Eryl | Global | Two announcements per train.
ASL 2-note chime interrupts the start of all automated announcements. |
Aberystwyth | Atos | Ruth & Eryl | 1 | Announcements are quiet. Chimes in use. |
Ammanford / Rhydaman | MicroPA | Geriant | 1 | |
Baglan | MicroPA | Geriant | 1, 2 | |
Bangor | Atos | Ruth & Eryl | Global | |
Bargoed | Atos | Ruth & Eryl | 1, 2 | Has old Ditra screens similar to Connex ones. |
Barmouth / Abermaw | Atos | Ruth & Eryl | Global | Ruth & Glyn announce globally. Only 1 of 4 speakers are working. Acapela Rachel installed and ran simultaneously to Ruth and Glyn but Rachel was deactivated in 2020. Up to two announcements per train. Chimes in use. |
Barry / Y Barri | Atos | Ruth & Eryl | 1, 2 | All platforms individually zoned with announcements playing 5 minutes before arrival and as the train approaches. Footbridge plays all announcements. Chimes used. |
MicroPA | Geriant | 3 | Geraint currently running simultaneously from the CIS screen on Platform 3. | |
Barry Docks / Dociau'r Barri | MicroPA | Geriant | Global | |
Barry Island / Ynys y Barri | MicroPA | Geriant | 1 | |
Betws-y-Coed | MicroPA | Geriant | 1 | |
Blaenau Ffestiniog | MicroPA | Geriant | 1 | Platforms 2 and 3 are Ffestiniog Heritage Railway. |
Bodorgan | MicroPA | Geriant | 1, 2 | |
Birchgrove / Gellifedw | MicroPA | Geriant | 1 | |
Bridgend / Pen-y-bont ar Ogwr | Atos | Ruth & Eryl | Global | One announcement per train as the train approaches for through trains, trains still announced if a train departs; one announcement 3 minutes before departure if the train starts here.
Eryl's and Ruth's stand clear announcement is used as the same script as Anne's for Elizabeth Line. No mind the gap announcements and no zone announcement for GWR trains. |
Brithdir | MicroPA | Geriant | 1 | Announcements made through CIS screen. |
Borth | MicroPA | Geriant | 1 | |
Bow Street | Atos | Ruth & Eryl | Global | New station between Borth and Aberystwyth. Newest station on the TfW network which opened on 14th February 2021.
Has 1 platform and 1st station in TfW to have new White Infotec screens. |
Briton Ferry / Llansawel | MicroPA | Geriant | 1, 2 | |
Broome | MicroPA | Geriant | 1 | |
Buckley / Bwcle | MicroPA | Geriant | 1, 2 | |
Bucknell | MicroPA | Geriant | 1 | |
Builth Road / Heol Builth | MicroPA | Geriant | 1 | |
Butetown / Tre-biwt | TBC | TBC | TBC | New station between Cardiff Bay / Bae Caerdydd and Cardiff Queen Street / Caerdydd Heol y Frenhines expected to open in spring 2024. |
Bynea | MicroPA | Geriant | 1, 2 | |
Cadoxton / Tregatwg | MicroPA | Geriant | 1, 2 | |
Caergwrle | MicroPA | Geriant | 1, 2 | |
Caersws | MicroPA | Geriant | 1 | |
Caldicot / Cil-y-coed | MicroPA | Geriant | 1, 2 | |
Caerphilly / Caerffili | Atos | Ruth & Eryl | 1-2, 3 | P2 & 3 have old Ditra screens like Connex ones. |
Cardiff Bay / Bae Caerdydd | Atos | None | 1 | Departure board is a Data-Display model. No speakers at this station. |
Cardiff Central / Caerdydd Canolog | Atos | Ruth | 0-4, 6-8 | Zone formation is announced for GWR services. Usually at least two announcements per train on Platforms 0-4. One announcement per train on Platforms 6-8.
Platforms seperated into A and B in November 2022. There is no Platform 5. As of late 2023 Ruth & Glyn's platform alteration announcement now begins as "This is a platform alteration. The HH:MM service to <destination> will now depart from platform X." instead of "Your attention please on Platform X! This is a platform alteration. The next train to arrive at Platform X...". |
Eryl | ||||
Cardiff Queen Street / Caerdydd Heol y Frenhines | Atos | Ruth & Eryl | 1, 2, 3, 4, 5 | Announcements Zoned. Platform 1 used for shuttle service to Cardiff Bay / Bae Caerdydd. One announcement per train only as it approaches. |
Carmarthen / Caerfyrddin | Atos | Ruth & Eryl | Global | Zone formation is announced for GWR services. Two announcements per train. Chimes in use. |
Cathays | MicroPA | Geriant | Global | |
Cefn-y-Bedd | MicroPA | Geriant | Global | |
Chepstow / Cas-gwent | MicroPA | Geriant | Global | |
Chester / Caer | Atos | Ruth | 1-3, 4-5, 6-7 |
English announcements only. Announcements global on the footbridge. One announcement per train, usually 3 minutes before arrival or departure. Anne continues to reads "Northern" and "Merseyrail" (previously read "Merseyrail Electrics") for their respective services alongside Ruth, correct as of June 2023. |
Chirk / Y Waun | Atos | Ruth & Eryl | Global | |
Clarbeston Road / Heol Clarbeston | MicroPA | Geriant | Global | |
Colwyn Bay / Bae Colwyn | Atos | Ruth & Eryl | Global | Two announcements per train. |
Criccieth / Cricieth | MicroPA | Geriant | 1 | |
Crosskeys / Croeskeys | MicroPA | Geriant | 1, 2 | |
Cwmbach / Cwm-bach | MicroPA | Geriant | 1 | |
Cwmbran / Cwmbrân | Atos | Ruth & Eryl | Global | |
Cynghordy | MicroPA | Geriant | 1 | |
Church Stretton | MicroPA | Geriant | 1, 2 | |
Cilmeri | MicroPA | Geriant | 1 | |
Clunderwen | MicroPA | Geriant | 1, 2 | |
Cogan | MicroPA | Geriant | 1, 2 | |
Conwy | MicroPA | Geriant | 1, 2 | |
Coryton | MicroPA | Geriant | 1 | |
Craven Arms | MicroPA | Geriant | 1, 2 | |
Danescourt | MicroPA | Geriant | 1, 2 | |
Deganwy | MicroPA | Geriant | 1, 2 | |
Dinas (Rhondda) | Atos | Ruth & Eryl | 1, 2 | Reopened 26th February 2024. |
Dinas Powys | MicroPA | Geriant | 1, 2 | Vale of Glamorgan line. |
Dingle Road / Heol Dingle | MicroPA | Geriant | 1 | |
Dolau | MicroPA | Geriant | 1 | |
Dolwyddelan | MicroPA | Geriant | 1 | Previously had a help point voiced by Glyn + Ruth. |
Dovey Junction / Cyffordd Dyfi | MicroPA | Geriant | Global | |
Dyffryn Ardudwy | MicroPA | Geriant | 1 | |
Eastbrook | MicroPA | Geriant | 1, 2 | |
Ebbw Vale Parkway / Parcffordd Glyn Ebwy | MicroPA | Geriant | Global | |
Ebbw Vale Town / Tref Glyn Ebwy | MicroPA | Geriant | 1 | |
Energlyn & Churchill Park / Eneu'r-glyn a Pharc Churchill | MicroPA | Geriant | 1, 2 | Geriant announces Welsh first then English. |
Fairbourne | MicroPA | Geriant | 1 | |
Fairwater | MicroPA | Geriant | 1, 2 | |
Fernhill | MicroPA | Geriant | 1 | |
Ferryside / Glanyfferi | MicroPA | Geriant | 1, 2 | |
Ffairfach | MicroPA | Geriant | 1 | |
Fishguard & Goodwick / Abergwaun ac Wdig | MicroPA | Geriant | 1 | |
Fishguard Harbour / Porthladd Abergwaun | MicroPA | Geriant | 1 | |
Flint / Y Fflint | Atos | Ruth & Eryl | Global | |
Frodsham | MicroPA | Geriant | 1, 2 | |
Garth (Bridgend/Mid Glamorgan) / Garth (Pen-y-bont ar Ogwr/Morgannwg Ganol) | MicroPA | Geriant | 1 | Maesteg branch. |
Garth (Powys) | MicroPA | Geriant | 1 | Heart of Wales line. |
Gilfach Fargoed | MicroPA | Geriant | 1, 2 | |
Glan Conwy | MicroPA | Geriant | 1 | |
Gobowen | Atos | Ruth | Global | |
Gowerton / Tre-gŵyr | MicroPA | Geriant | 1, 2 | |
Grangetown | MicroPA | Geriant | 1, 2 | |
Gwersyllt | MicroPA | Geriant | 1, 2 | |
Harlech | Atos | Ruth & Eryl | Global | Two announcements per train. |
Haverfordwest / Hwlffordd | Atos | Ruth & Eryl | 1 | No CIS on Platform 2. |
Hawarden / Penarlâg | MicroPA | Geriant | 1, 2 | |
Hawarden Bridge / Pont Penarlâg | MicroPA | Geriant | 1, 2 | |
Heath High Level / Lefel Uchel y Mynydd Bychan | MicroPA | Geriant | 2 | Platform 2 had CIS screen similar to Connex until early summer 2021 replaced with the New White LED Infotec screen. |
Heath Low Level / Lefel Isel y Mynydd Bychan | MicroPA | Geriant | 1 | |
Helsby | MicroPA | Geriant | 1, 2 | |
Hengoed | MicroPA | Geriant | 1, 2 | |
Hereford / Henffordd | Atos | Ruth | Global | Three announcements per train. |
Heswall | MicroPA | Geriant | 1, 2 | |
Holyhead / Caergybi | Atos | Ruth & Eryl | 1, 2, 3 | |
Hope / Yr Hôb (Clwyd) | MicroPA | Geriant | 1, 2 | |
Hopton Heath / Heath Hopton | MicroPA | Geriant | 1 | |
Johnston | MicroPA | Geriant | 1 | |
Kidwelly / Cydweli | MicroPA | Geriant | 1, 2 | |
Kilgetty / Cilgeti | MicroPA | Geriant | 1 | |
Knighton / Trefyclo | MicroPA | Geriant | 1, 2 | |
Knucklas / Cwnclas | MicroPA | Geriant | 1 | |
Lamphey / Llandyfái | MicroPA | Geriant | 1 | |
Leominster / Llanllieni | MicroPA | Geriant | 1, 2 | Bilingual announcements despite the station being located in England. |
Lisvane & Thornhill / Llys-faen a Draenen Pen-y-Graig | MicroPA | Geriant | 1, 2 | |
Llanaber | MicroPA | Geriant | 1 | |
Llanbedr | MicroPA | Geriant | 1 | |
Llanbister Road / Heol Llanbister | MicroPA | Geriant | 1 | |
Llanbradach | MicroPA | Geriant | 1, 2 | |
Llandanwg | MicroPA | Geriant | 1 | Announcements made through the CIS screen. |
Llandecwyn | MicroPA | Geriant | 1 | |
Llandeilo | MicroPA | Geriant | 1, 2 | |
Llandovery / Llanymddyfri | MicroPA | Geriant | 1, 2 | |
Llandrindod | MicroPA | Geriant | 1, 2 | |
Llanelli | Atos | Ruth & Eryl | Global | No Chimes. Zone formation is announced for GWR services.
Announcements were broken in late 2019/early 2020, announcements have been fixed in 2021. |
Ludlow / Llwydlo | Atos | Ruth | Global | Two announcements per trains. English announcements only. 'See it, say it, sorted' played in both languages despite the station being located in England. Delays not announced. |
Llandaf | Atos | Ruth & Eryl | Global | Two announcements per train.
ASL 2-note chime interrupts the start of all automated announcements. |
Llandudno | Atos | Ruth & Eryl | 1, 2, 3 | |
Llandudno Junction / Cyffordd Llandudno | Atos | Ruth & Eryl | 1-2, 3, 4 | Two announcements per train. Chimes in use. |
Llandybie | MicroPA | Geriant | 1 | |
Llanfairfechan | MicroPA | Geriant | 1, 2 | |
Llanfairpwll | MicroPA | Geriant | Global | |
Llangadog | MicroPA | Geriant | 1 | |
Llangammarch | MicroPA | Geriant | 1 | |
Llangennech | MicroPA | Geriant | 1, 2 | |
Llangynllo | MicroPA | Geriant | 1 | |
Llanharan | MicroPA | Geriant | 1, 2 | |
Llanhilleth / Llanhiledd | MicroPA | Geriant | 1, 2 | Platform 2 was added in December 2023. |
Llanishen / Llanisien | MicroPA | Geriant | 1, 2 | |
Llanrwst | MicroPA | Geriant | 1 | |
Llansamlet | MicroPA | Geriant | 1, 2 | |
Llantwit Major / Llanilltud Fawr | MicroPA | Geriant | 1, 2 | |
Llanwrda | MicroPA | Geriant | 1 | |
Llanwrtyd | MicroPA | Geriant | 1, 2 | |
Llwyngwril | MicroPA | Geriant | 1 | |
Llwynypia | MicroPA | Geriant | 1 | Reopened 26th February 2024. |
Lydney | MicroPA | Geriant | 1, 2 | |
Machynlleth | Atos | Ruth & Eryl | Global | Up to two announcements per train. Chimes in use. |
Maesteg | MicroPA | Geriant | 1 | |
Maesteg (Ewenny Road) / Maesteg (Heol Ewenni) | MicroPA | Geriant | 1 | |
Manorbier / Maenorbyr | MicroPA | Geriant | 1 | |
Merthyr Tydfil / Merthyr Tydful | MicroPA | Geriant | 1 | |
Merthyr Vale / Bro Merthyr | MicroPA | Geriant | 1, 2 | |
Milford Haven / Aberdaugleddau | Atos | Ruth & Eryl | 1 | |
Minffordd | MicroPA | Geriant | 1 | Platforms 2 & 3 are Ffestiniog Heritage Railway. |
Morfa Mawddach | MicroPA | Geriant | 1 | |
Mountain Ash / Aberpennar | MicroPA | Geriant | 1, 2 | |
Nantwich | MicroPA | Geriant | 1, 2 | |
Narberth / Arberth | MicroPA | Geriant | 1 | |
Neath / Castell-Nedd | Atos | Ruth & Eryl | Global | Two announcements per train. Zone formation is announced for GWR services. |
Neston | MicroPA | Geriant | 1, 2 | |
Newbridge | MicroPA | Geriant | 1, 2 | Platform 2 was added in December 2023. |
Newport / Casnewydd | Atos | Ruth | Global | English plays first of the bilingual announcements.
Generally 2 announcements per train. As of January 2024, Glyn now says new delay reasons, zones and "Worcestershire Parkway.". |
Eryl | ||||
Newtown / Y Drenewydd | Atos | Ruth & Eryl | Global | |
Ninian Park / Parc Ninian | MicroPA | Geriant | Global | |
North Llanrwst / Gogledd Llanrwst | MicroPA | Geriant | 1, 2 | |
Pantyffynnon | MicroPA | Geriant | 1 | Platform 2 is disused and is used by freight trains to/from Tairgwaith Colliery. |
Pembrey and Burry Port / Pen-bre a Phorth Tywyn | MicroPA | Geriant | 1, 2 | |
Pembroke / Penfro | MicroPA | Geriant | 1 | |
Pembroke Dock / Doc Penfro | MicroPA | Geriant | 1 | |
Pen-y-Bont | MicroPA | Geriant | 1 | |
Penally | MicroPA | Geriant | 1 | |
Penarth | MicroPA | Geriant | 1 | |
Pencoed | MicroPA | Geriant | 1, 2 | |
Pengam | MicroPA | Geriant | 1, 2 | |
Penhelig | MicroPA | Geriant | 1 | |
Penmaenmawr | MicroPA | Geriant | 1, 2 | |
Penrhiwceiber | MicroPA | Geriant | 1 | |
Penrhyndeudraeth | MicroPA | Geriant | 1 | |
Penychain | MicroPA | Geriant | 1 | |
Pentre-Bach | MicroPA | Geriant | 1 | |
Pensarn | MicroPA | Geriant | 1 | |
Penyffordd | MicroPA | Geriant | 1, 2 | |
Pont-y-Pant | MicroPA | Geriant | 1 | |
Pontarddulais | MicroPA | Geriant | 1 | |
Pontlottyn / Pontlotyn | MicroPA | Geriant | 1, 2 | |
Pontyclun | MicroPA | Geriant | 1, 2 | |
Pontypool & New Inn / Pont-y-pŵl a New Inn | MicroPA | Geriant | 1, 2 | |
Pontypridd | Atos | Ruth & Eryl | 1, 2, 3 | Chimes used. Two announcements per train. All platforms announced at the entrance, on the stairs and on the footbridge. |
Port Talbot Parkway / Parcffordd Port Talbot | Atos | Ruth & Eryl | Global | Two announcements per train. |
Porth | MicroPA | Geriant | 1, 2 | Reopened 26th February 2024. |
Porthmadog | MicroPA | Geriant | Global | |
Prees | MicroPA | Geriant | Global | |
Prestatyn | Atos | Ruth & Eryl | Global | |
Pwllheli | Atos | Ruth & Eryl | 1 | |
Pye Corner / Cornel Pye | MicroPA | Geriant | Global | |
Pyle / Y Pîl | MicroPA | Geriant | 1, 2 | |
Quakers Yard / Mynwent y Crynwyr | MicroPA | Geriant | 1 | |
Radyr / Radur | MicroPA | Geriant | 1, 2-3 | Announcements made through the CIS screen. |
Rhiwbina / Rhiwbeina | MicroPA | Geriant | 1 | |
Rhoose Cardiff International Airport / Y Rhws Maes Awyr Rhyngwladol Caerdydd | MicroPA | Geriant | 1, 2 | |
Rhosneigr | MicroPA | Geriant | 1, 2 | |
Rhyl | Atos | Ruth & Eryl | Global | |
Rhymney / Rhymni | MicroPA | Geriant | Global | Only one platform. |
Risca & Pontymister / Rhisga a Phont-y-meistr | MicroPA | Geriant | Global | |
Rogerstone / Tŷ-du | MicroPA | Geriant | Global | |
Roman Bridge / Pont Rufeinig | MicroPA | Geriant | 1 | |
Ruabon / Rhiwabon | Atos | Ruth & Eryl | Global | |
Runcorn East / Runcorn Dwyrain | MicroPA | Geriant | Global | |
Sarn | MicroPA | Geriant | 1 | |
Saundersfoot | MicroPA | Geriant | 1 | |
Severn Tunnel Junction / Cyffordd Twnnel Hafren | MicroPA | Geriant | Global | |
Shotton | MicroPA | Geriant | 1, 2, 3, 4 | |
Shrewsbury / Amwythig | Atos | Ruth | Global | Announcements in English only. Chimes are played before each announcement.
Platforms 1 & 2 do not exist. Usually 2-3 announcements per train. |
Skewen / Sgiwen | MicroPA | Geriant | 1, 2 | |
Sugar Loaf / Dinas y Bwlch | MicroPA | Geriant | 1 | |
Swansea / Abertawe | Atos | Ruth | Global | Generally two announcements per train.
Zone formation is announced for GWR services. New Infotec white writing LED screens and TfW theme LED Departure screens installed on 16th March 2021. |
Eryl | ||||
Taffs Well / Ffynnon Taf | MicroPA | Geriant | 1, 2 | |
Tal-y-Cafn | MicroPA | Geriant | 1 | |
Talsarnau | MicroPA | Geriant | 1 | |
Talybont | MicroPA | Geriant | 1 | |
Tenby / Dinbych-y-pysgod | MicroPA | Geriant | 1, 2 | |
Tir-Phil | MicroPA | Geriant | 1, 2 | |
Ton Pentre | MicroPA | Geriant | 1 | Reopened 26th February 2024. |
Tondu | MicroPA | Geriant | 1 | |
Tonfanau / Tonfannau | MicroPA | Geriant | 1 | |
Tonypandy | MicroPA | Geriant | 1 | Reopened 26th February 2024. |
Trefforest | Atos | Ruth & Eryl | 1, 2 | One announcement per train as it approaches. |
Trefforest Estate / Ystad Trefforest | MicroPA | Geriant | Global | |
Trehafod | MicroPA | Geriant | 1, 2 | Reopened 26th February 2024. |
Treherbert | Atos | Ruth & Eryl | 1-2 | Reopened 26th February 2024. Two announcements per train. |
Treorchy / Treorci | MicroPA | Geriant | 1 | Reopened 26th February 2024. |
Troed-y-Rhiw | MicroPA | Geriant | 1 | |
Ty Croes | MicroPA | Geriant | 1, 2 | |
Ty Glas | MicroPA | Geriant | 1 | |
Tygwyn | MicroPA | Geriant | 1 | |
Tywyn | Atos | Ruth & Eryl | Global | |
Upton | MicroPA | Geriant | 1, 2 | |
Valley / Y Dyffryn | MicroPA | Geriant | 1, 2 | |
Waun-gron Park / Parc Waun-Gron | MicroPA | Geriant | Global | |
Welshpool / Trallwng | MicroPA | Geriant | Global | |
Wem | MicroPA | Geriant | Global | Previously Rachel but faulty. |
Whitchurch (Glamorgan) / Eglwys Newydd (Morgannwg) | MicroPA | Geriant | 1 | Coryton line. |
Whitchurch (Shropshire) / Eglwys Newydd (Swydd Amwythig) | MicroPA | Geriant | 1, 2 | Welsh Marches line. |
Whitland / Hendy-gwyn | MicroPA | Geriant | 1, 2 | |
Wildmill / Felin wyllt | MicroPA | Geriant | 1 | |
Wrenbury | MicroPA | Geriant | 1, 2 | |
Wrexham Central / Wrecsam Canolog | MicroPA | Geriant | 1 | |
Wrexham General / Wrecsam Cyffredinol | Atos | Ruth & Eryl | Global | Two announcements per train. |
Ynyswen | MicroPA | Geriant | 1 | Station will reopen in late 2024. |
Yorton | MicroPA | Geriant | 1, 2 | |
Ystrad Mynach | MicroPA | Geriant | 1, 2 | |
Ystrad Rhondda | MicroPA | Geriant | 1, 2 | Reopened 26th February 2024. |
West Midlands Railway (WMR) stations[]
Most stations with announcements are Global Amy. WMR stations typically have one announcement per train, played when the train is arriving at the station (e.g. Platform 2, for the 13:48 West Midlands Railway service to Kidderminster. Calling at: Cradley Heath, Stourbridge Junction, Hagley, Blakedown and Kidderminster. This train has six carriages.). Specifics will be listed below as and when. SP - e.g. Please make sure you travel in the correct part of the train'
It has been confirmed by station staff at WMR/LNR that Anne will be replaced by Ivona Amy in the future as Abellio holds 70% of the company and will use the same settings as Greater Anglia.
Most or All stations owned by LNR/WMR now have NEW CIS screens. Amy has replaced Anne on the Chase and Snow Hill lines except Bordesley which is only served by 1 train per day on Saturdays from Whitlocks End to Kidderminster (no trains on Mondays to Fridays or Sundays) and therefore does not have Amy or any CIS screens installed.
Station | System | Voice | Platforms | Notes |
---|---|---|---|---|
Acocks Green | Blackbox | Ivona Amy | Global | Anne replaced in September/October 2023. |
Alvechurch | Blackbox | Ivona Amy | Global | Anne replaced in September/October 2023. |
Albrighton | Blackbox | Ivona Amy | 1, 2 | Anne replaced in September/October 2023. |
Aston | Blackbox | Ivona Amy | Global | Anne replaced in September/October 2023. |
Barnt Green | Blackbox | Ivona Amy | Global | Amy replaced Anne in August/September 2023. |
Bedworth | Blackbox | Ivona Amy | Global | Nuneaton line. Amy replaced Anne in August/September 2023. |
Bermuda Park | Blackbox | Ivona Amy | 1, 2 | Nuneaton line. |
Bearley | Blackbox | Ivona Amy | Global | Amy replaced Anne in 2023. |
Bescot Stadium | Blackbox | Ivona Amy | Global | |
Billbrook | Blackbox | Ivona Amy | 1, 2 | Has new CIS Screens. |
Birmingham Snow Hill | Blackbox | Ivona Amy | 1-2, 3 | Amy replaced Anne in December 2022. |
Blakedown | Blackbox | Ivona Amy | Global | Amy replaced Anne in December 2022. |
Blake Street | Blackbox | Ivona Amy | Global | |
Bloxwich | Blackbox | Ivona Amy | Global | |
Bloxwich North | Blackbox | Ivona Amy | Global | |
Bournville | Blackbox | Ivona Amy | Global | |
Bromsgrove | Blackbox | Ivona Amy | Global | Amy replaced Anne in late 2022. |
Butlers Lane | Blackbox | Ivona Amy | Global | |
Cannock | Blackbox | Ivona Amy | Global | |
Cradley Heath | Blackbox | Ivona Amy | Global | Amy replaced Anne in December 2022. |
Chester Road | Blackbox | Ivona Amy | Global | |
Claverdon | Blackbox | Ivona Amy | Global | Amy replaced Anne in 2023. |
Codsall | Blackbox | Ivona Amy | 1, 2 | |
Colwall | Blackbox | Ivona Amy | Global | |
Coseley | Blackbox | Ivona Amy | Global | Received new customer information screens. |
Cosford | Blackbox | Ivona Amy | Global | |
Coventry Arena | Blackbox | Ivona Amy | 1, 2 | |
Danzey | Blackbox | Ivona Amy | Global | Was request stop until May 2023. |
Droitwich Spa | Blackbox | Ivona Amy | 1, 2 | Amy replaced Anne in December 2022. |
Dudley Port | Blackbox | Ivona Amy | Global | |
Duddeston | Blackbox | Ivona Amy | Global | |
Earlswood (West Midlands) | Blackbox | Ivona Amy | Global | Amy replaced Anne in 2023. |
Erdington | Blackbox | Ivona Amy | Global | |
Five Ways | Blackbox | Ivona Amy | Global | |
Four Oaks | Blackbox | Ivona Amy | Global | |
Gravelly Hill | Blackbox | Ivona Amy | Global | |
Great Malvern | Blackbox | Ivona Amy | Global | Amy replaced Anne at an unknown date in 2022/2023. |
Hagley | Blackbox | Ivona Amy | Global | Amy replaced Anne at an unknown date in 2022/2023. |
Hall Green | Blackbox | Ivona Amy | Global | Amy replaced Anne in December 2022. |
Hamstead | Blackbox | Ivona Amy | Global | |
Hartlebury | Blackbox | Ivona Amy | Global | |
Hednesford | Blackbox | Ivona Amy | Global | |
Henley-in-Arden | Blackbox | Ivona Amy | Global | Amy replaced Anne in December 2022. |
Jewellery Quarter | Blackbox | Ivona Amy | 1-2 | |
Unknown | Elinor Hamilton | 3-4 | West Midlands Metro. | |
Kenilworth | Blackbox | Ivona Amy | Global | Nuneaton line. Station opened on 30th April 2018 with Network Rail signage rather then WMR. |
Kidderminster | Blackbox | Ivona Amy | Global | |
Kings Norton | Blackbox | Ivona Amy | 1, 4 | Platforms 2 & 3 are disused. There are plans to have the disused platforms reinstated for the restoration of the Camp Hill line. Amy replaced Anne in August/September 2023. |
Landywood | Blackbox | Ivona Amy | Global | |
Langley Green | Blackbox | Ivona Amy | Global | |
Lea Hall | Blackbox | Ivona Amy | Global | |
Ledbury | Blackbox | Ivona Amy | Global | |
Lichfield City | Blackbox | Ivona Amy | Global | |
Lye | Blackbox | Ivona Amy | 1, 2 | Amy replaced Anne in December 2022. |
Longbridge | Blackbox | Ivona Amy | Global | Amy replaced Anne in August/September 2023. |
Malvern Link | Blackbox | Ivona Amy | 1, 2 | Amy replaced Anne. |
Northfield | Blackbox | Ivona Amy | 1, 4 | Platforms 2 & 3 are disused. There are plans to have the disused platforms reinstated for the restoration of the Camp Hill line. Amy replaced Anne in August/September 2023. |
Oakengates | Blackbox | Ivona Amy | 1, 2 | |
Old Hill | Blackbox | Ivona Amy | Global | Amy replaced Anne in December 2022. |
Olton | Blackbox | Ivona Amy | Global | Amy replaced Anne in December 2022. |
Perry Barr | Blackbox | Ivona Amy | 1, 2 | Amy arrived at Perry Barr when the station reopened after upgrade works were complete |
Redditch | Blackbox | Ivona Amy | 1 | Only one platform. |
Rowley Regis | Blackbox | Ivona Amy | Global | Amy replaced Anne in December 2022. |
Rugeley Town | Blackbox | Ivona Amy | Global | |
Sandwell & Dudley | Blackbox | Ivona Amy | Global | |
Selly Oak | Blackbox | Ivona Amy | Global | Selly Oak has received new customer information screens. Anne replaced by Amy in August/September 2023. |
Shenstone | Blackbox | Ivona Amy | Global | |
Shifnal | Blackbox | Ivona Amy | 1, 2 | |
Shirley | Blackbox | Ivona Amy | Global | Amy replaced Anne in December 2022. |
Small Heath | Blackbox | Ivona Amy | Global | |
Smethwick Galton Bridge | Blackbox | Ivona Amy | Global | Ivona Amy replaced Anne in 2023 |
Smethwick Rolfe Street | Blackbox | Ivona Amy | Global | |
Spring Road | Blackbox | Ivona Amy | Global | Amy replaced Anne in December 2022. |
Stechford | Blackbox | Ivona Amy | Global | |
Stone | Blackbox | Ivona Amy | Global | Stone is WMR not LNWR. |
Stourbridge Junction | Blackbox | Ivona Amy | Global | Anne replaced by Ivona Amy in late 2022. |
Stourbridge Town | Blackbox | Ivona Amy | Global | Anne replaced by Ivona Amy in late 2022. Only one platform. |
Stratford-Upon-Avon | Blackbox | Ivona Amy | Global | Amy replaced Anne in December 2022. |
Stratford-Upon-Avon Parkway | Blackbox | Ivona Amy | Global | Amy replaced Anne in December 2022. |
Sutton Coldfield | Blackbox | Ivona Amy | Global | |
Tame Bridge Parkway | Blackbox | Ivona Amy | Global | |
Telford Central | Blackbox | Ivona Amy | Global | |
The Hawthorns | Blackbox | Ivona Amy | 1-2 | Amy replaced Anne in December 2022. |
Unknown | Elinor Hamilton | 3-4 | West Midlands Metro. | |
The Lakes | Blackbox | Ivona Amy | 1, 2 | Was request stop until May 2023. |
Tipton | Blackbox | Ivona Amy | Global | |
Tyseley | Blackbox | Ivona Amy | Global | |
Walsall | Blackbox | Ivona Amy | Global | Very limited information being announced. Anne replaced Amy in August/September 2023. |
Wellington | Blackbox | Ivona Amy | 1, 2 | |
Whitlocks End | Blackbox | Ivona Amy | Global | Amy replaced Anne in 2023. |
Widney Manor | Blackbox | Ivona Amy | Global | Amy replaced Anne in December 2022. |
Wilmcote | Blackbox | Ivona Amy | Global | Amy replaced Anne in 2023. |
Wilnecote | Blackbox | Ivona Amy | Global | Served by CrossCountry services only.
Station is WMR branded not LNWR. |
Witton | Blackbox | Ivona Amy | Global | |
Wolverhampton | Blackbox | Ivona Amy | Global | Atos Anne replaced "Only Woman" in April 2018 when management of the station transferred from Virgin Trains to West Midlands Trains. Amy then replaced Anne in September 2023. |
Wood End | Blackbox | Ivona Amy | Global | Was request stop until May 2023. |
Worcester Foregate Street | Blackbox | Ivona Amy | Global | Amy replaced Anne replaced in mid-2023. |
Worcester Shrub Hill | Blackbox | Ivona Amy | Global | Amy replaced Anne in December 2022. |
Wootton Wawen | Blackbox | Ivona Amy | Global | Was request stop until May 2023. |
Wylde Green | Blackbox | Ivona Amy | Global | |
Wythall | Blackbox | Ivona Amy | Global | Amy replaced Anne in 2023. |
University | Blackbox | Ivona Amy | Global | University has received new customer information screens. |
Yardley Wood | Blackbox | Ivona Amy | Global | Amy replaced Anne in December 2022. |
References[]
- ↑ BHM announcementshttps://www.whatdotheyknow.com/request/birmingham_new_street_pa_options
- ↑ https://youtu.be/xchkeAEbpGo?si=wy6MwN0bhfMiqoM_&t=489
- ↑ FOI request made to Northern regarding KeTech automated annoucements:https://www.whatdotheyknow.com/request/ketech_automated_announcements_s#incoming-2189486
- ↑ Transport for Wales announcer FOI request: https://www.whatdotheyknow.com/request/922312/response/2188901/attach/html/2/FOI%202022%20509%20automated%20announcements.pdf.html